Loading...
HomeMy WebLinkAboutDRB16-0385_M20_1478904384.pdf „zpvit, or Pip r _ Amiv.z7.of., -w mo. Heated walkway - . -- l�� GENERAL NOTES: r ry ��� DRB ���'I -��`` APPROVED 9/12/2016 along West I r �'����/ '�. 12:00:00 AM 1. THE NEW SNOWMELT BOILER SHALL BE LOCATED WITHIN r ' '' drip THE EXISTING BOILER MECHANICAL ENCLOSURE. THE �� NEW EXHAUST SHALL BE ROUTED OUT TO Iitriat �r/���'6�I,. I �� vor APPROXIMATELY THE SAME LOCATION. NEW TUBING �/ ��� lir ��'� ������ ��`SHALL REPLACE THE OLDSNOWMELTTUBINGINSZ-2 AND Irc e e ween a ®.-•. ����, , - ��� . THE LOWER RAMP CONCRETE REPLACED. NEW TUBING fa _ p 0' �e����' 4 SHALL BE ADDED TO THE NEW PAVERS IN SZ-1, AND NEW � A AA ■ /' %% ..., . CONCRETE ON THE UPPER RAMP SERVED BY NEW SM 1. � /, 0,,,,,,,,,,,,,:,„) .11, G'3 � G� ��t�HAN�CAL .., rn e rs e c o n of /r-- "PEOPLE&PRODUCTS YOU CAN 2. INSTALL TRAFFIC RATED MANIFOLD BOXES. �� /�/� ,��'riayV �G PO NTT OX ” ���� 1r, --- ----- �� 825A CHAMBERS AVENUE '� , ,/ , - -- ---- -- ---- E:::::::631 AGLE,CO 81631 ,�', '� ' - -- ---- �' 800.543.9365 Lionsheadand2.. - 'Aii, 1 �/9 , ----------- ---- �� www.randhmechanical.com PLAN NOTES: ® .A, .±1_-2...21,... O1" SMS/R TO SM 1. MANIFOLD SHALL BE LOCATED IN '.' f 1 4% e a rr� o1 .0 a i n - 2 '� 71 Nag sn 4e FxLalmx anllyOrndmd qe eld LeMslWled, CEILING BELOW UPPER RAMP. �. or 7(� `-- , A o ��. I�1 145010' D I , �'� SEAL: O2 MECHANICAL BOILER ENCLOSURE AND PIPING BELOW , �0i 1 :; 1' as se e a on,' is. VA1t....' Odic. p ��f --poo c►c 0 2" SMS/R CONTINUES TO (E) PORTE DE COCHERE TUBING ' ,� 629 SQFT ��f ;_._ ,���'W 1'�` �' r MANIFOLD. . at /'t . ( > .tthebackof curb and :-;�1 - - 48 1-1/4" SMS/R CONTINUES TO E POOL DECK TUBING. �� 1 ;, :: - ® f 1 1/2" SMS/R CONTINUES TO (E) LOADING DOCK MANIFOLD. ��o� PA4 ��' �,JI: C .. .,,,--- 4 = 1 1/2" SMS/R TO SM 1. 4(� A gutter • Is IL possible to �oopt ' •��•� it Z • © 1'� NO. DATE Arl 1495 SQFT 2.24 ethisbackgrade . . / <>lOre fird 1 l'is IVO 42 2, PI Vii► 6071- Trei . 'Trn varit-i o / _ 0 / i .: 44iv OA, KA' SsS .1.4r, Afr gra :: lit �'0. :. .: ;//,, /4.2.1 .. 0.--4,' .• ----lir r orsigio,A4trAvi 11 ---- --- -------- ---- - ,� ----,.-.410r,���* 2 Construction Set 08/31/2016 —2 NEW SNOWMELT i ���� ,�� � ��� /�I� 1 Permit Set 08/26/2016 I','� • 4-`�---------------............................................... ------- ---- ---- ------ 1-1/4" P SENSOR AND �ormr_vvroonniml.�� V i' / ` 111111111116 IIIII rr NO. ISSUANCE DATE zahoo, ,��1: 1 SOCKET 001111.11121111111.91111111111161011111111, ,44.1 Mr 67:'‘ l'A'‘14941#741505.4., p4r4 ar' I I an lab I I 1°1 I ill I I WI 4111116- grilardirak- r•ApP4PVIA r Ilri 11111 llibbals treVAPIIMAIrtwArleArAlr 011111011 la ii-Aw orealOt �� Affik pff- PHONE SQFT /�) E . , Nc.b<c ' a..) a) ik" .n, ^.n..n.,n..^.�^��^��n� ®® 0 LOOPS P ✓„,,,, , : :, i?/71662 ��1)= • ly126CI al LO 1}z” H H H H ©© 9 LOOPS ()� i CO 1" V 1 ®v 4 LOOPS `• V •_ � = O 0 ..,.s.t.s..e..1.: L:„., v/, ,...,_ -y,;,,_-, -v _ 0 _1 ._ „,,2-1/2" CZ ®® ESTIMATED(87)215'LOOPS (C1./: � 2-1/2" > LLI N fii, Outdoor ResetPURGE VALVE ALL EQUIPMENT IN THIS BOX •\c(TYP.) SHALL BE LOCATED IN LOWER Schedule `�3C 19.9 9. •GPM GLEVEL MECHANICAL AREA. A OIfTBOOB SUPPLY WATER 7(M PERATURE ' O 1 y .. - TEMPERATURE(F) SEfP61 NF(F1 C) FLOWSET ACCUSETTER AUTO AIR VENT EXISTING AIR SEPARATOR �ANC/BELOW 170 O .15 170 /0 BALL VALVE BALANCE VALVE SET TO4 PIPE DIA. -5 1B2 O (TYP.) i , 103.0 GPM7./...''--(MAX.) 0 157 O 'n''• F 'n'' 5 149 ( \ la e242 4" ■ I ■ 10 143 4 2 GPM �, • 130'F TT • TT 15 137 [ o p o 130°F • I • - l� • 2025 131 125 SUPPLY Q RETURN 90 119 SENSOR SENSOR ti 1 40 113 107 • • PIPE DN.TO 4"-Q 4" 45 101 J. FLOOR DRAIN 60 55 82 MECHANICAL SITE PLAN / SN O W M E L T PLAN /�'�AXIMUM OF 4 W' "- \` /2 10"O EXHAUST LOW > /. PIPE DIAMETERS. ilik • /,"MANUAL FILL- FLONFCHECK J CONNECTION REFERENCE 75 76 6 ��"S$'�� m AA LL SYSTEM WITH VALVF(TYP.) BOILER SCHEDULE 77 70 NORTH SYSTEM LOOP SYSTEM LOOP GENERAL NOTES 50/50 MIX OF WATER SCIEDIAE NOTES: AND'DOWFROST" --13RDpO 1-oIR RESET SCHEDULE SHALL BE FULLY ADJUSTABLE ALL RESET SCHEDULING SHALL BE 1/16" 1 ' 0 U 1. SEE INLINE PUMP DETAIL,SHEET M10,FOR — NATURAL DRAFT 12"0 COMBUSTION AIR CALIBRATED DDRING THE COMMISSIONING DF TYPICAL PIPING AT ALL INLINE PUMPS. BLOW DOWN TO FD ... . .n. INLET-SEE BOILER SCHEDULE FOR THE MECHANICAL SYSTEMS. SEE SEQUENCES OF FURTHER INSTALLATION INFORMATION OPERATION ON M1.0. SHEET TITLE: 2 ALL CLOSELY SPACED TEES SHALL BE WITHIN 4 BOILER BOX REQUIRES A MINIMUM 36x36" PIPE DIAMETER CENTER TO CENTER SPACING. FLOWSET o LOUVER FOR CAI ACCUSETTER MECHANICAL BOILER LOOP 3. INSTALL AIR VENTS AT ALL HIGH POINTS. BALANCE VALVE F IN&OUT 4. THE R AND PR VALVE TO MANUAL FILL OPEN 0� 3" (266 GPM) OR MANIFOLDFILL SNOWMELT SYSTEM WITH A SYST OPE TION NOTE: WATER AND PROPYLENE GLYCOL.AFTER THE TEKMAR(E) /...e...1 • �r"" - ►►� SITE PLAN & NO VALVING IS TO BE INSTALLED BETWEEN THE TEES(NOISANDINCLOSE •__ - PIPE 1}¢"PRESSURE EXCEPTIONS). - RELIEF PIPING TO GLYCOL FEEDER. 1 FLOOR DRAIN CLOSELY SPACED TEES DETAIL -ftBOILER PIPING p NO SCALE ALL EQUIPMENT IN THIS BOX a 266 GPM 1 F SHALL BE LOCATED IN LOWER MOISTURE AND AIR TEMPERATURE SENSOR LEVEL MECHANICAL AREA. AND SOCKET • ' I _ ,i ]l PIPE BOILER CONDENSATE TO — DIAGRAM NEUTRALIZATION BASIN AND TRENCH DRAIN HEAT TAPE AND NO PTRAPS BOILER PIPING DIAGRAM PROJECT NUMBER: 47690 PROJECT MANAGER: BFW NOSCALE DRAWN BY: RH CHECKED BY: RH SCALE: AS NOTED SHEET NUMBER: M20 2 of 2 Construction Set /