HomeMy WebLinkAboutDRB16-0212_A3-6 - Rendered Elevations_1478909041.pdfDrive & Parking Lot
70' - 0"
Lower Level -
Existing Plan
74' - 1 1/4"
Main Level - Existing
Plan
83' - 6"
Upper Level -
Existing Plan
94' - 1 1/4"
Roof Level TH.1
104' - 10 3/4"
3 4 5 6 7
2 1
UNIT 6 UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1
Fireplace Cap Heights Inconsistant
Vertical Wood Siding at Fireplaces to be
replaced with alternate material
Horizontal Wood Siding to be replaced with
CVG 1x 6 Cedar T&G Siding
Stucco to be refinished with new
Drive & Parking Lot
70' - 0"
Lower Level -
Existing Plan
74' - 1 1/4"
Main Level - Existing
Plan
83' - 6"
Upper Level -
Existing Plan
94' - 1 1/4"
Roof Level TH.1
104' - 10 3/4"
3 4 5 6 7
2 1
UNIT 6 UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1
NOTES:
- Entry Mud Room Addition at Unit 6
- Living Room Addition at Unit 6
- Deck Extension at Units 1, 2, 3, & 5
- Bedroom Addition at Units 2 & 4
- Stucco at wing walls
- Plywood Sheathing & VaproShield
"WrapShield R.S." Rainscreen replacement;
vfy damaged locations @ exterior
- Entry Mud Room Addition
- Living Room Addition
- Standing Seam Roof ≥ 3:12
- Stone Veneer
- New Entry Door & Sidelight
- New Windows
- New Insulated Garage Door
(to match door at Unit 3)
- Wood Beam for living room
support to wing wall
- Deck Extension & Facade
- Standing Seam Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Insulated Garage Door
(to match door at Unit 3)
- Deck Facade
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Windows
- New Insulated Garage Door
(to match door at Unit 3)
- Deck Facade
- Standing Seam Metal Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Windows
- New Insulated Garage Door
(to match door at Unit 3)
- Deck Extension & Facade
- Standing Seam Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- Existing Insulated Garage
Door to remain
- Deck Extension & Facade
- Standing Seam Metal Wall
- Stone Veneer
- Metal Clad Base Panels
- New Entry Door & Sidelight
- New Insulated Garage Door
(to match door at Unit 3)
Deck Extensions
- Cedar Fascia, 3x3 tube steel post w/ flat bar
handrail, cable railing (powder coat vs paint)
- Standing Seam Metal Wall (finish tbd)
Metal Clad Base Panels on Stucco wing
walls; vfy fastening system 48"AFF
7' - 7"
Fireplace Renovations
- Stone Veneer Wall Surrounds
- Metal Clad Fireplace Cap
Roof Cap, Paint to match siding
CVG 1x 6 Cedar T&G Siding
Stucco finish w/ 3/8" Reglet
Exterior Wall Sconce, Dark Sky Approved Light
Fixture, Finish TBD, 6'-0" typical height
Roof Additions at Unit 6
- Standing Seam Metal Roof
- Facia to match Wood Siding
- Snow Retention (clip type by roofer)
-
---
Project number
Date
Drawn by
4/25/2016
10:07:45 AM
A3.6
Rendered Elevations
----Capstone
Townhomes
PROPOSED
EXTERIOR
RENOVATION
03-08-2016
BLU, KHW
1/8" = 1'-0"
1
East Elevation - Existing - Rendered
1/8" = 1'-0"
2
East Elevation - Proposed - Rendered
No. Description Date
DRB
APPROVED
6/7/2016 12:00:00
AM