Loading...
HomeMy WebLinkAboutDRB17-0303_action_form_drb_08-08-2017_5989f75473bdf-0_1502214480.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: King Residence 2017 Application Number: DRB17-0303 Application Type: Exterior Alteration Date Applied: 07/13/2017 I would like to add a ground level deck on the back/North side of the house to match the deck that is present on the neighbor's side of the duplex. The new deck would be directly below an existing 2nd level deck on the North side of my Project Description: property. The proposed new ground level deck would extend out 4-6 feet in it's central third and be reinforced to accommodate a free standing hot tub. I would use Trex composite decking with the plan to convert the existing second story deck to composite decking next summer. CONTACTS Contact Type: Applicant Full Name: Jarrod King Address: 4885 Quaker Lane Golden, CO 80403 Phone: 7202366688 Contact Type: Property Owner Full Name: JARROD King Address: Phone: 7202366688 Project Address: 4840 MEADOW LN 2 (210113103003 2) (210113103003) Job Site Location: 2 Legal Description: Subdivision: BIGHORN SUBDIVISION 5TH Lot: 2 Block: 6 ADDITION Parcel Number: 210113103003 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 08/07/2017 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Prior to final Planning inspection, applicant shall revegetate all disturbed soils with seed mix, sod, or other vegetation. Planner: Chris Neubecker