Loading...
HomeMy WebLinkAboutDRB16-0339_Traffic Impact Study_1471292100.pdf Transportation Impact Study    for    Vail Marriott Residence Inn Redevelopment        August 5, 2016      PREPARED FOR:  The Harp Group  601 Oakmont Lane, Suite 420  Westmont, IL  60559  Contact: Peter Dumon, President      PREPARED BY:  McDowell Engineering, LLC  936 Chambers Court, B4  PO Box 4259  Eagle, CO 81631   970.623.078  Contact: Kari J. McDowell Schroeder, PE, PTOE  Project Number: M1234          M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     2           Statement of Engineering Qualifications    Kari J. McDowell Schroeder, PE, PTOE is a Transportation and Traffic Engineer for McDowell  Engineering, LLC.  Ms. McDowell Schroeder has over nineteen years of extensive traffic and  transportation engineering experience.  She has completed numerous transportation studies and  roadway design projects throughout the State of Colorado.  Ms. McDowell Schroeder is a licensed  Professional Engineer in the State of Colorado and has her certification as a Professional Traffic  Operations Engineer from the Institute of Transportation Engineers.              M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     3 Transportation Impact Study for Vail Marriott Residence Inn Redevelopment    Table of Contents  1.0 PROJECT DESCRIPTION ............................................................................................................................ 4  1.1 PREVIOUS TRAFFIC ANALYSIS ................................................................................................................................ 5  2.0 EXISTING CONDITIONS ............................................................................................................................ 7  2.1 DESCRIPTION OF EXISTING TRANSPORTATION SYSTEM ................................................................................................ 7  3.0 FUTURE TRAFFIC PROJECTIONS .............................................................................................................. 10  3.1 CAPITAL IMPROVEMENT PROJECTS ....................................................................................................................... 10  3.2 BACKGROUND TRAFFIC GROWTH ......................................................................................................................... 10  4.0 PROJECT TRAFFIC ................................................................................................................................... 12  4.1 TRIP GENERATION ............................................................................................................................................. 12  4.2 TRIP DISTRIBUTION ........................................................................................................................................... 14  4.3 SITE CIRCULATION ............................................................................................................................................. 14  4.4 TRIP MODE SPLIT AND ASSIGNMENT .................................................................................................................... 15  5.0 TRANSPORTATION IMPACT ANALYSIS .................................................................................................... 19  5.1 SITE ACCESS AUXILIARY TURN LANES .................................................................................................................... 19  5.2 LEVEL OF SERVICE ANALYSIS ................................................................................................................................ 21  5.3 ENTERING SIGHT DISTANCE ................................................................................................................................ 22  5.4 ACCESS PERMITTING ......................................................................................................................................... 23  5.5 MULTIMODAL PEDESTRIAN AND BICYCLE FACILITIES ................................................................................................ 23  6.0 RECOMMENDATIONS AND CONCLUSIONS .............................................................................................. 2 4   7.0 APPENDIX .............................................................................................................................................. 25     Tables and Figures  FIGURE 1: AREA MAP ......................................................................................................................................... 4  FIGURE 2: CONCEPTUAL SITE PLAN ..................................................................................................................... 6  FIGURE 3: YEAR 2018 BACKGROUND TRAFFIC VOLUMES ..................................................................................... 9  FIGURE 4: YEAR 2040 BACKGROUND TRAFFIC VOLUMES .................................................................................... 11  TABLE 1: TRIP GENERATION............................................................................................................................... 13  FIGURE 6: ASSIGNED PROJECT GENERATED TRAFFIC .......................................................................................... 16  FIGURE 7: YEAR 2018 TOTAL TRAFFIC VOLUMES ................................................................................................ 17  FIGURE 8: YEAR 2040 TOTAL TRAFFIC VOLUMES ................................................................................................ 18  TABLE 2: AUXILIARY TURN LANE REQUIREMENTS: ............................................................................................. 20  TABLE 4: TOTAL TRAFFIC LEVEL OF SERVICE ....................................................................................................... 21      M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     4 1.0  Project Description  The Vail Marriott Residence Inn, a proposed 1.9 acre redevelopment, is located near  the intersection of the Interstate 70 North Frontage Road and Buffehr Creek Road  within the Town of Vail. The proposed project will replace the former Roost Lodge  that was located on the property.  The  southern  boundary  of  the  property  abuts  the  Frontage  Road  and  starts  approximately 250 feet north east of the Buffehr Creek Road intersection with the  Frontage Road. The property is also bordered on the north by Meadow Ridge Road,  but  is  does  not  and  is  not  anticipated  to  take  access  from  it  due  to  the  grade  differential. The location of this property in relation to the surrounding area can be  seen in Figure 1.  This site was previously approved for redevelopment.  Figure 1: Area Map      SITE  M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     5 The proposed redevelopment is expected to include a Marriott Residence Inn, it’s  associated support facilities and deed restricted, local employee, long‐term rental  units.   Specifically, the Vail Marriott Residence Inn project is currently anticipated to consist  of:   170 Hotel Rooms    Lobby, Library, Lounge and Associated Guest Facilities   113 Long‐Term Rental Local Employee Housing Units  A concept plan of the proposed development can be seen in Figure 2.  The site was formerly occupied by the Roost Lodge, which included a 72‐room hotel  and 1 employee housing unit.  The Roost Lodge was demolished in 2014 and the site  is now vacant.  The Vail Marriott Residence Inn redevelopment has an assumed build out completion  year of 2018. Analysis has been performed for existing conditions, background and  total conditions for short‐term Year 2018 as well as for the long‐range planning Year  2040.  1.1 Previous Traffic Analysis  This site has been previously proposed for redevelopment that was not constructed.   In 2013, The Vail Marriott Residence Inn was planned to include 176 Hotel Suite  Rooms and 2 Employee Housing Units.  This development was studied in McDowell  Engineering’s Transportation Impact Study for Marriott Residence Inn Redevelopment  dated May 21, 2013.  This study was previously approved by CDOT and the Town of  Vail.          Figure 2 M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     7 2.0 Existing Conditions  2.1 Description of Existing Transportation System  Interstate 70 North Frontage Road:  The I‐70 North Frontage Road provides  the primary local connection along the  north side of Interstate 70 between the  West Vail and Vail Village Interchanges.  In the vicinity of the project site, this  two‐lane facility is classified as Access  Category F‐R, Frontage Road by the  Colorado  Department  of  Transportation  (CDOT)  and  has  a  posted speed limit of 35 mph. There  are no existing auxiliary turn lanes at  the two accesses to the property.   CDOT and the Town of Vail completed an Access Management Plan Map for this  roadway as part of their Vail Transportation Master Plan Update in 2009.    Buffehr Creek Road:   Buffehr Creek Road is a local two‐lane roadway providing access  to Chamonix Lane and residential development north of the development property.  Buffehr Creek Intersects the North Frontage Road 250 feet to the southwest of the  development property. The posted speed limit on this roadway is 25 mph.   Meadow Ridge Road:  Meadow Ridge Road is a short, cul‐de‐sac roadway that forms  the northwest boundary of the proposed redevelopment. The subject property does  not take access from Meadow Ridge Road, nor is it expected to do so in the future  due to the grade differential between the property and the road.   Pedestrian, Transit and Bicycle Facilities:    The  sole  existing  bicycle/  pedestrian  facility  in  the  vicinity  of  the  Vail  Marriott Residence Inn redevelopment  is  the  North  Recreation  Path,  which  connects the Vail Village and West Vail  Interchanges  along  the  north  side  of  the North Frontage Road. The path is  contiguous across the frontage of the  site and consists of a widened asphalt  shoulder.  A concrete path with curb  and  gutter  exists  to  the  east  of  the  project site and west of Buffehr Creek  Road.      M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     8 Both the Red and Green West Vail bus  routes travel along the North Frontage  Road adjacent to the redevelopment  site.  There  is  a  bus  stop  for  the  westbound  routes  at  the  southwest  corner of the property.               Year 2018 Background Traffic Volumes:  Year  2018  traffic  conditions are based on  2013 traffic counts provided by the Town taken at the intersection of the North  Frontage Road and Buffehr Creek Road.  These 2013 counts were compared to the  from Figure 15: Year 2025 Peak Hour Projections of the Vail Transportation Master  Plan Update, 2009 at the intersection of the North Frontage Road with Buffehr Creek  Road  (Intersection  Number  22).  Refer  to  the Appendix  for  this  data  and  correspondence with CDOT and the Town of Vail.    The assumed Year 2018 Background Volumes were derived from a linear interpolation  between Years 2013 and 2025 as the starting and finishing years, respectively. Per  Town  staff,  there  are  no  other  development  projects  that  should  impact  these  volumes. Background evening volume projections for Year 2018 can be seen in Figure  3.     N Project Number: M1234 Prepared by: BBG Marriott Residence Inn RedevelopmentVail, Colorado Figure 3: Year 2018 Background Traffic August 5, 2013 LEGEND :  PM Volumes = XX Turning Movements(NTS) SITE 1 2 1 496 600 2 496 600 M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     10 3.0 Future Traffic Projections  3.1 Capital Improvement Projects  Per the Vail Transportation Master Plan Update, 2009 (Master Plan Update), the  North Frontage Road is anticipated to remain a two‐lane facility through the long term  planning horizon. However, the Master Plan Update anticipates the construction of  an eastbound left turn deceleration lane to Buffehr Creek Road prior to Year 2035.   The Town of Vail and CDOT have begun construction on the Simba Run Underpass of  I‐70 as anticipated by the Master Plan Update.  The project is anticipated to be  completed by December 2017.  This underpass, is located to the west of the Lionshead  Village and will provide an additional connection between the parts of Vail north of I‐ 70 and those south of the interstate. Per the Master Plan Update, the likely result of  this underpass on project‐generated traffic would be to increase the portion of traffic  headed to or from the east on the North Frontage Road.   3.2 Background Traffic Growth  Long‐term background growth along the North Frontage Road is based on the Year  2025 volume projections provided in the Master Plan Update. Correspondence with  Town staff regarding the anticipated growth rates can be found in the Appendix.  Per  Town staff,  …these projections represent a build out scenario study with 2025 selected  as full build out.  This was done during the boom in Vail and a lot of large  developments were on the table going thru the process.  Many of those have  been stopped or delayed.  We suggest using the 2025 data with a modest  growth rate of 0.5% from 2025 to 2035.  This methodology was used for Year 2040 conditions. The resulting projected Year  2040  background  traffic  volumes  with  the  addition  of  the  Simba Run  underpass  volumes can be seen in Figure 4.       N Project Number: M1234 Prepared by: BBG Marriott Residence Inn RedevelopmentVail, Colorado Figure 4: Year 2040 Background Traffic August 5, 2013 LEGEND :  PM Volumes = XX Turning Movements(NTS) SITE 1 2 1 857 975 2 857 975 M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     12 4.0  Project Traffic  4.1 Trip Generation  The proposed Marriott Residence Inn is anticipated to consist of:   170 Hotel Rooms (all with kitchens)  o Lobby, Library, Lounge and Associated Guest Facilities   113 Long‐Term Rental Local Employee Housing Units   10 Condos located on adjacent parcel    100 Space Parking Club (leased parking spaces)  A trip generation analysis was prepared based on ITE’s Trip Generation Manual data  for the following land uses:   #310, Hotel   #223, Mid‐Rise Apartment   #230, Residential Condo/Townhome  The Parking Club use does not fit into an established trip generation land use within  the ITE Trip Generation Manual   The proposed additional parking spaces are anticipated to generate additional vehicle  trips to and from the parking structure.  ITE publishes national parking rates and trip  generation rates for specific land uses.  These rates were used to compare the number  of parking spaces to the associated number of additional vehicle trips.  Per their 2010  Parking Generation Manual, 4th Edition7; a hotel requires 1.54 parking spaces per  hotel room.  Working backwards from the 85th percentile parking rate, the additional  100 parking spaces would adequately serve 65 hotel rooms.  ITE’s anticipated trip  generation rates (per ITE’s 2012 Trip Generation Manual, 9th Edition) for 65 rooms is  0.52 trips per room in the morning peak hour, 0.40 trips per room in the evening peak  hour, and 0.47 trips per room during the Saturday peak hour.    Because it is anticipated that these leased parking spaces would primarily be used for  skier parking the Inbound / Outbound distribution from Land Use #466, Snow Ski Area  was used for trip distribution.  The hotel land use also accounts for ancillary land uses such as the lobby, library and  lounge for guests.   Based on the Trip Generation Manual and the assumptions made, this site would be  expected to generate a total of 228 Saturday peak hour trips, 178 morning peak hour  trips, and 207 evening peak hour trips, including all modes of travel. Refer to Table 1  for trip generation calculations and further breakdown of these trips.    PROJECT NUMBER:M1234PREPARED BY: BBGDATE: 7/22/2016REVISED:Average AverageSaturday WeekdayITE CodeSAT Peak HourAM Peak HourPM Peak HourAvg. SaturdayAvg. WeekdayTrips (vpd)Trips (vpd) % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips TripsExisting Land Use#310 Hotel 72 Rooms 0.72 0.56 0.59 8.19 8.17590 58856% 29 44% 23 61% 25 39% 16 53% 23 47% 20#230 Condo/Townhome 1 DU 0.47 0.44 0.52 5.67 5.816654% 1 46% 1 17% 1 83% 1 67% 1 33% 1Proposed Land Use#310 Hotel 170 Rooms 0.72 0.56 0.59 8.19 8.171392 138956% 69 44% 54 61% 59 39% 38 53% 54 47% 48#223 Mid‐Rise Apartment 113 DU 0.44 0.35 0.44 59% 30 41% 21 29% 12 71% 29 59%30 41% 21Parking Club3100 Spaces 0.47 0.34 0.4796% 46 4% 2 95% 33 5% 296% 46 4% 2#230 Residential Condo/Townhome10DU 0.47 0.44 0.52 5.67 5.81 57 58 54% 346% 3 17% 1 83% 467% 4 33% 2Proposed Total Trips1392 1389148801057313473Resulting Additional New Trips797 79511856795611052Proposed Total Trips Less 10% Non-Automobile Mode Split1253 1250133729566121661 Values obtained from Trip Generation, 8th Edition, Institute of Transportation Engineers, 2012.2 Land Use #311 Does not provide Saturday data. Land Use #310 Hotel used for this day.3 The Parking Club Use is estimated using parking rates calculated for a Hotel. The percent inbound/outbound was used for the Ski Resort land use #466. See Section 4.1 for additional informationTable 1 - Project Trip GenerationMarriott Residence Inn RedevelopmentVail, ColoradoEstimated Project-Generated Traffic1UnitsSaturday Peak Hour Morning Peak Hour Evening Peak HourTrip Generation Rates Inbound Outbound Inbound Outbound Inbound Outbound M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     14 4.2 Trip Distribution  The  distribution  of  project‐generated  vehicular  traffic  on  adjacent  roadways  is  influenced by several factors including the following:     The location of the site relative to other commercial facilities and the roadway  network.   The configuration of the existing and proposed adjacent roadway network   Relative location of neighboring population centers    Based upon the above factors and the current completion date of December 2017 for  the Simba Run underpass, it is assumed that approximately fifty percent (50%) of site  generated traffic will travel to or from the east on the North Frontage Road and fifty  percent (50%) will travel to or from the west on the North Frontage Road under short  term conditions.    4.3 Site Circulation  The Transportation Master Plan and Access Management Plan Map provide guidance  for the access points to the subject property. These documents specify that the  easternmost access will be ingress only and the westernmost access will be egress  only.      As designed, the site is anticipated to operate most effectively with the easternmost  access as ingress only and the westernmost access as a full movement.  Because the  site will include hotel as well as long‐term rental housing it is believed that site access  would operate most efficiently with this configuration.  The easternmost access would  be used for hotel check‐in, shuttles, and deliveries.  The westernmost access would  be the primary access for the apartments, parking garage, and hotel guests after  check‐in.  The Town of Vail has indicated that they would support this change from  the Access Management Plan if the access points operate adequately as proposed.  It  is understood that CDOT would need to also support this change and that the Access  Management Plan would need to be updated to reflect the change.    Per  Section  4.4(1)  of  the State  Highway  Access  Code,  2002,  (Access  Code)  the  minimum distance between access points should be at a minimum equal to the design  sight distance along the highway. Given a 35 mph posted speed limit on the North  Frontage Road, the access points should be a minimum of 250 feet apart.       Access  to  the  adjacent  parcel  is  approximately  120‐feet  west  of  the  proposed  westernmost access to the site.  The Access Management Plan anticipates that the  adjacent access to the North Frontage Road would be closed when this parcel is  redeveloped  in  the  future  and  access  would  be  from  Meadow  Ridge Road.   Alternately, if acceptable the adjacent property owners, access to the site could be  from the westernmost access to the Vail Marriott site allowing closure of the existing  M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     15 access. If the accesses are not combined, a CDOT Design Waiver would be required  for the Access Spacing.    4.4 Trip Mode Split and Assignment   Given the available bicycle/pedestrian routes and adjacent transit stop for the local  bus system, it can be assumed that a portion of site generated trips will be made by  modes other than passenger car. The limited parking in Vail also encourages people  to use alternative modes of transportation.  An assumed multimodal reduction of ten  percent (10%) would result in the reduction of the volume automobile trips by 23 trips  during the Saturday peak hour, 17 trips during the weekday morning peak hour and  20 trips during the weekday evening peak hour.   Following the removal of non‐vehicular trips from the project generated traffic, the  anticipated  volume  of  vehicular  trips  at  each  site  access  can  be  calculated.  The  anticipated assignment of trips on the roadway system is determined by applying the  external trip generation expected for this site and its corresponding mode split to the  estimated trip distribution. The resulting projections of site generated traffic with the  Simba Run underpass can be seen in Figure 6.   The Year 2018 total traffic anticipated at each intersection in question is the sum of  the estimated Year 2018 background traffic (Figure 3) traffic with Figure 6, and can be  seen in Figure 7.   Similarly, Year 2040 total traffic is the sum of Year 2018 background traffic (Figure 3)  traffic with Figure 4, and can be seen in Figure 8.   As only evening peak hour data was available from the Master Plan Update, all  volumes in Figures 7 and 8 only represent the evening peak hour.    N Project Number: M1234 Prepared by: BBG Marriott Residence Inn RedevelopmentVail, Colorado Figure 6: Assigned Project Generated Traffic May 21, 2013 LEGEND :  SAT/AM/PM Volumes = XX/XX/XX Turning Movements(NTS) SITE 1 2 1 20/14/18 47/33/42 47/33/42 36/33/3336/33/332 36/33/33 20/14/18 20/14/18 N Project Number: M1234 Prepared by: BBG Marriott Residence Inn RedevelopmentVail, Colorado August 5, 2013 Figure 7: Year 2018 Total Traffic LEGEND :  PM Volumes = XX Turning Movements(NTS) SITE 1 2 1 514 42 42 3333600 2 529 18 18 600 N Project Number: M1234 Prepared by: BBG Marriott Residence Inn RedevelopmentVail, Colorado Figure 8: Year 2040 Total Traffic August 5, 2016 LEGEND :  PM Volumes = XX Turning Movements(NTS) SITE 1 2 1 875 42 42 3333975 2 890 18 18 975 M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     19 5.0 Transportation Impact Analysis  5.1 Site Access Auxiliary Turn Lanes  As  the  North  Frontage  Road  is  a  State  Highway  facility  of  Access  Category  F‐R,  Frontage Road (Speed Limit 35 mph), the need for auxiliary turn lanes to and from the  site should be addressed. Per Section 3.13(4)(c‐d) of the State Highway Access Code,  2002 (Access Code), as the North Frontage road has a posted speed less than 45 mph,  acceleration lanes are generally not required and were not assessed further.   At the proposed eastern and western site accesses there is the potential for two  auxiliary deceleration lanes, the eastbound left and westbound right movements.  Neither lane currently exists at either access location.   Right Turn Deceleration:  A westbound right turn deceleration lane is required on a facility of this type when  the anticipated peak hour volumes exceed 50vph. Anticipated right turn volumes  entering the eastern and western site accesses range from 14‐20vph and 33‐47vph  respectively. The volume range is given because the traffic volume is expected to vary  over the morning, evening and Saturday peak hour traffic.    The Saturday peak hour volume for the western site access is on the threshold of the  CDOT warrant but does not exceed the requirement.  The AM and PM peak hour  volumes do not CDOT’s threshold at either location.   Based on these volumes no  westbound right turn lane should be required at either site access.  Left Turn Deceleration:  An eastbound left turn deceleration lane would be required if peak hour volumes  expected to use this movement exceed 25vph. Anticipated left turn volumes entering  the  eastern  and  western  site  accesses  range  from  14‐20vph  and  33‐47vph  respectively. Peak hour volumes for the AM, PM, and Saturday are projected to  exceed  the  CDOT  threshold  and  at  the  eastbound  left  ingress  movement  at  the  western site access. A deceleration lane will be required at this location. Refer to Table  2, Auxiliary Turn Lane Requirements for a breakdown of expected conditions.              M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     20 Table 2: Auxiliary Turn Lane Requirements:  Turning  Movement  Maximum Peak Hour Turning  Volume Lane  Required? Turn Lane Length  (from Figure 6)  Eastern Site Access  Westbound Right 20 vph  No  N/A <50vph  turning  Eastbound Left 20 vph  No  N/A >25vph  turning  Western Site Access  Westbound Right 47 vph  No  N/A <50vph  turning  Eastbound Left 47 vph  Yes 47’ Storage, 10:1  Taper >25vph  turning    The Access Code also details the required auxiliary turn lane lengths. Per Section 4,  the auxiliary eastbound left lane should consist of a 10:1 taper and 46 feet of storage,  for a total distance of 166 feet.                         M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     21 5.2 Level of Service Analysis  An HCM 2010 site access analysis was performed for both short term Year 2018 and  long term Year 2040 conditions. This analysis assumes that the single deceleration  lane explored as part of Section 5.1 will be constructed. The western full‐movement  access was anticipated to have both left and right turn lanes. Table 4 summarizes the  total level of service (LOS) and delays.  Table 4: Total Traffic Level of Service              PM Level of Service        Intersection     (Seconds of Delay)     Control  Movement  2018  2040        No   EBL  A (9)  B (11)  West Site Access and  Control  EBT  A (0)  A (0)  N Frontage Road  No Control  WBR/T  A (0)  A (0)  (Full Movement)  SB Stop SB  C (23)  F (96)          SBL  D (33)  F (163)          SBR  B (14)  C (21)  East Site Access and  No Control  EBL/T  A (0)  A (0)  (Ingress Only)  No Control  WBR/T  A (0)  A (0)    As can be seen in Table  4,  the  eastern  site  access  is  anticipated  to  operate  satisfactorily following the completion of the redevelopment through the long term  planning horizon.  The western site access is anticipated to operate at an acceptable LOS through the  Year 2018.  By Year 2040 evening peak hour traffic volumes will  deteriorate  to  unacceptable levels of service for the southbound left turn movement due to high  volumes on the North Frontage Road. This condition will occur for all accesses along  the Frontage Road with or without the Vail Marriott Residence Inn project.  Delays at  stop control side street accesses with arterials is normal and expected in peak hours.     However, even under these conditions, the ninety‐five percentile queues at the access  are anticipated to remain less than three vehicles in length.              M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     22 5.3 Entering Sight Distance  As the redeveloped site is expected to be a commercial facility with minimal multi‐ unit truck trips, Per Table 4‐3 of the Access Code, the appropriate design vehicle for  entering sight distance is a single‐unit truck. Per Table 4‐2 of the Access Code, the  entering sight distance at the western access should be greater than 455 feet. From  the existing western access there appears to be in excess of 500 feet to the west of  the access and in excess of 700 feet east of the access. Entering sight distance exceeds  Access Code requirements.    Eastbound sight distance at the western site (egress) access    Westbound sight distance at the western site (egress) access          M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     23 5.4 Access Permitting  Given that estimated traffic volumes at the site are expected to increase in excess of  twenty  percent  over  the  existing  volumes  and  the  existing  accesses  will  be  reconstructed, revised State Highway Access Permits will be required for the two site  accesses.  5.5 Multimodal Pedestrian and Bicycle Facilities  The applicant shall incorporate multimodal facilities in the site design as the project  progresses  in  the  Town’s  review  and  entitlement  process.    These  plans  shall  be  coordinated for connectivity with the North Frontage Road bicycle and pedestrian  route, as well as the transit system.                                      M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     24 6.0  Recommendations and Conclusions  The Marriott Residence Inn redevelopment anticipates replacing the existing Roost  Lodge, adjacent to the Interstate 70 North Frontage Road in Vail, with a 170‐room  hotel; 113 long‐term, local employee, rental apartments; and 100 leased parking  spaces.   As  part  of  this  effort,  it  is  expected  that  the  two  existing  site  accesses  will  be  reconstructed and reconfigured.    The Transportation Master Plan and Access Management Plan Map provide guidance  for the access points to the subject property. These documents specify that the  easternmost access will be ingress only and the westernmost access will be egress  only.      As designed, the site is anticipated to operate most effectively with the easternmost  access as ingress only and the westernmost access as a full movement.  Because the  site will include hotel as well as long‐term rental housing it is believed that site access  would operate most efficiently with this configuration.  The easternmost access would  be used for hotel check‐in, shuttles, and deliveries.  The westernmost access would  be the primary access for the apartments, parking garage, and hotel guests after  check‐in.  The Town of Vail has indicated that they would support this change from  the Access Management Plan if the access points operate adequately as proposed.  It  is understood that CDOT would need to also support this change and that the Access  Management Plan would need to be updated to reflect the change.    The  proposed  access  spacing  between  the  western  site  access  and the adjacent  property  access  is  approximately  120‐feet.    The  Access  Management  Plan  Map  anticipates that the adjacent access will be closed and the property will gain access  from Meadow Ridge Road at the time of redevelopment.  Per the Access Code, A  minimum distance of 250 feet between access points is required by the Access Code  along the Frontage Road.  The  anticipated  volumes  turning  left  into  the  site  are  projected to exceed the  requirements set forth by the Access Code for the construction of an eastbound left  turn deceleration lane at the eastern site access.  This lane should have 46 feet of  storage space and a 120 foot, 10:1 transition taper.   The expected increase in vehicular demand upon the two site accesses as well as the  proposed change in access design will necessitate the need for revised State Highway  Access Permits at both site accesses.  Pedestrian/bicycle  connectivity  via  the  North  Recreation  Path, as  well  as  transit  access, should be maintained or enhanced in conformance with Town of Vail criteria.     M1234 Vail Marriott Residence Inn Redevelopment                      August 5, 2016                                                 Page     25 7.0 Appendix    Reference Documents    1. 8th Edition Trip Generation Manual. Institute of Transportation Engineers, 2008.  2. Trip Generation Handbook, An ITE Recommended Practice. Institute of Transportation  Engineers, 2001.  3. Manual of Uniform Traffic Control Devices. US Department of Transportation Federal  Highway Administration, 2009.  4. Highway Capacity Manual. Transportation Research Board, 2010.  5. Vail Transportation Master Plan Update and Access Management Map.  Felsburg Holt &  Ullevig and Town of Vail, 2009  6. State of Colorado State Highway Access Code. CDOT, Rev. 2002  7. 4th Edition Parking Generation Manual. Institute of Transportation Engineers, 2010.      Included Documents    1. TIS Assumptions ‐ Correspondence with Town of Vail and CDOT   2. Vail Transportation Master Plan Update Volume Projections  3. HCM 2010 Level of Service Calculations  i. West Site Access  ii. East Site Access    7/26/2016 McDowell Engineering Mail ­ Vail Marriott https://mail.google.com/mail/u/1/?ui=2&ik=fc4c29c517&view=pt&search=inbox&msg=15627c05cd79fcc8&siml=15627c05cd79fcc8 1/2 Ben Gerdes <ben@mcdowelleng.com> Vail Marriott  Tom Kassmel <TKassmel@vailgov.com>Tue, Jul 26, 2016 at 9:08 AM To: Ben Gerdes <ben@mcdowelleng.com> Cc: Kari McDowell Schroeder <kari@mcdowelleng.com>     Tom Kassmel  Town Engineer Public Works Department  970.479.2235 vailgov.com twitter.com/vailgov   From: Ben Gerdes [mailto:ben@mcdowelleng.com]  Sent: Thursday, July 21, 2016 1:59 PM To: Tom Kassmel Cc: Kari McDowell Schroeder Subject: Vail Marriott   Tom,   I am working on updating the traffic study for the Vail Marriott project and had a few questions for you:   1. The previous study assumed that the directional distribution with the Simba Run underpass would be 50% west / 50% east.  Does this distribution still seem reasonable or should it be adjusted? This seems to be a reasonable distribution 2. A 10% multi­modal reduction was applied previously.  The project as now proposed would include a significant amount of long­term rental housing that will be deed restricted to local employees.  Do you think 10% still applies or could the reduction be increased slightly to account for the employee housing? We would recommend maintaining the 10% reduction.  We have only used a larger reduction in the Vail and Lionshead Village areas that are on the High Frequency In Town Route. 3. A 0.5% growth rate was used to project the 2025 Master Plan traffic volumes to 2035 volumes.  Should the 0.5% 7/26/2016 McDowell Engineering Mail ­ Vail Marriott https://mail.google.com/mail/u/1/?ui=2&ik=fc4c29c517&view=pt&search=inbox&msg=15627c05cd79fcc8&siml=15627c05cd79fcc8 2/2 be used to project 2025 Master Plan volumes to 2040? Yes, though we are in the process of updating our VTMP.  The numbers we will be using come from the I­70 Underpass Traffic Study. See attached. 4. Do you have updated traffic counts for this location?  We previously used 2013 counts provided. The 2012/13 counts are the latest we have.    Thanks, Ben   Ben Gerdes, PE Traffic / Transportation Engineer Eagle    Broomfield    Grand Junction   Phone: 970.366.9502 email: ben@mcdowelleng.com www,mcdowelleng.com 13­164 Traffic Report FINAL Stamped 08.11.15.pdf  1696K 1 Kari McDowell Schroeder From:Tom Kassmel Sent:Thursday, October 11, 2012 2:45 PM To:'Kari McDowell Schroeder'; Babler, Alisa Subject:RE: Roost Lodge redevelopment in Vail (Traffic Methodology) Thanks,thatworksfortheTown.  From: Kari McDowell Schroeder [mailto:kari@mcdowelleng.com] Sent: Thursday, October 11, 2012 2:10 PM To: Tom Kassmel; Babler, Alisa Subject: RE: Roost Lodge redevelopment in Vail (Traffic Methodology)  Tom,  Alisaisoutoftheofficeuntilthe16th.Therefore,wewentaheadandincludedtwoalternativesinthetrafficreport– withandwithouttheSimbaRununderpass.HopefullythissatisfiesbothCDOTandtheTown’srequests.  Thanks!  Kari  From: Tom Kassmel [mailto:TKassmel@vailgov.com] Sent: Friday, October 05, 2012 1:15 PM To: 'Babler, Alisa'; Kari McDowell Schroeder (kari@mcdowelleng.com) Subject: RE: Roost Lodge redevelopment in Vail (Traffic Methodology)  Itmayseemcounterintuitive,butthemoreconservativeapproachwouldbetousethenumberswithSimbaRun.Simba RunactuallypushesmoretraffictothisparticularsectionofFrontageRd. 2025PeakHrPMwithSimbaattheRoost:905(WB)795(EB) 2025PeakHrPMnoSimba:555(WB)630(EB)  TheTownwouldagreewiththeconservativeapproachandaskforvolumeswithSimbaRun. Sorrytokeepbattingthisbackandforth,Ijustnowlookedasthenumbers.  From: Babler, Alisa [mailto:Alisa.Babler@DOT.STATE.CO.US] Sent: Friday, October 05, 2012 11:17 AM To: Tom Kassmel Subject: RE: Roost Lodge redevelopment in Vail (Traffic Methodology)  I’dsaywesticktonotassumingSimbaRunisfundedforthestudy.It’sthemoreconservativeapproach.  Otherwise,Idon’thaveanyothercomments.  AlisaBabler PermitUnitEngineer  Pleasenote,effectiveOctober8,2012,Iwillhaveanewemailaddress: alisa.babler@state.co.us  2 CDOT,Region3Traffic&SafetySection 970Ͳ683Ͳ6287 970Ͳ683Ͳ6290(fax) Alisa.babler@dot.state.co.us     From: Tom Kassmel [mailto:TKassmel@vailgov.com] Sent: Thursday, October 04, 2012 10:47 AM To: Babler, Alisa Subject: FW: Roost Lodge redevelopment in Vail (Traffic Methodology)    From: Tom Kassmel Sent: Thursday, October 04, 2012 10:44 AM To: 'Babler, Alisa'; Kari McDowell Schroeder; alisa.babler@state.co.us Cc: Blender, Emmalee Subject: RE: Roost Lodge redevelopment in Vail (Traffic Methodology)  Fewcommentsbelowinred.  From: Babler, Alisa [mailto:Alisa.Babler@DOT.STATE.CO.US] Sent: Thursday, October 04, 2012 8:30 AM To: Kari McDowell Schroeder; alisa.babler@state.co.us Cc: Tom Kassmel; Blender, Emmalee Subject: RE: Roost Lodge redevelopment in Vail (Traffic Methodology)  Kari,  I’mgoodwiththisapproach.IwouldnotincludeSimbaRuninthestudy.Idon’tthinkitisfunded,inwhichcaseit shouldn’tbeincludedinthestudy.  Thanks Alisa     AlisaBabler PermitUnitEngineer  Pleasenote,effectiveOctober8,2012,Iwillhaveanewemailaddress: alisa.babler@state.co.us  CDOT,Region3Traffic&SafetySection 970Ͳ683Ͳ6287 970Ͳ683Ͳ6290(fax) Alisa.babler@dot.state.co.us   3   From: Kari McDowell Schroeder [mailto:kari@mcdowelleng.com] Sent: Wednesday, October 03, 2012 1:26 PM To:alisa.babler@state.co.us; Babler, Alisa Cc: Tom Kassmel Subject: Roost Lodge redevelopment in Vail (Traffic Methodology)  Alisa,  TheRoostLodgeislookingtoredevelopinVail.Thesitecurrentlyhasa72Ͳroomhotelwithoneemployeehousingunit. Thesiteistoremaingenerallythesame,butberemodeledtoanMarriottResidenceInnwith152allͲsuitehotelrooms andfouronͲsiteemployeehousingapartments.Thisyieldsalmost1,000vpdand80+/Ͳvph.Thesevolumeswillrequire aCDOTLevel2TrafficStudyontheIͲ70FrontageRoad.Idonothaveaproposedsiteplantosharewithyouyet.  Thesitewaspreviouslystudiedin2006byFoxHiggins.PerconversationswithDanRoussin,Ibelievethatanaccess permitwasissued.Theprojectwasnotconstructed.  Iamproposingthefollowingmethodologyforthisanalysis:  Trafficcountsandprojections:  x Vail’s2009AccessManagementPlan(AMP)andTransportationMasterPlan(TMP)havetrafficvolumesfor thefrontageroadandprojectionstoYear2025.Iwouldliketousethesevolumesforthestudy,astheprojectͲ generatedtrafficisgoingtodeterminetheneedforauxiliarylaneimprovements,notthethroughtrafficonthe frontageroad. x TheTownofVailisgoingtobeobtainingnewtrafficcountsinJanuary2013.Wewouldproposetodoa quickcomparisonofthefrontageroadtrafficvolumesatthattimetodetermineiftherehavebeenmajor impactstothetransportationsystem. x ThetrafficgrowthrateforthefrontageroadisnotavailableonCDOT’swebsite.Iwouldproposethatwe usethegrowthratefromtheTMPandapplyitforwardtoYear2035.Thegrowthratefrom2009to2025isvery highsincethestudywasdevelopedasabuildoutscenariostudywith2025selectedasfullbuildout.Thiswas doneduringtheboominVailandalotoflargedevelopmentswereonthetablegoingthrutheprocess.Manyof thosehavebeenstoppedordelayed.Wesuggestusingthe2025datawithamodestgrowthrateof0.5%from 2025to2035.Oncewehaveupdatedtrafficnumbersoverthiswinterwecanreassesstheprojectionas needed.  Backgroundinfrastructureimprovementsandfuturedevelopment:  x TheTownofVailhasidentifiedtheSimbaRununderpassasafuture$20Millioninfrastructureproject. Their2011CIPclassifiesthisprojectasalowpriority.Iwouldliketoknowifweshouldincludethisconnection underIͲ70inourlongtermanalysis.Tom–Doyouhaveinputonthisissue?SimbaRunismovingforward (slowly),CDOTandtheTownareabouttoreleaseajointRFPforaPELwithinthenextcouplemonthsfor completionnextyear. x TherearenoknowdevelopmentsthataregoingtoimpacttheRoostLodgesite.  Tripgeneration:  x WeareproposingtouseITELandUseCode#311–AllSuitesHotelfortheweekday/am/pmanalysis.This landusedoesnothaveSaturdaydata.Therefore,weareproposingtouse#310–Hotelfortheweekend analysis.Inaddition,thefouremployeeunitswouldbeanalyzedas#220–Apartments.Canyouconfirmwhat HotelandEHUrateswereusedintheapprovedFoxHigginsstudy,weshouldbeconsistentwiththose. 4  Tripdistribution:  x Thepreviousstudyidentifiedapproximately60%oftrafficfromthewestand40%oftrafficfromtheeast. Wewouldproposetousethesametripdistributionforouranalysis. x TheAMPidentifiesthatthesite’seasternaccessisaoneͲwayinandthewesternaccessisaoneͲwayout. Seeattached. x Weareanticipatingthatthesitetrafficwilltriggertheneedforaneastboundleftdecelerationlaneatthe easternsiteaccess.  Pleaseconfirmthatthisapproachlooksacceptable.Iwouldappreciateanyfeedbackbeforewestarttheanalysis.  Thanks!  Kari  Kari J. McDowell Schroeder, PE, PTOE Transportation / Traffic Engineer Eagle z Broomfield z Grand Junction 970.623.0788 z303.949.4748 z303.845.9541 fax  kari@mcdowelleng.com www.mcdowelleng.com  ÞPlease consider the environment before printing this email.  Figure 2Existing Peak Season TrafficFELSBURGHOLT &ULLEVIGVail Transportation Service 05-168 12/4/08Safew a y City M ar k e t Buffe hr C r e e k Rd.Lionsridge LoopRe d Sand s t o n e Rd .Matterhorn Cir.NorthMATCHL I N E MATCH L I N E LEGENDW.LionsheadCircle W.Forest R d . Westh a v e n D r.W. Gore Crk. Dr.Cham o ni x D r .South Frontage Rd.70FordVail Valley W.ParkingVillage Center Rd.Vail Rd.LionsheadParkingE. LionsheadCircleW.LionsheadCircle E.Vail Valley E.South Frontage Rd.7012356789101112131414131211108765443120175351510012530✽75 20✽ 25 275521025751518575160250420656505035026040010011005060070757047525325100301101557515103951015✽15 25 5 5 190 [20]750 [340]270 [230]50 [50]200 [175]130 [130]90 [800]40 [5][✽] 15[✽] ✽[210] 150[35] 95[90] 120[20] 50[25] 235[270] 400[80] 130[90] 10[75] 150[30] 55[35] 609✽ [✽]75 [50]5 [5]225 [795]5 [✽]✽ [✽]5 [10][✽] ✽[295] 240[20] 40[225] 550[200] 400[✽] 535085405651653554259037080100954359028070160 65 225 [15]21 [37]5 [2]3 [1]9 [23]29 [14]38 [18]367 [201]488 [214][0] 3[6] 21[4] 49[10] 41689 [474]27 [9]9 [2]393 [69]25 [6]626 [322]33 [46]5 [11][21] 123 [244] 2 53 [1] 10 [6] 1 86 [226] 383[5] 0[472] 193[0] 1[1] 3[1] 101[13] 8[62] 54[4] 29 [7]4 [4]8 [5]2 [3]21561540375505545 15[2] 14 [31] 9 [2] 37 [0] 019182021222324 171665010470361430 1759067400792966 1614700105725181348885551455801948 15720500 65470203155444056544521379631340603802218 443532530 3302332 368237549300242859 = PM Peak Hour Traffic Volumes= AM Peak Hour Traffic Volumes(at Interchanges)= Count Locations= Less Than 5 Vehicles per HourXXXXX[XXX]✽4802856008151260700360330600410690510925950 Vail Transportation Service 05-168 2/16/09Safew a y City M ar k e t Buffe hr C r e e k R d.Lionsridge LoopRe d Sand s t o n e Rd .Matterhorn Cir.Figure 72025 Peak Hour Traffic ProjectionsNorthFELSBURGHOLT &ULLEVIGMATCHL I N E MATCH L I N E LEGEND= PM Peak Hour Traffic Volumes= Intersection Number= Less Than 5 Vehicles per HourXXXXXW.LionsheadCircle W.Forest R d . Westh a v e n D r.W. Gore Crk. Dr.Cham o ni x D r .South Frontage Rd.70FordVail Valley W.ParkingVillage Center Rd.Vail Rd.LionsheadParkingE. LionsheadCircleW.LionsheadCircle E.Vail Valley E.South Frontage Rd.70123567891011121313121110876544313755300901401533580305315480709105557037054010515405595510090707303557014540130160720201855401520✽20 160 5 170 3159654256542518523013015526513529022539555015015205100759517555605✽5✽4154590052056502506601102055057701006559511010569519051580210 70 37065551060454907305255545930851059030945405285 390 15205 555✽395551151060510510521593045705556050 1545 70 70 ✽19182021222324171697010810351530 1790070735803570 1630102019510351825 1051257652057951995 27045695 1157302065 100705751156452170 14030525 706102220 453552030 5152335 408557550485243060 ✽6904601155132017701120555545910740102085013251370 Vail Transportation Services, 05-168, 2/17/09Figure 15Year 2025 Peak Hour Traffic Projectionswith Recommended PlanFELSBURGHOLT &ULLEVIGNorthFordVail Valley W.ParkingVillage Center Rd.Vail Rd.LionsheadParkingE. LionsheadCircleW.LionsheadCircle E.Vail Valley E.South Frontage Rd.Safew a y City M ar k e t Buffe hr C r e e k R d.Lionsridge LoopRe d Sand s t o n e Rd .Matterhorn Cir.Timb er R idge Rd.W.LionsheadCircle W.Fore st R d. Westh a v e n D r.W. Gore Crk. Dr.Cham o ni x D r .South Frontage Rd.MATCH L I N E MATCH L I N E LEGEND= PM Peak Hour Traffic Volumes= AM Estimated= Intersection Number= Less Than 5 Vehicles per HourXXXXX(X)70703755480300901401581580305315550905555703705401051540559551009070675215505345215 325 5 (5)175 (115)5 (5)555 (600)(360) 875(190) 380(5) 5705235735130210485840100750951259079516563585200 80 345 (30)65 (30)5 (5)5 (5)10 (25)60 (30)45 (20)480 (270)525 (225)(✽) 5(10) 25(5) 55(10) 45660 (520)80 (50)10 (10 )590 (110)30 (10)670 (450)40 (50)5 (15)(75) 260 (250) 1 95 (5) 15 (10) 2 05 (325) 555(10) ✽(800) 395(5) 5(5) 5(5)115(15) 10(70) 60(5) 510 (10)5 (5)10 (10)5 (5)(20) 5 0 (70) 6 5 (50) 80 (5) ✽65960108095190760450570265 22565840 83575957959074095 1105 (✽)✽ (✽)5 (10)(✽) ✽(490) 320(25) 4569045560557530 625402520 67075570854555 458607076035 3065495604402070 7251035530454851550 5107051528015 410 32567510053030050 315 (40)845 (370)435 (325)65 (65)355 (350)185 (185)215 (400)130 (50)(5) 15(5) 5(370) 260(50) 135(205) 275(75) 190(90) 350(375) 560(95) 150(120) 15(105) 205(85) 105(55) 75✽55536510801250166011105805301000850745660111010805876956789101112131312111024123&42191820211819202122151617232415171622123252625263&4 2018 Total PM.syn Vail Marriott Residence Inn McDowell Engineering Vail, CO Page 1 Intersection Intersection Delay, s/veh 0.1 Movement SEL SER NEL NET SWT SWR Vol, veh/h 0 0 18 529 600 18 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 20 575 652 20 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1276 662 672 0 - 0 Stage 1 662 - - - - - Stage 2 614 - - - - - Follow-up Headway 3.518 3.318 2.218 - - - Pot Capacity-1 Maneuver 184 462 919 - - - Stage 1 513 - - - - - Stage 2 540 - - - - - Time blocked-Platoon, % - - - Mov Capacity-1 Maneuver 178 462 919 - - - Mov Capacity-2 Maneuver 178 - - - - - Stage 1 513 - - - - - Stage 2 523 - - - - - Approach SE NE SW HCM Control Delay, s 0 0 0 Minor Lane / Major Mvmt NEL NET SELn1 SWT SWR Capacity (veh/h) 919 - 0 - - HCM Lane V/C Ratio 0.021 - + - - HCM Control Delay (s) 9.002 0 0 - - HCM Lane LOS A A A HCM 95th %tile Q(veh) 0.065 - + - - Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined HCM 2010 TWSC 2040 Total PM.syn Vail Marriott Residence Inn McDowell Engineering Vail, CO Page 1 Intersection Intersection Delay, s/veh 0.1 Movement SEL SER NEL NET SWT SWR Vol, veh/h 0 0 18 890 975 18 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 20 967 1060 20 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2077 1070 1079 0 - 0 Stage 1 1070 - - - - - Stage 2 1007 - - - - - Follow-up Headway 3.518 3.318 2.218 - - - Pot Capacity-1 Maneuver 59 269 646 - - - Stage 1 329 - - - - - Stage 2 353 - - - - - Time blocked-Platoon, % - - - Mov Capacity-1 Maneuver 55 269 646 - - - Mov Capacity-2 Maneuver 55 - - - - - Stage 1 329 - - - - - Stage 2 329 - - - - - Approach SE NE SW HCM Control Delay, s 0 0 0 Minor Lane / Major Mvmt NEL NET SELn1 SWT SWR Capacity (veh/h) 646 - 0 - - HCM Lane V/C Ratio 0.03 - + - - HCM Control Delay (s) 10.747 0 0 - - HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.094 - + - - Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined 2018 Total PM.syn Vail Marriott Residence Inn McDowell Engineering Vail, CO Page 1 Intersection Intersection Delay, s/veh 1.5 Movement SEL SER NEL NET SWT SWR Vol, veh/h 33 33 42 514 600 42 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 47 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 36 36 46 559 652 46 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1325 675 698 0 - 0 Stage 1 675 - - - - - Stage 2 650 - - - - - Follow-up Headway 3.518 3.318 2.218 - - - Pot Capacity-1 Maneuver 172 454 898 - - - Stage 1 506 - - - - - Stage 2 520 - - - - - Time blocked-Platoon, % - - - Mov Capacity-1 Maneuver 163 454 898 - - - Mov Capacity-2 Maneuver 163 - - - - - Stage 1 506 - - - - - Stage 2 493 - - - - - Approach SE NE SW HCM Control Delay, s 23 1 0 Minor Lane / Major Mvmt NEL NET SELn1 SELn2 SWT SWR Capacity (veh/h) 898 - 163 454 - - HCM Lane V/C Ratio 0.051 - 0.22 0.079 - - HCM Control Delay (s) 9.224 - 33.2 13.6 - - HCM Lane LOS A D B HCM 95th %tile Q(veh) 0.16 - 0.806 0.256 - - Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined HCM 2010 TWSC 2040 Total PM.syn Vail Marriott Residence Inn McDowell Engineering Vail, CO Page 1 Intersection Intersection Delay, s/veh 3.4 Movement SEL SER NEL NET SWT SWR Vol, veh/h 33 33 42 875 975 42 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 47 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 36 36 46 951 1060 46 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2125 1083 1105 0 - 0 Stage 1 1083 - - - - - Stage 2 1042 - - - - - Follow-up Headway 3.518 3.318 2.218 - - - Pot Capacity-1 Maneuver 55 264 632 - - - Stage 1 325 - - - - - Stage 2 340 - - - - - Time blocked-Platoon, % - - - Mov Capacity-1 Maneuver 51 264 632 - - - Mov Capacity-2 Maneuver 51 - - - - - Stage 1 325 - - - - - Stage 2 315 - - - - - Approach SE NE SW HCM Control Delay, s 97 0 0 Minor Lane / Major Mvmt NEL NET SELn1 SELn2 SWT SWR Capacity (veh/h) 632 - 51 264 - - HCM Lane V/C Ratio 0.072 - 0.703 0.136 - - HCM Control Delay (s) 11.139 - 172.5 20.8 - - HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.233 - 2.842 0.464 - - Notes ~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined