Loading...
HomeMy WebLinkAboutaction_form_drb_05-25-2016_5745d74f712b2-0.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Turri Addition 2016 Application Number: DRB16-0132 Application Type: Addition Date Applied: 04/25/2016 Project Description: Addition to east duplex at kitchen (east side). Install new garage door. CONTACTS Contact Type: Applicant Full Name: Lksm Design (Leah Mayer) Address: Po Box 9195 Avon, CO 81620 Phone: 970-376-6623 Contact Type: Property Owner Full Name: TURRI, RAYMOND A. & HEATHER R. Address: 33 W HYERDALE DR GOSHEN, CT 06756-1802 Phone: None Contact Type: Other Full Name: Lksm Design (Leah Mayer) Address: Po Box 9195 Avon, CO 81620 Phone: 970-376-6623 Project Address: 1824 GLACIER CTA (210312204034) Job Site Location: A Legal Description: Subdivision: LION'S RIDGE SUBDIVISION Lot: 20 Block: 2 FILING 3 Parcel Number: 210312204034 BOARDS/STAFF ACTION Motion By: Kjesbo Action: Approved Second By: Forstl Vote: 5-0 Date of Approval: 05/18/2016 Conditions: Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). The applicant shall revise Sheet A3.1, dated April 22, 2016, to indicate that all new materials and finishes shall match existing materials and finishes. The applicant shall revise Sheets A2.1 and A3.1, dated April 22, 2016, to indicate that the mullion of the proposed kitchen window will align with the mullion of the second floor window above it. The applicant shall revise Sheet A2.1 and the east elevation on Sheet A3.1 , dated April 22, 2016, to indicate the proposed window nearest to the new entry will be a vertically oriented window to align with the right edge of the window directly above it on the second floor. The applicant shall revise the east and north elevations on Sheet A3.1, dated April 22, 2016, to align to the height of the stucco, siding, and trim board with the existing stucco, siding, and trim board. The garage doors on the west elevation of the duplex depicted on Sheet A3.1 , dated April 22, 2016, shall be revised to indicate that each garage door shall match, or alternatively, the applicant shall remove new garage door from the request. Planner: Matt Panfil