HomeMy WebLinkAboutDRB16-0187_A1.2_1478904251.pdf 014 OF 1'4
A A Existing perimeter beam sx
�
tr:AII
Set Set wood roof framing - to rem
\— Roof Level New built-up wood shoring fd•'wv•, b -0
with existing glulam beam 4,t' 2
is?'R9
below. Remove, modify, and reinstall
Iy existing guardrail to allow for shoring
post
I , 1 I NC; '74:4N4*'. . —.Ali . _
ill' iy� T
--- qui I Existing glulam beam supporting
*411:- �i 41111 l I walkway wood framing - to remain
L4111
kllIllgillIll ie■
4th Floor Level
New built-up wood shoring post aligned
with existing glulam beam above and
,, below. Remove, modify, and reinstall
- existing guardrail to allow for shoring
' _ — post
Iii 111111111/ i Existing glulam beam supporting
- - --- -- - walkway wood framing - to remain
11.
New built-up wood shoring post aligned
with existing glulam beam above
s--
Existing reinforced concrete podium
slab - to remain
2nd Floor Level
Notes:
1 . Refer to Sheet 3 for notes.
Project
BC&BC ,Q, E LL( The Montaneros Condominium Association Date No. 16-17
l.lX Date 4-15-16
Temporary Shoring Scale NONE
1520 West Canal Court,Suite 240
Sheet Title
Sheet No.
Littleton,Colorado 80120
Elevation 3 - Looking South and East
303.350.1000 tel 1 303.350.1004 fax