Loading...
HomeMy WebLinkAboutDRB16-0370_A4.01 BDR_1478901230.pdf i (1 °F 14 f ick-il VI le. erc rn \IN3-4444,44...........) ig100 VI DRB APPROVED 9/21/2016 12:00:00 AM 1 1 1 1 45 •$ 7 A4.09 6A4.08 © 4A4.07 © A4.06 © 7'-0" 31'-9Y2" 22'-2%' 2'-03/4" 21'-13/4" - ' 9' 1.1" 19'-4/2' . • • • • • • • I • I 1. 0 o 7t o, z L cQ . E • N • I I I [) I a U_ . E . U) N . I- •� 0 -- - - r. b __ - . U ONU LU 41 - vn7 flin . -- . la Cill)_ _ • • • -- • • Z la • ' loaliiiiiim22217 - - _ _ _ HISTORICAL GRADE LINE ___\_ . ♦♦♦♦♦♦♦V♦V2: 12 _ HEIGHT LIMIT • 1 ♦♦♦♦ �4001♦0 ♦♦♦ ♦♦ 1CI PROPOSED GRADE LINE - 104,10 ft, ' • HEIGHT LIMIT - - _ - 114,01 • 1 .0 • • ---"-. ....:. lin 0: • • cg) la 0 • .. BEDROOM STUDY \ 0 ICX • SUITE 1 BATH Z I2C 5I— • i J 1 _ ti ' 0 . it _ W0 Np • . 11 _ I •• • :1I ._ 2. • • -do s UPPER LEVEL FF A a • ,_ „..... - I' ���A��������������������������������������������� •��� �� II • EL: 8204' 0° J • �_ 0 �. a 3; �; > cc . . .: • _ O 1! V.. 0 2 1 : MASTER MASTER °p • o litCLOSET BEDROOM 10 , ON 4. 0 CC . —% Ss A W at inC >, • • N W • • o • `` ♦♦ . � MAIN LEVEL FF QF m _ = EL: 8193'-0" 1���/� �� � 113 _ M I • 1 • • _ _ . . • ill _ _ GARAGE M —— • - ------,- _ __ . — — _ _ HISTORICAL GRADE LINE la - - _ PROPOSED GRADE LINE GENERAL ASSEMBLY NOTES: - - _ _ _ LOWER LEVEL FF ROOF CEILING ASSEMBLY • : G - • ., - - _ _ EL: 8181' 6" •STANDING SEAM METAL ROOF OVER I-4,-1Z' - - _ • ROOF WATERPROOF MEMBRANE OVER ��J • • : - - -_ -- • • 3 2'RIGID INSULATION AND SHEATHING_R-18 MIN. • • • 1 •STRUCTURAL PLYWOOD SHEATHING OVER (RE:STRUCTURAL) OVER - • - - v • • 0 • 2"SPRAY FOAM INSULATION AT BOTTOM SIDE OF SHEATHING_R-12.4 MIN. • • i i • •STRUCTURAL ROOF JOISTS (RE:STRUCTURAL) LJ . II • BLOWN-IN BLANKET INSULATION AT JOIST CAVITIES R-41 MIN. (R-70 MIN.TOTAL) - • - • • 2 MIL SMART MEMBRANE VAPOR RETARDER • • • • 1x6 T&G DECKING OR DRYWALL PER REFLECTED CEILING PLANS in STEEL ROOF SUPPORTS AND ALL STEEL STRUCTURE AT EXTERIOR TO INTERIOR TRANSITION • • ENCAPSULATE AT INTERIOR SIDE WITH 1 1/2"MIN. SPRAY FOAM INSULATION TO MIN. 3'-0" S INSIDE FROM EXTERIOR FACE OF EXTERIOR WALLS el FLOOR CEILING ASSEMBLY •SEE PLANS FOR FINISH • • 1 2'GYP-CRETE WITH RADIANT HEAT LOOPS OVER •3/4'PLYWOOD DECKING (RE:STRUCTURAL)OVER • •STRUCTURAL MEMBERS (RE:STRUCTURAL) ISSUED FOR: DATE: • BLOWNIN BLANKET INSULATION AT JOIST CAVITIES_R-38 MIN. •SEE RCP'S FOR CEILING FINISH SCHEMATIC DESIGN 3.3.16 SLAB ON GRADE ASSEMBLY . PEC APPEAL 5.23.16 •SEE PLANS FOR FINISH CONCEPTUAL REVIEW 6.18.16 •STRUCTURAL CONCRETE SLAB WITH • HYDRONIC HEAT TUBING OVER ] i mil = T.O.V.DRB FINAL REVIEW 8.29.16 • 10 MIL POLYETHYLENE VAPOR DIFFUSION RETARDER OVER o FINAL REVIEW RESPONSE 9.12.16 • RIGID INSULATION_R-10 MIN. OVER • 4"GRAVEL BALLAST FRAMED EXTERIOR WALLS • 1 2'CONTINUOUS RIGID INSULATION NAILBASE R-6.6 MIN. ON •2'PLYWOOD SHEATHING ON •2X6 WOOD STUDS •2"SPRAY FOAM INSULATION AT INSIDE FACE OF SHEATHING_R-12.4 MIN. •3.5"BLOWN-IN BLANKET INSULATION_R-10 MIN. (R-29 TOTAL) O 2016 MICHAEL SUMAN ARCHITECT,LLC• C' ALL RIGHTS RESERVED. FOUNDATION WALL SCALE: 1/4"=1'-0" • DRAIN AND DRY BOARD BY MAR-FLEX_R-10 OVER • HOT-FLUID APPLIED WATERPROOFING OVER DRAWN: MDS •CONCRETE FOUNDATION WALL (RE:STRUCTURAL) •2x FURRING AND INSULATION PER PLAN ON INTERIOR_R-10 MINIMUM PROJECT#: 1506 FRAMED INTERIOR PARTITION WALLS 1 PROPOSED SITE SECTION SHEET TITLE: SITE SECTION • BLOWN-IN CELLULOSE INSULATION A4.01 SCALE: 1/4" = 1'-0" GENERAL NOTES: •SPRING HEIGHT DIMENSIONS TO TOP OF FINISH FLOOR • FOUNDATION UNDERDRAIN SYSTEM TO BE INSTALLED PER HEPWORTH-PAWLAK GEOTECHNICAL, INC.SUBSOIL STUDY REPORT • REFER TO ARCHITECTURAL SUPPLEMENTAL INFORMATION BOOK FOR ADDITIONAL A4 I 0 I CORE/SHELL INFORMATION AND SPECIFICATIONS