Loading...
HomeMy WebLinkAboutDRB16-0212_A3-3 - Proposed Exterior Elevations_1478909036.pdfDrive & Parking Lot 70' - 0" Lower Level - Existing Plan 74' - 1 1/4" Main Level - Existing Plan 83' - 6" Upper Level - Existing Plan 94' - 1 1/4" Roof Level TH.1 104' - 10 3/4" 3 4 5 6 7 2 1 UNIT 6 UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1 NOTES: - Entry Mud Room Addition at Unit 6 - Living Room Addition at Unit 6 - Deck Extension at Units 1, 2, 3, & 5 - Bedroom Additions at Units 2 & 4 - Stucco finish on all wing walls - Plywood Sheathing & VaproShield "WrapShield R.S." Rainscreen replacement; vfy damaged locations @ exterior - Entry Mud Room Addition - Living Room Addition - Standing Seam Roof ≥ 3:12 - Stone Veneer - New Entry Door & Sidelight - New Windows & Doors - New Insulated Garage Door (to match door at Unit 3) - Deck Extension & Facade - Standing Seam Wall - Stone Veneer - Metal Clad Base Panels - New Entry Door & Sidelight - New Insulated Garage Door (to match door at Unit 3) - Deck Facade - Standing Seam Wall - Stone Veneer - Metal Clad Base Panels - New Entry Door & Sidelight - New Windows - New Insulated Garage Door (to match door at Unit 3) - Wood Beam for deck support to wing wall - Deck Extension & Facade - Standing Seam Metal Wall - Stone Veneer - Metal Clad Base Panels - New Entry Door & Sidelight - New Windows - New Insulated Garage Door (to match door at Unit 3) - Wood Beam for deck support to wing wall - Deck Extension & Facade - Standing Seam Wall - Stone Veneer - Metal Clad Base Panels - New Entry Door & Sidelight - Insulated Garage Door to remain - Deck Extension & Facade - Standing Seam Metal Wall - Stone Veneer - Metal Clad Base Panels - New Entry Door & Sidelight - New Insulated Garage Door (to match door at Unit 3) - New Unit Signage Fireplace Renovations - Stone Veneer Wall Surrounds - Metal Clad Fireplace Cap Roof Cap, Paint to match siding CVG 1x 6 Cedar T&G Siding Stucco finish w/ 3/8" Reglet A3.4 3 Deck Extensions - Cedar Fascia, 3x3 tube steel post w/ flat bar handrail, cable railing (powder coat vs paint) - Standing Seam Metal Wall (finish tbd) Metal Clad Base Panels on Stucco wing walls; vfy fastening system 48"AFF Exterior Wall Sconce, Dark Sky Approved Light Fixture, Finish TBD, 6'-0" typical height 6' typ ht Roof Additions at Unit 6 - Standing Seam Metal Roof - Facia to match Wood Siding - Snow Retention (clip type by roofer) 2 A3.4 - --- Lower Level - Existing Plan 74' - 1 1/4" Main Level - Existing Plan 83' - 6" Upper Level - Existing Plan 94' - 1 1/4" Roof Level TH.1 104' - 10 3/4" Roof Level - Existing Plan 111' - 0" EXISTING GRADE 8 9 10 11 12 13 14 Roof Cap, Paint to match Siding Stucco finish w/ 3/8" Reglet CVG 1x 6 Cedar T&G Siding Lower Level TH.5&6 78' - 3 5/8" Main Level TH.5&6 87' - 6" Roof Level - Existing Plan 111' - 0" Upper Level TH. 5&6 98' - 1 1/4" 8 9 10 11 12 13 14 CVG 1x 6 Cedar T&G Siding Stucco finish w/ 3/8" Reglet CVG 1x 6 Cedar T&G Siding Metal Cladding at base of wing walls Roof Cap, Paint to match siding Stucco finish w/ 3/8" Reglet at wing walls Project number Date Drawn by 4/25/2016 10:06:56 AM A3.3 Proposed Exterior Elevations ----Capstone Townhomes PROPOSED EXTERIOR RENOVATION 03-08-2016 BLU, KHW 1/8" = 1'-0" 1 East Elevation - Proposed No. Description Date 1/8" = 1'-0" 3 North Elevation - Proposed 1/8" = 1'-0" 4 South Elevation - Proposed DRB APPROVED 6/7/2016 12:00:00 AM