Loading...
HomeMy WebLinkAboutDRB16-0265_A5.2D_1478898674.pdfSOUTH UNIT NORTH UNIT (No Work) mosaic architects architecture, planning, green consulting interior design www.mosaicarchitects.com info@mosaicarchitects.com Issues / Revisions: E-Transmissions: Drawing Title: Date: Project No: Drawn by: Checked by: C 2016 mosaic architects Sheet: PO Box 4333 Edwards, CO 81632 p: 303.247.1100 m: 970.470.2291 Vail Office All drawings and written material appearing herein constitute the original and unpublished works of Mosaic Architects. It may not be duplicated, used or disclosed without written permission of Mosaic Architects. All rights reserved. not for construction 1290 Sutter Street #400 San Francisco, CA 94109 p: 415.409.6660 f: 415.449.6624 Boulder Office 1379 WESTHAVEN CIRCLE - SOUTH VAIL, CO 81657 WESTHAVEN - VAIL EAST ELEVATIONS 05 JUL 2016 1418 Author Checker A5.2D SILVER RESIDENCE 1/4" = 1'-0" 1 PROPOSED EAST ELEVATION 12 APR 2016 Schematic Pricing 11 JUL 2016 CONCEPT DRB SUBMITTAL 1/4" = 1'-0" 2 EXISTING EAST ELEVATION DRB APPROVED 7/20/2016 12:00:00 AM