HomeMy WebLinkAboutF15-0091_plan 2_1451581860.pdfVail Valley Medical
Center
MOP# 0032b
Level 2 Barriers
UPUPDN
F.V.C.
(E)
37
37
UP
DN
T
DRESSING
T
ELEC (E)
LOCKER (E) 1'-5" TRANSITION BELOW
RISER COORDINATION
LEVEL 2
10/23/15
9'-8 1/4"
Proposed Stud/Plastic
Barrier with door to
Isolate Existing Dressing
and Toilet Room.
Temporary Access Code
required for Electronic
Lock.
HEPA Scrubber
HEPA Vacuum
Stick Mat
HEPA Fan Exhaust out to
window at south end of
corridor. Run along
ceiling.
Shaft wall to be
constructed at a later
phase. Chase will be
exposed for extended
period of time.
Drywall ceiling and walls
above ceiling to be
removed and patched
back.
Duct to be relocated at
plumb wall.
Sprinkler head and arm
in Dressing and Toilet to
be relocated to the
south within room.
21/2" Sprinkler Main
Relocate waste line.
Reconfigure exhaust
grille and duct.
Vail Fire & Emergency Services
12/31/15