HomeMy WebLinkAboutaction_form_drb_08-04-2017_59849ea4377c0-0.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Musella Residence 2017 Application Number: DRB17-0310
Application Type: Exterior Alteration Date Applied: 07/17/2017
Replace 2 windows and a door with a 3 panel Nana Wall unit. All trim and outside
Project Description: finish to remain same. NOTE: the 3 trapezoid windows above will still remain in
tact. 3 panel Nana wall fits into the same rough opening as original configuration
directly below the trap windows.
CONTACTS
Contact Type: Applicant
Full Name: Rob Halls Kitchens Plus (Rob Hall)
Address: PO Box Vail, CO 81658 Phone: 9708450945
Contact Type: Property Owner
Full Name: MUSELLA, ANTHONY E. & EILEEN P.
Address: Phone: None
Project Address: 5040 MAIN GORE PL E3 (210113105026 E3) (210113105026)
Job Site Location: E3
No
Legal Description: Subdivision: SUNDIAL PHASE 2 Lot: No Data Block: Data
Parcel Number: 210113105026
BOARDS/STAFF ACTION
Motion By: Kjesbo Action: Approved
Second By: Forstl
Vote: 5-0-0 Date: 08/02/2017
Conditions:
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- The applicant shall provide a letter from the Sundial Home Owner Association stating that any other
homeowner requesting modifications to the rear patio door and windows must use a similar bifold glass door
system to match appearance and function of the NanaWall system used in Unit E3 in order to maintain a
uniform and standardized exterior appearance.
Planner: Matt Panfil