Loading...
HomeMy WebLinkAboutERWSD Signed UAV and Letter.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan,floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: c210 3 (o 'o-vo 14'6-1\ Lot 2 Block C. Subdivision:CA-; Primary Contac ywper Representative: ,�r.�y t ta cc-L .�.,. Phone: 0%'7 t a '" ?c5 ''s [9 �/ Plans Dated: re-lo % z"I L, Primary Contpct/bwner Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClernon kelly.mcclernon@centurylink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker remington.c.baker@xcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom jvroom@holycross.com XCEL Energy 970.262.4032(tel) 970.262.4038(fax) Contacts: Britt Mace brittany.mace@xcelenergy.com EAGLE RIVER WATER&SANITATION ` DISTRICT (, IQO t t.. C f ccliect 970.477.5449(tel) '? t �� '` ; ?,b 970.845.7218(fax) /: • Contact:Tug Birk tbirk@erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michaeljohnson@cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin I. Daniel.roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date. EAGLE RIVER WATER & SANITATION DISTRICT July 28, 2016 Randy Fischer Division 6 Construction 2695 Davos Trail Vail, CO 81657 Dear Mr. Fischer, Eagle River Water and Sanitation District(District) is signing off on your recently submitted plans for the remodel at 2636 Davos Trial. Both the Davos Trail ASE plans dated 7/15/16 and sheet A8.1 dated 7/12/16 are approved for construction. Please note that no encroachments will be allowed within the 4ft buffer between the outside edge of the parking structure and the Southwestern property line, including, but not limited to structures, retaining walls, and landscaping. Call Mindi McClintock at 970-477-5473 for locates prior to starting construction. If during excavation you encounter the 8 inch sewer main, please contact the District immediately. Sincerely, ctraS Tug Birk Development Review Coordinator Clean Water. Quality Life."' 846 Forest Road Vail, Colorado 81657 Tel (970) 476-7480 Fax (970) 476-4089 erwscl.org