HomeMy WebLinkAboutDRB17-0265_UtilApprov_1499797860.pdf UTILITY APPROVAL&VERIFICATION .�
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: 142 West Meadow Drive Lot 3 ' Block Subdivision:
Prim Co tact 1 Owner Representative: Kurt Segerberg Phone: 970-390-3518
ary
y
Co , Plans Dated: DRB 6/25/17
Pri ntact!Own z•resentati - Signature
Authorized Signature Comments Date
i
CENTURY LINK
970.328.8288(tel)
970.328.8282 (fax)
Contacts: Kelly McClernon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.244.2788(tel)
970.390.4777(cell)
970.244.2661 (fax)
Contact: Ron Smith
ron.smith@xcelenergy.com
HOLY CROSS ENERGY .%
970.947.5425(tel) ,
970.945.4081 (fax)
Contact: Jeff Vroom
Nroom@holycross.com
XCEL Energy
970.262.4032(tel)
970.262.4038(fax)
Contacts: Britt Mace
brittany.mace@xcelenergy.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel) '
970.845.7218 (fax)
Contact:Tug Birk
dbirk@erwsd.org 4re
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact: Michael Johnson
Michaeljohnson@cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
L
Sarah Mikkelsen-Krick
From: Roussin -CDOT, Daniel [daniel.roussin@state.co.us]
Sent: Friday, July 07, 2017 8:22 AM
To: Sarah Mikkelsen-Krick
Subject: Re: Utility Approval &Verification - 142 West Meadow Drive Vail Village
I have no comment on this development.
thanks
Dan
Dan Roussin
Permit Unit Manager
Traffic and Safety
P 970.683.6284 I F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniet.roussinCstate.co.us I www.codot.gov/ I www.cotrip.org
III II IIII
On Thu, Jul 6, 2017 at 7:24 PM, Sarah Mikkelsen-Krick<smikkelsenc;smarchs.com> wrote:
Please find attached to this email the Utility Approval and Verification form for 142 West Meadow Drive - Lot 3
Vail Village. I have also attached the drawings which were recently submitted to TOV for DRB approval dated
6/25/17 for your review.
Thank you,
Sarah
Sarah Mikkelsen-Krick
SEGERBERG MAYHEW ARCHITECTS
smikke(sen ci smarJhs.eom
Web Site:http://www.smarchs.com
x Virus-free. www.avq.com
7/7/2017