Loading...
HomeMy WebLinkAboutDRB16-0265_A2.1_1478898622.pdfREMOVE (E) WATER HEATER, BOILER AND MECHANICAL EQUIPMENT AND SALVAGE TO EVALUATE FOR USE IN (N) WORK REMOVE (E) STRUCTURAL STUD PACK COLUMN AS REQUIRED FOR (N) WORK. PROVIDE SHORING PER STRUCTURAL REMOVE (E)WALLS AS REQUIRED FOR NEW WORK. PROVIDE SHORING PER STRUCURAL REMOVE (E)WALLS AS REQUIRED FOR NEW WORK. PROVIDE SHORING PER STRUCURAL (E) FIXTURES IN BATHS ON THIS LEVEL HAVE ALREADY BEEN REMOVED VIA INSURANCE CLAIM PROCEDURES. REMOVE (E) SUPLLY AND DRAIN LINES AS REQUIRED FOR (N) WORK. REMOVE ALL (E) WINDOWS SHOWN ON SEPARATE DRAWINGS. CREATE NEW OPENINGS FOR (N)DOORS AND WINDOWS SCHEDULED IN (E) WALLS TO REMAIN AND PROVIDE NEW HEADERS PER STRUCTURAL, TYPICAL BOTH LEVELS. C A B 4 4 3 3 2 2 1 1 24' - 2" 13' - 0 1/2" 9' - 6 1/2" 18' - 9" 19' - 9" REMOVE (E) FIREPLACE AND STONE SURROUND REMOVE (E) FLOOR STRUCTURE FOR (N) WORK REMOVE (E) STAIRS C A B 4 4 3 3 2 2 1 1 (E) STRUCTURAL COLUMNS TO REMAIN. FIELD VERIFY WITH STRUCTURAL ENGINEER FOR USE IN NEW DESIGN (E) KITCHEN: CABINETS AND FIXTURES HAVE BEEN REMOVED 18' - 9" 19' - 9" (E) WALL TO BE DEMOLISHED (E) WALL TO REMAIN (E) BUILT-IN TO BE DEMOLISHED mosaic architects architecture, planning, green consulting interior design www.mosaicarchitects.com info@mosaicarchitects.com Issues / Revisions: E-Transmissions: Drawing Title: Date: Project No: Drawn by: Checked by: C 2016 mosaic architects Sheet: PO Box 4333 Edwards, CO 81632 p: 303.247.1100 m: 970.470.2291 Vail Office All drawings and written material appearing herein constitute the original and unpublished works of Mosaic Architects. It may not be duplicated, used or disclosed without written permission of Mosaic Architects. All rights reserved. not for construction 1290 Sutter Street #400 San Francisco, CA 94109 p: 415.409.6660 f: 415.449.6624 Boulder Office 1379 WESTHAVEN CIRCLE - SOUTH VAIL, CO 81657 WESTHAVEN - VAIL DEMOLITION PLANS 05 JUL 2016 1418 A2.1 SILVER RESIDENCE 1/4" = 1'-0" 1 Lower Level - Demolition 1/4" = 1'-0" 2 Main Level - Demolition DEMOLITION WALL LEGEND: 12 APR 2016 Schematic Pricing 11 JUL 2016 CONCEPT DRB SUBMITTAL DRB APPROVED 7/20/2016 12:00:00 AM