HomeMy WebLinkAboutaction_form_drb_05-12-2016_5734b4d3e3cbc-0.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Holm Single Family Residence Application Number: DRB16-0163
2015
Application Type: Change to Approved Date Applied: 05/11/2016
Project Description: Change to windows 2/A3.1 at kitchen north wall
CONTACTS
Contact Type: Applicant
Full Name: Krueger Architecture (Pavan Krueger)
Address: PO Box 8332 Avon, CO 81620 Phone: 970-390-0968
Contact Type: Property Owner
Full Name: HOLM, CLAES - BYERS-HOLM, AMY
Address: 352 BEAVER DAM CIR APT A VAIL, CO 81657-5240 Phone: None
Project Address: 738 SANDY LN (210106315002)
Job Site Location:
Legal Description: Subdivision: VAIL POTATO PATCH FILING 2 Lot: 5 Block:
Parcel Number: 210106315002
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date of Approval: 05/12/2016
Conditions:
All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to
the Vail Town Code, Chapter 12-3-3 Appeals.
The applicant for this project is required to submit a foundation Improvement Location Certificate (ILC)
showing the foundation of the structure in compliance with the approved development plan in conjunction with
the building permit inspection process.
Prior to the issuance of a final certificate of occupancy, the applicant shall have completed all site and
landscaping improvements as shown on the approved Design Review Board.
Applicant shall submit revised plans to the Building Department for review and approval, prior to construction
of this portion of the home.
Planner: Chris Neubecker