HomeMy WebLinkAboutaction_form_drb_07-21-2016_5790e3324eb73-0.pdfACTION FORM
Design Rev iew Board (DRB)
Department of Community Dev elopment
75 South Frontage Road W est
Vail, CO 81657
Tel: 970-479-2139
www.v ailgov .com
Project Name:Red Lion Building 2016 Application Number:DRB16-0265
Application Type:Change to Approved Date Applied:07/12/2016
Project Description:Resubmittal of approved DRB drawing set with unit 2 removed from the scope.
Renovation and addition to residential unit R-3 at the Red Lions condominiums.
CONTACTS
Contact Type:Applicant
Full Name:Vag, Inc. Architects & Planners
Address:PO BOX 1734 VAIL, CO 81658-1734 Phone:970-949-7034
Contact Type:Property Owner
Full Name:BLUE MOUNTAIN INVESTMENTS LLC
Address:4720 BOW MAR DR R-3 BOW MAR, CO 80123-1445 Phone:None
Project Address:304 BRIDGE ST R3 (210108253009)
Job Site Location:R3
Legal Description:Subdiv ision:VAIL VILLAGE FILING 1 Lot:E - H Block:5A
Parcel Number:210108253009
BOARDS/STAFF ACTION
Motion By:Kjesbo Action:Approved
Second By:Cahill
Vote:3-0-1 Date of Approv al:07/20/2016
Conditions:
All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to
the Vail Town Code, Chapter 12-3-3 Appeals.
No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
A new surface material shall be installed around the exhaust flue enclosure on the north elevation so that the
exterior surface can retain a cleaner appearance.
The applicant shall pay the required inclusionary zoning fee in lieu prior to obtaining a building permit.
Planner: Brian Garner