Loading...
HomeMy WebLinkAboutDRB16-0385_M10_1478904379.pdf r ,4...; AlionVo.i.,, MECHANICAL SPECIFICATIONS plans. Electrical contractor to provide necessary high voltage wiring, disconnects, _ and conduit unless provided with the packaged mechanical equipment. Air Intakes,Venting and Exhaust Is "' REVERSE RETURN LAYOUT 0. Contractor to coordinate and verify all voltage and phase requirements to the Mechanical Legend + b�' General 2" MIN. WIRE TIE 3'O.C. 5/8" HePEX TUBING specified motor and equipment with GC and EC. Contractor to provide venting and combustion air intake to the outdoors with Provide phase loss protection and soft start motors. manufacturer approved materials. Size, elbows and length shall be determined by CONCRETE OR SEE FIGURE 2 SPACED 9"0.C. 11701 The project consists of replacing an existing snowmelt boiler, and the existing PAVER COVER OA OUTDOOR AIR -HWS- HEATING WATER SUPPLY DRB No piping or ductwork shall be installed above electrical switchgear, electrical manufacturer installation guidelines and/or engineer. Any variation in routing and APPROVED concrete in the ramps and walks. New snowmelt tubing shall be added to the CAI COMBUSTION AIR INTAKE -HWR- HEATING WATER RETURN 9/12/2016 panels and within any elevator shaft. sizing shall be approved by the engineer of record. Any heating water boiler TOP OF TUBING 12:00:00 AM walkway in front of Charter Sports and on the upper ramp. The new Charter Sports application that utilizes manufacturer approved plastic venting, shall use at least TO BE WITHIN (E) EXISTING -CWS- CHILLED WATER SUPPLY walkway concrete shall be replaced with pavers. The existing lower ramp tubing 10' of actual length of CPVC out of the boiler. 25% OF DEPTH EX EXHAUST AIR -CWR- CHILLED WATER RETURN has failed, so it shall be replaced. These drawings are intended to provide the Equipment Identification RAD RETURN AIR DAMPER -SMS- SNOWMELT SUPPLY Contractor to use only glue and primer that is appropriate to match the material a general scope of work and materials of the project. Mechanical Contractor(MC) oa SAD SUPPLY AIR DAMPER -SMR- SNOWMELT RETURN application. provide the management, labor, All ductwork, piping and equipment shall have a professional legible identification COMPACTED equipment pment and accoutrements for a safe, Intake openings shall be located at least 10' awayfrom anyproperty line or I.' o _19 ° All SG SUPPLY GRILLE -RFS- RADIANT FLOOR SUPPLY delineatingmake, model,flow direction, and the metrics necessaryfor service, p p Y BASE GRADE functioning and complete system. Tendering of a proposal shall be confirmation RG RETURN GRILLE -RFR- RADIANT FLOOR RETURN maintenance and identification. Any painting or customization shall not inhibit contaminant, or with at least 25' of vertical separation. Intakes shall be located not ��� ���� �� ��� the contractor has made a thorough analysis of the job site, existing conditions and less than 3' below contaminant sources located within 10' of the source. TG TRANSFER GRILLE -G- GAS construction documents to deliver the described mechanical design and system. reading the label. Provide duct, pipe and valve markers as necessary. SD SUPPLY DIFFUSER ------ EXISTING PIPING It IL II MONAIIIIAL Exhaust shall be discharged outdoors at a point where it will not cause a nuisance Change orders and modifications submitted by the contractor shall not be honored or reintroduce the exhaust air back into the building, and not directed onto RD RETURN DIFFUSER PIPE RISER "PEOPLE&PRODUCTS YOU CAN without the express written approval bythe owner, architect,general contractor Piping TD TRANSFER DIFFUSER TD PIPE DROP COUNT ON" p pp walkways. For environmental exhaust, maintain at least 3' between any exhaust 2" HIGH DENSITY RIGID Po BOX 810 GC or prime) and/or engineer of record. termination and openings into the building, and property lines. Maintain at least 0 THERMOSTAT PIPE TAKEOFF(FROM BOTTOM OF MAIN) ( g Pipe material, connectors, valves,fittings, expansion and vibration controls shall beg' p p y 825A CHAMBERS AVENUE 10' between any mechanical intake and any environmental exhaust. Product BOARD INSULATION UNDER PIPE TAKEOFF(FROM TOP OF MAIN) EAGLE,CO 81631 Codes and Standards approved and rated for the operating temperature and pressure of the hydronicDRIVEWAY(R-10 MINIMUM). 0 SENSOR(CALL OUT ON DRAWINGS) 800.543.9365 conveying outlets shall be 10' away from property lines, operable openings and PIPE END CAP Contractor to obtain all necessary certificates of permit and inspection. The system, and conform to the standards listed in Table 1202.4 of the IMC or anwww.randhmechanical.com above grade. Product exhaust shall be at least 3 feet from exterior walls and roofs. FIRE/SMOKE DAMPER PIPE CONTINUATION heating,ventilating, and air conditioning systems shall be installed and tested in approved equivalent. Fireplace appliance vent terminations shall not be within 12" of anydoor swing - "4 'W` p pp PIPE EXPANSION GUIDE I accordance with the following codes, standards and permitting requirements Piping shall be sized for no more than 3.5' of head loss per 100 feet of pipe and a FIRE DAMPER - __ 4 door stops and closers cannot be used to meet clearance requirements. -IIF- PIPE UNION 4- under the authority having jurisdiction. Where there are conflicts between the maximum velocity of 4 feet per second. * T" Outdoor air intake terminations shall be protected from the outdoors with SNOWMELT TUBING DETAIL ® �` MOTOR OPERATED DAMPER(MOD) --X- PIPE ANCHOR 54 Nur%awe I Free Epimfx I Deur o.Kd end ry.isit!I CcMxl lh%de? codes,the strictest interpretation shall apply. Provide corrosion protection when joining piping of different materials. =r=corrosion, animal and weather resistant 1/4"to 1/2" screening. FLEXIBLE PIPE CONNECTION Where copper is utilized, anypiping 2-1/2" and smaller shall be e "L" and NO SCALE MANUAL BALANCING DAMPER SEAL: pp p p g type Direct vent terminations from condensing appliances shall be at least 12" above --- PIPE EXPANSION JOINT 1. Local ordinances as interpreted by the authority having jurisdiction in the soldered or brazed. Joining surfaces shall be cleaned, and fluxed prior to grade or highest snow level, and shall not be within 10 feet of anyopening into anyi_�°I CHANGE OF ELEVATION Town of Vail BuildingDepartment and the state of Colorado. g p gPOINT OF NEW CONNECTION p completing thejoint. Anycopper piping 3" or larger shall be silver soldered. Iron NOTE: I (D)DROP (R)RISE p g p p g adjacent building. =pm l- PLUG VALVE t""`,,, 2. 2015 International Mechanical Code (IMC). pipe shall be schedule 40 black steel flanged, grooved, pressed,flared, welded or 1. PROVIDE PIPING INSULATION AS REQUIRED INIIt FLEXIBLE DUCT CONNECTION 3. 2015 International Building Code (IBC). by other approved means and material. MECHANICAL SPECIFICATIONS. -0 - CHECK VALVE ^rOLf04e,;1),1Heating andChilled Water System TURNING VANES IN 90°ELBOW - BALL VALVEF7.1•7%.°••7V% 4. 2015 International Residential Code (IRC). Provide solder compatible to material and approved for application. r 2. PRESSURIZE SNOW MELT TUBING TO 100 PSI AIR TO DUCT SIZES ARE NET FREE AREA - BALANCING VALVE i _ 5. 2015 International Energy Conservation Code (IECC). Valves shall not have a Cv rating with a pressure loss greater than 2 psi. Anyboiler, heatingwater, or water based chiller workingfluid, and piping shall be PREVENT CRUSHING OF TUBE WHEN THE CONCRETE 1ST NO.IS DUCT WIDTH. r 4 ��I p p g �F- FLOW REGULATOR VALVE I 6. 2012 International Fuel Gas Code (IFGC). Provide isolation valves on both the supply and return side of any boiler, pressure filled with 30% propylene glycol and 70%distilled water if all piping is within the IS POURED. 2ND NO.IS DUCT DEPTH. -N� BUTTERFLY VALVE ', • 7. 2012 International PlumbingCode (IPC). vessel, heat exchanger, pump, and pressure reducing device. SECTION THRU ROUND DUCTif y' � = ( ) conditioned envelope. Any heating or chilled water outdoor piping system shall be C� r ■. Abovegrade domestic water piping shall be drawn tube type "L" wrought copper50% 50% PRESSURE REDUCING VALVE �'% fONA �1I = 8. American Society of Heating, Refrigeration, and Air Conditioning Engineers p p g Yp g Pp filled with propylene glycol and distilled water. Contractor to provide the approved fittings. Domestic water piping and fittings shall comply with NSF appropriate freezeprotection and corrosion inhibitor appropriate to match the SECTION THRU SUPPLY AIR DUCT 'N‘,,....,...•.---- and ' (ASHRAE). CIRCUIT SETTER 2-WAY CONTROL VALVE 372 and shall have a weighted average lead content of lead of 0.25%or less. All installed boiler or chiller heat exchanger and material type. Verify fill requirements SECTION THRU RETURN/EXHAUST DUCT 9. National Fire Protection Association (NFPA). CHECK VALVE domestic water valves shall be compatible with the installed piping and fittings and with manufacturer and installation manual. All heating and chilled water systems 3-WAY CONTROL VALVE 10. Sheet Metal and Air Conditioning Contractors National Association, meet NSF 61 in allpotable supply drinkingwater-this includes all ball,gate, OMIT ON SINGLE ROUND DUCT TURN DOWN NO. DATE pp Yshall be cleaned and flushed prior to energizing boiler or chiller contractor to PUMP INSTALLATIONS z� Inc. (SMACNA). butterfly, globe, plug, pry, backflow prevention, check and solenoid valves. provide wye strainer, expansion tank and air separator to protect piping and4 4-WAY CONTROL VALVE C SUPPLY DUCT TURN DOWN equipment. H PRESSURE GAUGE r-x-� -li DIFFERENTIAL BYPASS VALVE Warranty, Materials and Workmanship Pipe Insulation I,-W/GAUGE COCKS -'_ RETURN/EXHAUST DUCT TURN DOWN Snowmelt '• CFM-SO SUPPLY REGISTER/DIFFUSER/LOUVER I \ STRAINER 0 Manufacturer trade names and catalog numbers stated herein are intended to Pipe insulation shall be required on any heating and cooling piping and shall NECK SIZE indicate the qualityof equipment or materials desired. All manufacturers not conform to section C403.2.10 and thickness and thermal conductivityin TableNECK NATURAL GAS PRESSURE REGULATOR Snowmelt tubing shall be a nominal 5/8" diameter cross linked polyethylene with NECK SIZE RETURN REGISTER/DIFFUSER/LOUVER ,4 specifically listed or scheduled require prior review before installation.All materials C403.2.1 of the IECC and 1204.1 of the IMC. Pipe insulation shall have a smoke an oxygen barrier manufactured under the Engle method. Installed tubing shall be CFM-o.A.O AIR VENT and equipment shall be of the highest qualityandperformance. If a modification to developed length of 50 or less and a flame spread ratingof 25 or less. CIRC 0111,1 NECK SIZE OUTSIDE AIR REGISTER/DIFFUSER/LOUVER g p g p insulated below and at all sides by at least R10 insulation. Tubing loop lengths shall the specified equipment is desired,the contractor shall provide a written request Outdoor pipe insulation exposed to weather shall be protected from damage due be equivalent as measured from the manifold. Manifolds shall have balancing PUMP CFM-EO EXHAUST REGISTER/DIFFUSER/LOUVER PRESSURE-TEMP.TAP NECK SIZE to the engineer of record for review and six(6) copies of submittals describing to sunlight moisture, equipment maintenance,wind and shielded from solar valves and boiler drains for filling. Air pressure test before filling and contractor PRESSURE GAUGE make, model and all the necessary metrics for adequate review. radiation. Adhesive tapes shall not bepermitted. shall verifyno leaks within system before fillingQ CFM DOOR UNDERCUT y -if leaks are found, repair and Any underground piping shall be insulated type "K"to the appropriate thickness repeat the process. Upon filling contractor shall purge tubing and manifolds of all PROVIDE PUMP SUPPORT - te THERMOMETER The installation shall perform according to the design intent and be free of any andprotected from corrosion and degradation with no fittings. Direction changes air-install air vents on highest supply and returns as necessaryin accessible H - AT INLET& DISCHARGE A_� o (A)SECTION CUT LINE g gg pp Y v (B)SHEET SHOWN ON defects for a period of one year upon acceptance by the owner. Contractor shall shall be accomplished with long radius elbows. Provide thermal expansion joints locations. PIPING- DO NOT SUPPORT P.C. PLUMBING CONTRACTOR have current licensing and all necessary general and liability insurance applicable to for piping lengths greater than 50.' Snow and ice melting systems shall include controls capable of shutting off the FROM PUMP MOTOR M.C. MECHANICAL CONTRACTOR the area of installation. system when the surface temperature is above 50 degrees Fahrenheit and no y NOTE: NOT ALL THE SYMBOLS SHOWN ON E.C. ELECTRICAL CONTRACTOR UNION OR FLANGE LEGEND ARE USED ON THIS PROJECT. A.H.J. AUTHORITY HAVING JURISDICTION All materials and equipment shall be installed in a neat and workmanlike manner Condensate Pumps, Drain Piping and Discharge Piping with a PRV precipitation is falling and automatic or manual control that will allow shutoff when CONNECTION by competent specialists of each trade to meet the described and specified the outdoor temperature is above 40 degrees. standards. Provide trapped and vented condensate piping to nearest waste line receptacle. SHUTOFF VALVE Piping may be Type M hard drawn copper with soldered joints, schedule 40 PVC Hydronic and Airside Balancing IN-LINE PUMP DIAGRAM 2 Construction Set 08/31/2016 It is the responsibility of the contractor to verify the desired mechanical equipment with solvent fusedjoints or other approved material. Sequences of Operation: and accoutrements meet any and all spatial constraints,working clearances, pp SCALE 1 Permit Set 08/26/2016 Where condensate may be acidic, in high efficiency(greater than 90%) boiler and Any water and airside flows shall be tested and recorded by a licensed and - accessibility and the design intent of the project. Do not scale drawings-it is up to test and balance contractor under NEBB or AABCguidelines. Provide 6 NO. ISSUANCE DATE furnace applications, condensate shall be piped through an 18" long x 2-1/2" dia. qualified ( ) the contractor to verify all constraints in the field before completing any work. schedule 40 PVC inline filter, packed with limestone chips, or other approved solid copies of report to the mechanical engineer of record for review. Balance Snowmelt Boiler B-1: Coordinate the mechanical installation with architect,fire suppression, plumbing, contractor toprovide the necessaryadjustments to motors, belts,sheaves, PROVIDE VIBRATION ISOLATING to neutralize the fluid. TYPE PUMP SUPPORTING HANGERS Upon a call for snowmelt from the new outdoor moisture and temperature sensor, boiler B-1 shall electrical, structural, interiors and other mechanical elements prior to installation. balancing valves, quadrants and pumps to meet the specified flow rates+/- 10%. p p Discharge piping from a pressure relief valve shall terminate not more than 6" AT INLET AND DISCHARGE OF METAL BRAIDED be fired up, boiler pumpP-1 and respective snowmelt circulator P-2 shall be energized. The above or not less than twice the discharge pipe diameter above the drain receptor MC to provide all necessary pressure and temperature ports, balancing valves, p g Contractor to complete all functional performance testing according to, but not g p p p dampers, and other measuring access points and devices to complete the required THE PUMP. DO NOT SUPPORT FLEXIBLE CONNECTOR snowmelt system shall provide a 130° Fahrenheit loop temperature until moisture is not detected. or flood rim level. Condensate drain lines shall be configured to permit the THE PUMP FROM ITS MOTOR. limited to, and specified by the sequence of operations, backup modes, alarms, cleaning of blockages without being cut. balancing. 'PIMP power on/off, economizer, hydronic/airside test and balance, and manufacturer Upon completion of any balance, damper position shall be visibly marked and PRESSURE GAUGE Snowmelt Zones SZ-(E)thru SZ-3: }� installation instructions. If testing procedure fails,fix and repeat the test at no labeled and all final positions of all balancing cocks,valves, and operators shall be W/GAUGE COCKS additional cost to the owner. Condensate pumps located in uninhabitable areas shall be interlocked to shut off i &SNUBBER The snowmelt system pumps P-1 & P-2 shall be controlled bya Tekmar 665 controlpanel with an W marked with a center punch. y p p �v equipment when pump fails. W associated 093 combination socket/sensor. When moisture is detected on the sensor and All areas requiring cutting and patching shall be coordinated with the project Boiler Outdoor Setback and Emergency Power Off(EPO)Switch M temperatures are below freezing, the system shall be energized via the Tekmar 665 controller. E Natural Gas Piping •"•"•". E•"�"�"l The associated snowmelt pumpshall energize and boilers shall be enabled to maintain the superintendent and/or general contractor. Locate any utilities prior to excavating. p g I .•••.•.1��.•�•�•4 I g ^♦ A manually operated remote shutdown switch must be installed at each boiler snowmelt loopsupply temperature 130° FProvide idlingfeature such that when the outdoor W a) X-ray concrete walls and/or slabs prior to coring. Coordinate all roof and exterior pp y p ( adj.). Naturalgas piping room entrance. This emergency switch or circuit breaker must disconnect all wall penetrations with the appropriate trades. Any penetrations through a fire wall pip g shall be schedule 40 black iron or galvanized and in accordance temperature drops below 35°f energize snowmelt system and maintain slab temperature at 28°f. If to NFPA 58. Sizes upto 4" shall be threaded. Anygas piping larger4" power to the burner controls per CSD-1 and CE 110(a). V or partition shall maintain the integrity of the fire rating-verify fire rating with p p g than shall be �SHNTOFF VALVE BALL VALVE UP TO 2" L COMBINATION ISOLATION the snowmelt sensor senses moisture the snowmelt system shall fire up and maintain slab A boiler that supplies heat to the building shall have an outdoor setback con ro CO architect. Any material used to prevent fire or products of combustion from welded. BUTTERFLY VALVE 2 Y2"AND LARGER VALVE &CIRCUIT SETTER temperature at 38° F. -1-.that lowers the boiler supply water temperature based on the outdoor AO U penetrating a fire wall or partition shall be UL listed and meet the minimum fire Gas piping shall pressure tested and hold pressure at least 24 hours, and be temperature. rating as prescribed by the architect. Any roof penetrations shall prevent any inspected by the authority having jurisdiction prior to meter connection. STRAINER W/BLOW CHECK VALVE O 0. outdoor elements from entering the roof assembly and/or building. Any gas piping that is underground, penetrating or encased in concrete shall be DOWN VALVE OMIT ON SINGLE /�, sleeved. Gas service piping shall not penetrate building foundation walls at any Final Job Closeout, Operations and Maintenance Manuals PUMP INSTALLATIONS W (ti Ln All equipment installed under this contract shall follow the respective point below grade. Any subgrade piping shall be located at least 12" below grade. The contractor shall provide all construction documents, equipment operations UNION OR FLANGE L C� Anyexposed piping shall beprotected from corrosion, structurallysupported, and and maintenance manuals upon completion of work,to the owner or agent within CONNECTION IN-LINE PUMP DIAGRAM Drawing Sheet Index -C manufacturer installation, maintenance and operation instructions. Provide p p p g pp 90 daysof acceptance. The manual shall be entitled "Operations and Maintenance 00 adequate clearances and access panels for inspection, service, maintenance and any penetration shall be sealed from the outdoors. Natural gas piping on roofsp p NO SCALE (n Manual", with the contact information of project manager,job name and year of ^, the removal of equipment and accessories-not limited to appliances, control shall be elevated at least 3.5 inches. W Co completion. The manual shall include, as a minimum: M10 MECHANICAL SPECS, LEGEND, DETAILS, SCHEDULES 2 devices, heat exchangers,valves, actuators, compressors, burners, and blower Appliances shall be connected to the gas piping system with ANSI 121.75/CSA6.27 O U assemblies. Provide at least a level 30" deep and wide working space in front of all connectors. Maintenance instructions for all equipment, including but not limited to, servicing, &SEQUENCE OF OPERATION • these devices. Offset piping, ductwork and appurtenances as necessary to avoid lubrication, belt and filter requirements. 0 J m. beams, columns and structural members-verify with a structural engineer before Equipment, Drain Pans, Hangers and Supports Equipment suppliers names, addresses, and telephone numbers. M20 MECHANICAL SITE PLAN & BOILER PIPING DIAGRAM (a penetrating any structural member. Equipment catalog submittals, cut sheets and ratings tables. CO > Adequate structural support shall be provided and according to IMC requirements Part numbers for all replaceable parts. . i w Contractor to provide carbon monoxide detectors in any room with natural gas vibration isolators, neoprene pads and insulation saddles shall be required to As built drawings. > 1.1.1 ^ burning appliances. Provide detectors per local code and authority having support any piping, equipment and ductwork from structure without noise Air and/or water systems balance report as specified. W LO jurisdiction. propagation and damage to integrity and operation. Control diagram or drawing and operation sequences. E Contractor to provide temporary heat, outdoor pads, drain pans, sensors, water Startup and all functional performance testing reports. N- Cleanup detectors, alarms, drains and any other appurtenance necessary for a functional Commissioning report completed by the design professional to ensure operations mechanical system. are as intended by the design team, basis of design and owner project The contractor shall leave the workspace and equipment in an orderly and unsoiled Where damage to any building components could occur as a result of overflow requirements. 0 condition during and upon completion of work. Contractor is responsible for from the equipment condensate or drain removal system, provide either of the Inspection reports including rough in,final and certificate of occupancy by the C removing own debris,trash, and remaining material. following four alternatives. Provide an auxiliary 1-1/2" deep drain pan three inches authority having jurisdiction. A detailed list of all design criteria including but not larger than the equipment and drain. Provide a separate overflow drain connected limited to: building heat loss; gain;thermal conductivity R values for any roof, wall, ( Electrical to the drain pan at a point higher than the primary drain, provided with the window, door, and slab assemblies; water heating load; equipment capacities and + ' equipment. An auxiliary drain pan without a drain equipped with a water efficiency; and any other relevant loads and metrics of the project shall be located Motors, starters, overloads,sensors, relays, solenoid valves,transformers and detection device conforming to UL 508 that will shut off equipment prior to at the electrical panel. variable frequency drives shall be provided by MC unless otherwise indicated on overflow. Provide a water level detection device conforming to UL 508 that will Valve tagging chart as hereinbefore specified. shut off the equipment served in the event the primary drain is blocked. Guarantee and warranty letter for at least a one year period. Snowmelt Schedule Boiler Schedule OR APPROVED EQUAL SHEET TITLE: TUBE CAPACITY(MBH)@ GAS PRESS. RELIEF Ex/CAI OPER. MECHANICAL ZONE MANUFACTURER& AREA(SQ BTUH/5Q SURFACE TUBE DIA NUMBER LOOP GPM/ GPM/ UNIT LOCATION OF 8000'ASL (IN WC) FLOW MAX PD ELECT.DATA DIMENSIONS SERVICE SPACING PD(FT) REMARKSTAG MFR&MODEL NO. AREA SERVED EQUIPMENT (GPM) (FT) PRESS EWT("F) MT CI) DIA. WT. REMARKS SPECIFICATIONS TAG MODEL NO. FT) FT FINISH (IN) ON) IN LENGTH LOOP MANIFOLD IN OUT MIN MAX (PSI) V/PH/Hx (IN) (LBS) L(IN) H(IN) W(IN) LEGEND 1 RAHAU RAUPEX UPPER RAMP 629 125 CONCRETE 3/4 9 4 210 1.85 7.4 5.77CAMUS DYNAFORCE EAST RAMP MECHANICAL 8 1 3500 SNOWMELT SYSTEMS AREA 3,500.0 2,940.0 7 14 266.0 22.0 30 105 130 120/1 /60 10"/12" 2100 47 93 36 1,2,4,5,6,7, 8&9 DETAILS & 2 RAHAU RAUPEX LOWER RAMP 1,495 125 CONCRETE 3/4 9 9 221 1.95 17.6 6.71 50% 3 RAHAU RAUPEX CHARTER ENTRY 1,662 125 CONCRETE 3/4 9 10 222 1.95 19.5 6.71 PROPYLENE 1 -OUTDOOR RESET,2-50%P.G., 3-30% P.G.,4-FLOW SWITCH, 5-LOW LIMIT CUTOFF,6-E.P.O. SWITCH,7-"B"-VENT COMBUSTION AIR PIPING, 8-OUTDOOR MODEL,9-NATURAL DRAFT CAI,AL29-4C 3161 OR UL636 CPVC EX SCHEDULES EX RAHAU RAUPEX EXISTING WALKS 15,522 125 CONCRETE 3/4 9 90 230 2.02 182.0 7.43 GLYCOL EX RAHAU RAUPEX EXISTING POOL DECK 1,261 125 CONCRETE 3/4 9 8 210 1.85 14.8 5.81 Pump Schedule OR APPROVED EQUAL PROJECT NUMBER: 47690 TOTAL ELECTRICAL DATA PROJECT MANAGER: BFW UNIT PIPING LOCATION OF - Glycol Feeder Schedule OR APPROVED EQUAL TAG MFR&MODEL NO. ARRANGEMENT EQUIPMENT TYPE GPM HEAD RPM REMARKS DRAWN BY: RH TANK DIMENSIONS ELECTRICAL DATA (FT) V/PH/Hx I HP CHECKED BY: RH UNIT LOCATION OF FREE FLOW OPERATING CAMUS TAG MFR&MODEL NO. AREA SERVED EQUIPMENT VOLUME L(IN) W(IN) H(IN] (GPM) W V/PH/Hz WEIGHT(LBS) REMARKS P-1 BOILER INJECTION MECHANICAL AREA BASE MOUNTED 266.0 27' - 115/1/60 3/4 SCALE: AS NOTED (GAL) SECONDARY TO SHEET NUMBER: GF-E AXIOM-MF300 SNOWMELT MECHANICAL RM 17 11.75 11.75 36.00 0.7 50 120/ 1 160 160 - P-2 GRUNDFOS TP 100-160/2 NEW&E)4STING MECHANICAL AREA BASE MOUNTED 242.0 35.0 - 460/3/60 3 M I 0 ZONES 1 of 2 Construction Set