Loading...
HomeMy WebLinkAboutB17-0272_A301_Elev copy_1501533960.pdfSheet Job#: Issued: Dwg. Name: Revision No. Date Seal Permit - 7-10-2017 Building Elevations 2017-012 A301 Reigel Remodel 2537 Arosa Drive Vail, Colorado LEAVE EXISTING COLUMN AND BEAM REMOVE EXISTING AREA OF WALL FOR NEW WINDOW FRAME INFILL - 2x6 FRAMING WITH " OSB ON EXTERIOR 12" OSB ON EXTERIOR AND " GYPSUM BOARD ON 58" GYPSUM BOARD ON INTERIOR - USE EXISTING ENTRY DOOR NEW WINDOW TO MATCH EXIST WINDOWS REMOVE EXISTING STEPS FRAME INFILL - MATCH EXISTING EXTERIOR NEW WINDOW TO MATCH EXIST WINDOWS HEADER PER STRUCTURAL VERIFY LOCATION IN FEILD FIELD VERIFY LOCATION REMOVE EXISTING SEE DETAIL FOR EGRESS WINDOW WELL INFORMATION REMOVE EXISTING DECKING, INSTALL NEW FLOORING PER OWNER OVER " PLYWOOD 34" PLYWOOD SHEATHING - BUILD-UP AS NECESSARY TO FLUSH OUT WITH EXIST INTERIOR FLOOR, INSTALL INSULATION & VAPOR BARRIER BELOW EXISTING PIER FOUNDATION TO EXISTING ROOF TO REMAIN EXISTING BEAM TO REMAIN - FRAME INFILL - 2x6 FRAMING WITH " OSB 12" OSB ON EXTERIOR AND " 58" GYPSUM BOARD ON INTERIOR - EXTERIOR FINISH TO MATCH EXIST NEW OPENING IN EXISTING REMOVE EXISTING DECKING, INSTALL NEW FLOORING PER OWNER OVER " PLYWOOD 34" PLYWOOD SHEATHING - BUILD- UP AS NECESSARY TO FLUSH OUT WITH EXIST INTERIOR FLOOR, INSTALL INSULATION & INSTALL R-21 BIB INSULATION AND VAPOR BARRIER UNDER ENTRY ADDITION TO MATCH EXIST EXISTING FOUNDATION - FIELD VERIFY INSTALL NEW BIB INSULATION TO MATCH EXISTING IN EXISTING HEADER TO MATCH EXISTING EXISTING FOUNDATION - NO WORK 07/31/17