HomeMy WebLinkAboutDRB16-0212_A3-3 - Proposed Exterior Elevations_1478909036.pdfDrive & Parking Lot
70' - 0"
Lower Level -
Existing Plan
74' - 1 1/4"
Main Level - Existing
Plan
83' - 6"
Upper Level -
Existing Plan
94' - 1 1/4"
Roof Level TH.1
104' - 10 3/4"
3 4 5 6 7
2 1
UNIT 6 UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1
NOTES:
- Entry Mud Room Addition at Unit 6
- Living Room Addition at Unit 6
- Deck Extension at Units 1, 2, 3, & 5
- Bedroom Additions at Units 2 & 4
- Stucco finish on all wing walls
- Plywood Sheathing & VaproShield
"WrapShield R.S." Rainscreen
replacement; vfy damaged locations @
exterior
- Entry Mud Room Addition
- Living Room Addition
- Standing Seam Roof ≥ 3:12
- Stone Veneer
- New Entry Door & Sidelight
- New Windows & Doors
- New Insulated Garage Door
(to match door at Unit 3)
- Deck Extension & Facade
- Standing Seam Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Insulated Garage Door
(to match door at Unit 3)
- Deck Facade
- Standing Seam Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Windows
- New Insulated Garage Door
(to match door at Unit 3)
- Wood Beam for deck
support to wing wall
- Deck Extension & Facade
- Standing Seam Metal Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Windows
- New Insulated Garage Door
(to match door at Unit 3)
- Wood Beam for deck
support to wing wall
- Deck Extension & Facade
- Standing Seam Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- Insulated Garage Door to
remain
- Deck Extension & Facade
- Standing Seam Metal Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Insulated Garage Door
(to match door at Unit 3)
- New Unit Signage
Fireplace Renovations
- Stone Veneer Wall Surrounds
- Metal Clad Fireplace Cap
Roof Cap, Paint to match siding
CVG 1x 6 Cedar T&G Siding
Stucco finish w/ 3/8" Reglet
A3.4
3
Deck Extensions
- Cedar Fascia, 3x3 tube steel post w/ flat bar
handrail, cable railing (powder coat vs paint)
- Standing Seam Metal Wall (finish tbd)
Metal Clad Base Panels on Stucco wing
walls; vfy fastening system 48"AFF
Exterior Wall Sconce, Dark Sky Approved
Light Fixture, Finish TBD, 6'-0" typical height
6' typ ht
Roof Additions at Unit 6
- Standing Seam Metal Roof
- Facia to match Wood Siding
- Snow Retention (clip type by roofer)
2
A3.4 -
---
Lower Level -
Existing Plan
74' - 1 1/4"
Main Level - Existing
Plan
83' - 6"
Upper Level -
Existing Plan
94' - 1 1/4"
Roof Level TH.1
104' - 10 3/4"
Roof Level - Existing
Plan
111' - 0"
EXISTING GRADE
8
9
10 11 12 13 14
Roof Cap, Paint
to match Siding
Stucco finish w/
3/8" Reglet
CVG 1x 6 Cedar
T&G Siding
Lower Level TH.5&6
78' - 3 5/8"
Main Level TH.5&6
87' - 6"
Roof Level - Existing
Plan
111' - 0"
Upper Level TH. 5&6
98' - 1 1/4"
8 9 10 11 12 13 14
CVG 1x 6 Cedar
T&G Siding
Stucco finish w/
3/8" Reglet
CVG 1x 6 Cedar
T&G Siding
Metal Cladding at
base of wing walls
Roof Cap, Paint to
match siding
Stucco finish w/ 3/8"
Reglet at wing walls
Project number
Date
Drawn by
4/25/2016
10:06:56 AM
A3.3
Proposed Exterior Elevations
----Capstone
Townhomes
PROPOSED
EXTERIOR
RENOVATION
03-08-2016
BLU, KHW
1/8" = 1'-0"
1
East Elevation - Proposed
No. Description Date
1/8" = 1'-0"
3
North Elevation - Proposed
1/8" = 1'-0"
4
South Elevation - Proposed
DRB
APPROVED
6/7/2016 12:00:00
AM