HomeMy WebLinkAboutDRB16-0187_A1.3_1478904252.pdf itie- ill it
il\ XA1;14' 1w1
Sheet ' IcIc7 VIIJ
6 Existing perimeter beam su'l oo
tl wood roof framing - to rem4 016 12:00:00
ROo v-et` _____ ___400(
__ r: New built-up wood shoring post aligned
1 with existing glulam beam above and
below. Remove, modify, and reinstall
existing guardrail to allow for shoring
_�^`1iLI !.7 �; �, post
J:_._
�� = : .., Existing glulam beam supporting
walkway wood framing - to remain
�
',jar
_ New built-up wood shoring post aligned
If_
ric
,iilil 1 with existing glulam beam above and
1$'i - - --67; 11,-- below. Remove, modify, and reinstall
3rd Floor 1,c : - - . ---
existing guardrail to allow for shoring
post
II== � !
2nd ` ?i!�'
fir ._ Existing glulam beam supporting
,,{� . .__ walkway wood framing - to remain
No '. ----\:! _ New built-up wood shoring post aligned
with existing glulam beam above
Existing reinforced concrete podium
slab - to remain
Notes:
1 . The existing columns, beams, and wood framing is to remain in-place.
2. The new shore posts are to fit snug-tight between the floors and shall be
mechanically secured top and bottom in alignment with each other and the
perimeter beam.
3. Refer to Sheet 1 for additional notes and requirements.
Project
B C ,Q�x, E The Montaneros Condominium Association ate 4-15
DNo. 16-17
Date -16
Temporary Shoring Scale NONE
1520 West Canal Court,Suite 240
Sheet Title
Sheet No.
Littleton,Colorado 80120
Elevation 1 - Looking East 3
303.350.1000 tel 1 303.350.1004 fax