Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Vail Village Filing 2 Lot E & F (21)
eC) �0 e SECTION 15010 1. INSULATED PIPING: COMPLY WITH THE FOLLOWING INSTALLATION REQUIREMENTS. 3.1 INSTALLATION: B. ELECTRICAL WIRING: INSTALL ELECTRICAL DEVICES FURNISHED BY MANUFACTURER ''s�/O`�•`S °°ee��e° \�~`a` GENERAL PROVISIONS BUT NOT SPECIFIED TO BE FACTORY-MOUNTED. FURNISH COPY OF MANUFACTURER'S AL 2. 2. SHIELDS:PROVIDE PROTECTIVE SHEET SHIELDS,MSS TYPE 40 ON COLD PIPING 2" A. GENERAL. INSTALL CONDENSING UNITS IN ACCORDANCE WITH MANUFACTURERS WIRING DIAGRAM SUBMITTAL TO ELECTRICAL INSTALLER AND LESS. SHIELDS SHALL SPAN AN ARC OF 180 DEGREES AND SHALL BE MINIMUM INSTALLATION INSTRUCTIONS. INSTALL UNITS PLUMB AND LEVEL,FIRMLY ANCHORED IN 1.1 GENERAL: 8"LONG. LOCATIONS INDICATED,AND MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES. 3.3 FIELD QUALITY CONTROL: - A. ALL BIDDERS SHALL BECOME FAMILIAR WITH SITE CONDITIONS PRIOR TO SUBMITTING 3. INSU-ATION INSERTS:PROVIDE ASBESTOS-FREE CALCIUM SILICATE INSERT B. INSTALL ROOF:iMOUNTED UNITS ON EQUIPMENT SUPPORTS ON ROOF CURBS WITH A. GENERAL: START-UP COMPUTER ROOM AIR CONDITIONING UNITS,WITH BIDS. ENCF%SED WITH A VAPOR BARRIER AND A SHEET METAL SHIELD FOR COLD PIPING WATER PROOF FLASHING. ANCHOR UNIT TO SUPPORTS WITH REMOVABLE FASTENERS. MANUFACTURER'S START-UP INSTRUCTIONS. TEST CONTROLS AND DEMONSTRATE: 2-1/2"AND LARGER. COMPLIANCE WITH REQUIREMENTS. REPLACE DAMAGED OR MALFUNCTIONING B. ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH LOCAL AND STATE CODES. C. AIRnCOOLED CONDENSING UNITS: CONNECT REFRIGERANT PIPING TO UNIT:MAINTAIN CONTROLS AND EQUIPMENT. B ALL DUCT HANGERS SHALL BE SHEET METAL STRAP OR ANGLE IRON IN COMPLIANCE REQUIRED ACCESS TO UNIT. C. EQUIPMENT SCHEDULES ESTABLISH A QUALITY AND DESIGN STANDARD. SUBSTITUTIONS WITH SMACNA GUIDELINES. MUST BE EQUIVALENT IN PERFORMANCE, MATERIAL,SPACE,AND CONFIGURATION 1. INSTALL FURNISHED FIELDF MOUNTED ACCESSORIES. END OF SECTION 15787 REQUIREMENTS, THE PROJECT ENGINEER OR ARCHITECT'S DECISION WILL BE FINAL AND MAY BE BASED ON BOTH CERTIFIED TEST DATA AND SUBJECTIVE REASONING. END OF SECTION 3.2 FIELD QUALITY CONTROL: SECTION 15830 1.2 EXAMINATION OF BIDDING DOCUMENTS: A. CHARGE SYSTEMS WILL FULL CHARGE OF REFRIGERANT AND OIL.AND TEST FOR LEAKS. A. EXAMINE THE BIDDING DOCUMENTS CAREFULLY,NOT LATER THAN SEVEN DAYS PRIOR SECTION 15250 REPAIR LEAKS AND REPLACE LOST REFRIGERANT AND OIL. TERMINAL UNITS TO THE DATE OF RECEIPT OF BIDS. WRITTEN REQUEST FOR INTERPRETATIONS OR INSULATION 1. INSTALL CORE IN FILTER DRYER AFTER LEAK TEST,BUT BEFORE EVACUATION, PART 1 GENERAL CORRECTIONS OF ANY PERCEIVED DISCREPANCIES,AMBIGUITIES,INCONSISTENCIES,OR 'DRAWING TITLE ERRORS DISCOVERED SHALL BE SUBMITTED TO THE ARCHITECT. ANY INTERPRETATION 2. EVACUATE REFRIGERANT SYSTEM WITH VACUUM PUMP UNTIL 35 DEGREES F IS 1.1 DESCRIPTION OF WORK: OR CORRECTION WILL BE ISSUED AS AN ADDENDUM BY THE ARCHITECT_ ONLY A 1.1 PIPING INSULATION INDICATED ON VACUUM DEHYDRATION GAUGE. WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING. NO A. EXTENT OF TERMINAL UNIT WORK IS INDICATED ON DRAWINGS AND SCHEDULES,AND BY BIDDER SHALL RELY UPON INTERPRETATIONS OR CORRECTIONS GIVEN BY ANY OTHER A. FIBERGLASS PIPING INSULATION:ASTM C547,CLASS 1,'1("FACTOR SHALL BE MAXIMUM REQUIREMENTS OF THIS SECTION. METHOD, IF DISCREPANCIES,AMBIGUITIES, INCONSISTENCIES,OR ERRORS ARE NOT 0.24 AT 750F,AND ALL PURPOSE JACKETING,ASTM 0921 UNLESS SPECIFIED OTHERWISE END OF SECTION 15670 COVERED BY ADDENDUM OR WRITTEN DIRECTIVE,INCLUDE IN THE BID LABOR, AND HAVE RATINGS OF 25 OR LESS FLAME SPREAD AND 50 OR LESS SMOKE B. TYPES OF TERMINAL UNITS REQUIRED FOR PROJECT INCLUDE THE FOLLOWING: MATERIALS,AND METHODS OF CONSTRUCTION RESULTING IN HIGHER COST. AFTER DEVELOPMENT. AWARD OF CONTRACT,NO ALLOWANCE OR EXTRA COMPENSATION WILL BE MADE DUE SECTION 15787 1. FANI..ICOIL UNITS. TO FAILURE OF MAKING THE WRITTEN REQUESTS AS DESCRIBED ABOVE. B. PIPING INSULATION APPLICATION AIR COOLED COMPUTER ROOM AIR CONDITIONING UNITS 1.2 SUBMITTALS: B. BE RESPONSIBLE FOR ITS PROMPT DELIVER OF REQUEST. FAILURE TO SO REQUEST 1. REFRIGERANT SUCTION PIPING: 1"THICK FOR PIPE SIZES 1"AND LESS,1-1r2"THICK CLARIFICATION OF ANY INADEQUACY,OMISSION,OR CONFLICT WILL NOT RELIEVE FOR PIPE SIZES OVER 1". PART 1 GENERAL A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA,FOR TERMINAL RESPONSIBILITY OF DOING SO. THE SIGNING OF THE CONTRACT WILL BE CONSIDERED UNITS SHOWING DIMENSIONS,CAPACITIES, RATINGS.PERFORMANCE CHARACTERISTICS, � AS IMPLICITLY DENOTING A THROUGH COMPREHENSION OF THE FULL INTENT AND 1.1 DESCRIPTION OF WORK GAUGES AND FINISHES OF MATERIALS,AND INSTALLATION-STARTUP INSTRUCTIONS. SCOPE OF THE WORKING DRAWINGS AND SPECIFICATIONS. SIGNING OF THE CONTRACT END OF SECTION INDICATES AGREEMENT TO ALL OF THE CONDITIONS IN THIS SPECIFICATION. A. TYPES OF COMPUTER ROOM AIR CONDITIONING UNITS SPECIFIED IN THIS SECTION B. MAINTENANCE DATA: SUBMIT MAINTENANCE INSTRUCTIONS,INCLUDING LUBRICATION INCLUDE THE FOLLOWING: INSTRUCTIONS,FILTER REPLACEMENT,MOTOR AND DRIVE REPLACEMENT,CONTROL, 1.3 MECHANICAL INSTALLATIONS: ACCESSORIES, "TROUBLE-SHOOTING"MAINTENANCE GUIDE,AND SPARE PARTS LISTS. 1. AIR COOLED COMPUTER ROOM UNITS. INCLUDE THIS DATA,PRODUCT DATA,AND SHOP DRAWINGS IN MAINTENANCE MANUALS; A. DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. EVERY REQUIRED OFFSET,VALVE,FITTING,ETC. SECTION 15870 1.2 SUBMITTALS: CONDENSING UNIT'S PART 2 PRODUCTS A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA,INCLUDING B- DO NOT SCALE DRAWINGS, VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF RATED CAPACITIES OF SELECTED MODEL CLEARLY INDICATED,WEIGHTS,FURNISHED 2.1 MANUFACTURERS: WORK. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. PART 1 GENERAL SPECIALTIES,ACCESSORIES,AND INSTALLATION AND STARTJUP INSTRUCTIONS_ C. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS CALLED FOR IN A. MANUFACTURER: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,PROVIDE PRODUCTS 1.1 DESCRIPTION OF WORK: a B. MAINTENANCE DATA: SUBMIT MAINTENANCE DATA AND PARTS LIST FOR EACH BY ONE OF THE FOLLOWING. EITHER IS BINDING AS THOUGH GALLED FOR IN BOTH. R A. SECTION IYCLUDES: COMPUTER ROOM AIR CONDITIONING UNIT,CONTROL,AND ACCESSORY; INCLUDING D. BEFORE ANY WORK IS INSTALLED,DETERMINE THAT EQUIPMENT WILL PROPERLY FIT THE "TROUBLEnSHOOTING'MAINTENANCE GUIDE. INCLUDE THIS DATA AND PRODUCT DATA 1. FAN COIL UNITS J M SPACE;THAT REQUIRED PIPING GRADES CAN BE MAINTAINED AND THAT DUCTWORK CAN IN MAINTENANCE MANUAL IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. ") 1. AIR vOOLED CONDENSING UNITS. a. AIRTHERM MFG.CO. N BE RUN AS CONTEMPLATED WITHOUT INTERFERENCES BETWEEN SYSTEMS,WITH M STRUCTURAL ELEMENTS OR WITH THE WORK OF OTHER TRADES 1.2 REFRIGERANTS: 1.3 SPECIAL PROJECT WARRANTY: b. CORP. U c DUNHAM-BUSH,INC. F COORDINATE THE INSTALLATION OF MECHANICAL MATERIALS AND EQUIPMENT WITH ALL A. ALL REFRIGERANTS USED FOR EACH CONDENSING UNIT SHALL BE ON THE LATEST EPA A. WARRANTY ON MOTORICOMPRESSOR: PROVIDE WRITTEN WARRANTY,SIGNED BY d. MCQUAY INC. TRADES. LIST OF APPROVED REFRIGERANTS&ENVIRONMENTALLY FRIENDLY. MANUFACTURER,AGREEING TO REPLACE/REPAIR,WITHIN WARRANTY PERIOD, e. TRANE x MOTORSICOMPRESSORS WITH INADEQUATE AND DEFECTIVE MATERIALS AND I, YORK;DIV.OF YORK INTERNATIONAL L COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO B. NO CFC BIkSED REFRIGERANTS SHALL BE USED. WORKMANSHIP,INCLUDING LEAKAGE, BREAKAGE,IMPROPER ASSEMBLY,OR FAILURE TO g. INTERNATIONAL FAN COIL ACCOMMODATE THE INSTALLATION OF MECHANICAL EQUIPMENT AND MATERIALS. PERFORM AS REQUIRED;PROVIDED MANUFACTURER'S INSTRUCTIONS FOR HANDLING, 1.3 SUBMITTALS: INSTALLING,PROTECTING,AND MAINTAINING UNITS HAVE BEEN ADHERED TO DURING 22 FAN! COIL UNITS: o G. INSTALL MECHANICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR WARRANTY PERIOD. REPLACEMENT IS LIMITED TO COMPONENT REPLACEMENT ONLY, REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL,CONNECT A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA,INCLUDING AND DOES NOT INCLUDE LABOR FOR REMOVAL AND REINSTALLATION. A. GENERAL: PROVIDE FAN-COIL UNITS HAVING CABINET SIZES,AND IN LOCATIONS 0 EQUIPMENT FOR EASE OF DISCONNECTING,WITH MINIMUM OF INTERFERENCE WITH RATED CAPACITIES OF SELECTED MODEL CLEARLY INDICATED,WEIGHTS(SHIPPING, INDICATED,AND OF CAPACITIES,STYLE,AND HAVING ACCESSORIES AS SCHEDULED. h OTHER INSTALLATIONS. INSTALLED,AND OPERATING),DIMENSIONS,REQUIRED CLEARANCES,AND METHODS OF 1. WARRANTY PERIOD: 5 YEARS FROM DATE OF ACCEPTANCE BY THE OWNER. INCLUDE IN BASIC UNIT CHASSIS,COILS,FANBOARD,DRAIN PAN ASSEMBLY,FANS, v TITLE ASSEMBL"OF COMPONENTS,FURNISHED SPECIALTIES AND ACCESSORIES;AND HOUSING,MOTOR.FILTER,AND INSULATION. , H. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES AND PERMITS. INSTALLATION AND START-UP INSTRUCTIONS. PART 2 PRODUCTS s v B. CHASSIS: CONSTRUCT CHASSIS OF GALVANIZED STEEL WITH FLANGED EDGES. �y 1.4 REMODEL PROJECTS: B. OPERATIC N AND MAINTENANCE DATA: SUBMIT MAINTENANCE DATA AND PARTS LIST FOR 21 MANUFACTURERS: EACH CONDENSING UNIT.CONTROL.AND ACCESSORY:INCLUDING'TRO'UBLE SHOOTING' C. INSULATION: FACED, HEAVY DENSITY GLASS FIBER. Z A. IN A5 MUCH AS DESIGN FOR REMODEL AND/OR REHABILITATION REQUIRES THAT A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,PROVIDE MAINTENANCE GUIDE;PLUS SERVICING,AND PREVENTATIVE MAINTENANCE CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS,AND BECAUSE PROCEDURES AND SCHEDULE. INCLUDE THIS DATA AND PRODUCT DATA IN PRODUCTS OF ONE OF THE FOLLOWING: D. CABINET: CONSTRUCT OF 181 JGA STEEL REMOVABLE PANELS,1&IGA FRONT.PROVIDE SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING MAINTENANCE MANUAL:IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. INSULATION OVER ENTIRE COIL SECTION. CLEAN CABINET PARTS,BONDERIZE, OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING,THE ENGINEER 1. INDOOR PACKAGED UNITS: PHOSPHATIZE,AND FLOW-'COAT WITH BAKEDI_)ON PRIMER.CUSTOM COLOR AS CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL 1.4 SPECIAL PROJECT WARRANTY: SELECTED BY ARCHITECT IN BAKED ENAMEL FINISH. CONSULTING a. LIEBERT G SERVICES HEREIN ENCOMPASS AL CONTINGENCIES, FIELD COORDINATION b. AIRFLOW CO. E. DRAIN PANS: CONSTRUCT OF GALVANIZED STEEL. INSULATE WITH POLYSTYRENE OR 00 DURING CONSTRUCTION IS IMPERATIVE. MAKE REASONABLE ALLOWANCES FOR UNSEEN A. WARRANTY ON MOTOR/COMPRESSOR: PROVIDE WRITTEN WARRANTY,SIGNED BY CONDITIONS. MANUFACTURER,AGREEING TO REPLACEIREPAIR,WITHIN WARRANTY PERIOD, POLYURETHANE INSULATION. PROVIDE DRAIN CONNECTION. Oj MOTORS/COMPRESSORS WITH INADEQUATE OR DEFECTIVE MATERIALS AND 2.2 COMPUTER ROOM AIR CONDITIONING UNITS: O B. THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION. WORKMANSHIP,INCLUDING LEAKAGE, BREAKAGE,IMPROPER ASSEMBLY,OR FAILURE TO F. FANS: PROVIDE CENTRIFUGAL FORWARD CURVED DOUBLE WIDTH WHEELS OF U CONTINUED OPERATION OF THE FACILITY SHALL NOT BE HINDERED BY THIS WORK_ PERFORM AS REQUIRED;PROVIDED MANUFACTURER'S INSTRUCTIONS FOR HANDLING, REINFORCED FIBERGLASS,IN GALVANIZED STEEL FAN SCROLLS. ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED DUE TO THE A. GENERAL: PROVIDE FACTORYCASSEMBLED AND TESTED AIR COOLED PACKAGED UNITS o INSTALLING,PROTECTING,AND MAINTAINING UNITS HAVE BEEN ADHERED TO DURING AS SPECIFIED/SCHEDULED,CONSISTING OF CASING,CONDENSATE PUMP,LIQUID D.X.A 0 DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES.FURNITURE,EQUIPMENT, WARRANTY PERIOD. REPLACEMENT IS LIMITED TO COMPONENT REPLACEMENT ONLY, G. MOTORS: PROVIDE MOTORS WITH INTEGRAL THERMAL OVERLOAD PROTECTION.RUN 3 FRAME TYPE COOLING COIL,AIR COOLED CONDENSER WITH FAN SPEED CONTROL ETC.;AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE ACCESSIBLE AND DOES NOT INCLUDE LABOR FOR REMOVAL AND REINSTALLATION. LEE-TEMPWINTER CONTROL SYSTEM,FAN,COMPRESSORS,FILTERS,ELECTRIC REHEAT TEST MOTORS AT FACTORY IN ASSEMBLED UNIT PRIOR TO SHIPPING.PROVIDE QUICKLY W WHEN COMPILING HIS BID. COIL, INFRARED WITH AUTOFLUSH SYSTEM HUMIDIFIER,DISCONNECT SWITCH(ES)AND DETACHABLE MOTOR CORDS. Y C. BE RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT OR DUCTWORK REMAINING TO 1. EXTENDED WARRANTY PERIOD: 5 YEARS FROM DATE OF SUBSTANTIAL CONTROLS. PROVIDE CAPACITIES AND ELECTRICAL CHARACTERISTICS AS SCHEDULED.COMPLETION. H. FILTERS: PROVIDE FILTERS AS SCHEDULED. z BE RECONNECTED TO NEW OR EXISTING SYSTEMS. PROVIDE DUCTWORK,PIPING, B. CASING: PROVIDE MANUFACTURER'S STANDARD CASING CONSTRUCTION,CORROSION W CONTROLS,DIFFUSERS,ETC.,AS REQUIRED TO RESTORE CONTINUITY OF SYSTEMS(S), PART 2 PRODUCTS I. DAMPERS: PROVIDE 18-GA STEEL DAMPER BLADES WITH POLYURETHANE STOP ACROSS r PROTECTION COATING,AND EXTERIOR FINISH. PROVIDE'REMOVABLE PANELS WITH V- u y OR TO MAKE NEW WORK MEET EXISTING CONDITIONS,WHETHER INDICATED OR NOT. ENTIRE BLADE LENGTH. PROVIDE FACTORY-MOUNTED ELECTRIC OPERATORS FOR 25 k 1-112 LBS DENSITY FIBER INSULATION AND CONCEALED FASTENERS FOR SERVICE AND 21 MANUFACTURERS: OPEN CYCLE. D. PROVIDE MECHANICAL DEMOLITION REQUIRED, REFER TO ARCHITECTURAL DEMOLITION ACCESS TO INTERNAL PARTS. UNIT SHALL BE BOTTOM F U ARRANGEMENT WITH RETURN AIR IN BOTTOM FRONT AND SUPPLY AIR OUT BOTTOM OF UNIT. Vim► DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED. VISIT SITE PRIOR TO A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,PROVIDE J', ACCESSORIES: PROVIDE THE FOLLOWING ACCESSORIES AS INDICATED AND/OR BID TO DETERMINE EXTENT OF WORK INVOLVED_ EXISTING FIXTURES,MECHANICAL PRODUCT3 BY ONE OF THE FOLLOWING: C. AIR COOLED CONDENSER: THE AIR COOLED CONDENSER SHALL BE THE LOW PROFILE, SCHEDULED: w ir EQUIPMENT,ETC. BEING REMOVED SHALL BE RETURNED TO THE OWNER. DISPOSE OF w SLOW SPEED,AND MULTIPLE DIRECT DRIVE PROPELLER-FAN TYPE. THE CONDENSER > ALL REMOVED PIPING,DUCTWORK,ETC.UNLESS NOTED OTHERWISE. I AIR-COOLED CONDENSING UNITS: 1. FRONT RETURN SHALL HAVE TWO SEPARATE REFRIGERATION CIRCUITS RATED AT 0 DEG F.AMBIENT. o E. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO COMMENCING WORK. a. MCQUAY AIR CONDITIONING GROUP;MCQUAY INC. THE CONDENSER SHALL BE CONSTRUCTED OF ALUMINUM AND CONTAIN A COPPER TUBE„ 2. INSULATED DISCHARGE PLENUM WIDISCHARGE GRILLE Q �, UTILIZE X-RAY AND VISUAL INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED b. TRANE(THE)CO;DIV AMERICAN STANDARD INC. ALUMINUM FIN COIL ARRANGED FOR VERTICAL AIR DISCHARGE. THE'WINTER CONTROL un SYSTEM FOR THE AIR COOLED CONDENSER SHALL BE LEE-TEMP AHS SHALL ALLOW 3, MICROPROCESSOR CONTROLLER � PRIOR TO DRILLING OR CUTTING. C. YORK;DIV OF YORK INTERNATIONAL. START-UP AND POSITIVE HEAD PRESSURE CONTROL WITH AMBIENT TEMPERATURE AT w 1.5 MECHANICAL SUBMITTALS: -30 DEG F. THE PACKAGE SHALL INCLUDE, FOR EACH CIRCUIT,FACTORY INSULATED 4. NON-LOCKING ELECTRICAL DISCONNECT RECEIVERS,PRESSURE RELIEF VALVES,HEAD PRESSURE THREE-WAY CONTROL VALVES A. THE MANUFACTURER'S MATERIAL OR EQUIPMENT LISTED IN THE SCHEDULE OR AND ROTO LOCK VALVES FOR ISOLATING THE REFRIGERANT CHARGE. RECEIVERS SHALL 5. ELECTRIC REHEAT IDENTIFIED BY NAME ON THE DRAWINGS ARE THE TYPES TO BE PROVIDED FOR THE 2.2 AIR11COOL ED CONDENSING UNITS: BE FACTORY MOUNTED READY FOR FIELD CONNECTION TO THE AIR COOLED ESTABLISHMENT OF SIZE,CAPACITY,GRADE AND QUALITY. IF ALTERNATES ARE USED IN CONDENSER. THE HEATER SHALL REQUIRE SEPARATE POWER SUPPLY. PROVIDE A 6. CONDENSATE PUMP LIEU OF THE SCHEDULED NAMES,THE COST OF ANY CHANGES IN CONSTRUCTION FACTORY MOUNTED AND WIRED DISCONNECT SWITCH FOR CONDENSER CONTROL REQUIRED BY THEIR USE SHALL BE BORNE BY CONTRACTOR. A. GENERAL: FACTORY_ASSEMBLED AND TESTED AIR COOLED CONDENSING UNITS, PANEL ACCESSIBLE FROM THE EXTERIOR. PART 3 EXECUTION Uj < CONSISTING OF CASING,COMPRESSORS,CONDENSERS,COILS,CONDENSING COIL D. COMPRESSOR: THE COMPRESSORS SHALL BE HERMETIC TYPE LOCATED IN A SEPARATE 3.1 INSPECTION: j B. BEFORE STARTING WORK,PREPARE AND SUBMIT TO THE ARCHITECTIENGINEER SHOP GUARD,CONDENSER FANS AND MOTORS,AND UNIT CONTROLS. COMPARTMENT WITH CRANKCASE HEATER,VIBRATION ISOLATORS,THERMAL z 0 DRAWINGS AND DESCRIPTIVE DATA FOR ALL MECHANICAL EQUIPMENT AND MATERIALS OVERLOADS,OIL SIGHT GLASS,MANUAL RESET HIGH AND LOW PRESSURE SWITCHES A. EXAMINE AREAS AND CONDITIONS UNDER WHICH TERMINAL UNITS ARE TO BE INSTALLED. Q REQUIRED FOR THE PROJECT. 1. UNIT CASINGS: DESIGNED FOR OUTDOOR INSTALLATION AND COMPLETE WITH AND MAXIMUM OPERATING SPEED OF 1750 RPM. REFRIGERATION CIRCUIT SHALL DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN WEATHER PROTECTION FOR COMPONENTS AND CONTROLS,AND COMPLETE WITH INCLUDE REFRIGERANT SIGHT GLASS WITH MOISTURE INDICATOR,ADJUSTABLE CORRECTED IN MANNER ACCEPTABLE TO INSTALLER. 1.6 RECORD DOCUMENTS: REMOVABLE PANELS FOR REQUIRED ACCESS TO COMPRESSORS,CONTROLS, EXTERNALLY EQUALIZED EXPANSION VALVE AND DISCHARGE SERVICE CONDENSER FANS,MOTORS,AND DRIVES. VALVE. J A. CONTRACTOR SHALL KEEP A COMPLETE SET OF RED-,AHED RECORD DOCUMENT PRINTS E. FILTERS: PROVIDE FILTERS AS SCHEDULED. 3.2 INSTALLATION OF FANa V COIL UNITS: � v r IN CUSTODY DURING ENTIRE PERIOD OF CONSTRUCTION AT THE CONSTRUCTION SITE. B. COMPRESSOR: RECIPROCATING HERMETICr7TYPE COMPRESSOR, 1,750 RPM,DESIGNED A. GENERAL: INSTALL FANnCO1L UNITS AS INDICATED,AND IN ACCORDANCE WITH ONE(1)SET OF RECORD DOCUMENTS SHALL BE PROVIDED TO THE ENGINEER FOR AIR-COOLED CONDENSING,COMPLETE WITH CRANKCASE SIGHT GLASS, F, HUMIDIFIER: THE HUMIDIFIER SHALL BE OF THE INFRARED TYPE CONSISTING OF HIGH MANUFACTURER'S INSTALLATION INSTRUCTIONS. INDICATING FINAL PROJECT CONDITIONS AFTER COMPLETION OF WORK. CRANKCASE HEATER,AND BACKSEATING SERVICE ACCESS VALVES ON SUCTION AND INTENSITY QUARTZ LAMPS MOUNTED HIGH AND OUT OF THE WATER SUPPLY. THE DISCHARGE PORTS. CAPACITY SHALL BE CONTROLLED THROUGH CYLINDER UNLOADING. EVAPORATOR PAN SHALL BE STAINLESS STEEL AND ARRANGED TO BE SERVICEABLE B. LOCATE FAN ICO1L UNITS AS INDICATED,COORDINATE WITH OTHER TRADES TO ASSURE 1.7 OPERATION AND MAINTENANCE DATA: WITHOUT DISCONNECTING HIGH VOLTAGE ELECTRICAL CONNECTIONS. THE COMPLETE CORRECT RECESS SIZE FOR RECESSED UNITS. C. CONTROLS: OPERATING AND SAFETY CONTROLS SHALL INCLUDE HIGH AND LOW HUMIDIFIER SECTION SHALL BE FURNISHED PREPlPED BY THE FACTORY READY FOR A. CONTRACTOR SHALL PREPARE TWO(2)SETS OF MAINTENANCE MANUALS AND SHALL PRESSURE CUTOUTS,OIL PRESSURE CUTOUT,COMPRESSOR WINDING THERMOSTAT FINAL CONNECTION.THE INFRARED HUMIDIFICATION SYSTEM SHALL UTILIZE BYPASS AIR C_ PROVIDE PIPING AS DETAILED ON THE DRAWINGS. INSTRUCT OWNER ON OPERATION OF SYSTEMS. MAINTENANCE MANUALS SHALL CUTOUT,2 nLEG COMPRESSOR OVERLOAD PROTECTION,AND CONDENSER FAN MOTORS FINAL PREVENT CONNECTION. HE I FR OF THE COMPUTER ROOM. HUMIDIFIER SHALL BE REVISIONS: INCLUDE ALL MECHANICAL WARRANTIES. WITH THERMAL AND OVERLOAD CUTOUTS. CONTROL TRANSFORMER IF REQUIRED EQUIPPED WITH OVER-HUMIDIFICATION AUTOMATIC WATER SUPPLY SYSTEM. THE SYSTEM MONITORS AND D. PROVIDE 314"CONDENSATE DRAIN PIPE FROM UNIT DRAIN PAN CONNECTION TO SHALL BE 119❑VOLTS. PROVIDE MAGNETIC CONTACTORS FOR COMPRESSOR AND CONTROLS WATER LEVEL AND HAS AN ADJUSTABLE WATER OVERFEED TO PREVENT NEAREST ADEQUATE FLOOR DRAIN OR DRAIN PIPE, B. THE TESTING AND BALANCING REPORT SHALL BE SUBMITTED AND RECEIVED BY THE CONDENSER I=AN MOTORS, MINERALS WATER LEVEL IT SHALL ACTIVATE A VISUAL-ALARM AND TAKE CORRECTIVE ENGINEER AT LEAST FIFTEEN CALENDAR DAYS PRIOR TO THE CONTRACTOR'S REQUEST ACTION IN THE EVENT OF HIGH AL LOW HUMIDIFIER WATER LEVEL. E. PROTECT UNITS WITH PROTECTIVE COVERS DURING BALANCE OF CONSTRUCTION. FOR FINAL OBSERVATION TIME FRAME REQUIREMENTS,AND SHALL BE INCLUDED IN THE D. CONDENS NG SECTION: CONDENSER COIL SHALL BE SEAMLESS COPPER TUBING O 8,M MANUAL. MECHANIC ALLY BONDED TO HEAVY-DUTY,CONFIGURATED ALUMINUM FINS,WITH PART 3 EXECUTION: SEPARATE AND INDEPENDENT REFRIGERATION CIRCUIT FOR EACH COMPRESSOR. UNITS SHALL INCLUDE LIQUID ACCUMULATOR AND SUBCOOLING CIRCUIT,AND BACKSEATING 3,1 INSPECTION: END OF SECTION 15830 LIQUID LINE SERVICE ACCESS VALVE.CONDENSER COILS SHALL BE FACTORY_ TESTED END OF SECTION AT 450 PSIG,VACUUM DEHYDRATE,AND FILLED WITH A HOLDING CHARGE OF NITROGEN. A. GENERAL: EXAMINE AREAS AND CONDITIONS UNDER WHICH COMPUTER ROOM AIR �, APPROVEn CONDITIONING UNITS ARE To BE INSTALLED. DO NOT PROCEED WITH WORK UNTIL + Community Development Department E. CONDENSER FANS AND DRIVES: PROPELLERFITYPE CONDENSER FANS FOR VERTICAL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED IN MANNER ACCEPTABLE TO � ry pment Sery SECTION 151d0 AIR DISCHARGE;EITHER DIRECT DRIVE OR BELT DRIVE.E: INSTALLER I tJ I Building Safety and Inspection Servicl3 SUPPORTS,ANCHORS AND SEALS F. LOW AMBI!P=NT HEAD PRESSURE CONTROL: FACTORY"iINSTALLED LOW AMBIENT DAMPER 3.2 INSTALLATION OF COMPUTER ROOM AIR CONDITIONING UNITS: SIeec. ASSEMBLE",FAN SPEED CONTROL,OR FAN CYCLING CONTROL FOR OPERATION DOWN TO _.. ..,'national Building CoWnternational Residential DATE: 03-29--06 11 GENERAL -0 DEGREE S F. A. GENERAL: INSTALL COMPUTER ROOM AIR CONDITIONING UNITS IN ACCORDANCE WITH COd^ l s".,,'q c permit The issuance or granting of a permit shall DRAWN BY: LKL MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL UNITS PLUMB AND LEVEL, not be cz:.-,rued to be a permit for,or an approval of,any Violation of A. ALL PIPE HANGERS SHALL BE THREADED ROD WITH CLEVIS OR TRAPEZE SUPPORTS, PART 3 EXECUTION FIRMLY ANCHORED IN LOCATIONS INDICATED,AND MAINTAIN MANUFACTURER'S any r c1 the provisions of this code or of any other ordinance of the CHECKED BY: DLY RECOMMENDED CLEARANCES, jurisdiction. Permits presuming to gNe aullhorlty to violate or cancel the provisions of this code or other Ordinances Of ft jurisdiction shall not be JOB NO: 2006-053 valid. The issuance of a permit based on COnStruCtion documents and other data s"all not prevent the building offlcial from requiring the FILE NAME: P-HVN 1 cormclion of errors in the construction documents and other data,The buildir,3, ctlicial+s also authorized to prevent occupancy or use of a WIUL�LUIJ' SHEET NO. this jurisdiction PLANS EXAMINER: DATE V L�l � Office Co Cotor, Rumo & Assoc. FILENAME:P:\VVMC\2006-053 VVMC CT SCAN\CAD\MECH\P-MSPEC,DWG _ M0.01 PLOT: 03/29/2006 0 3:33pm REV: 03/29/2006 CAD: CDR XREF th Iwa a �.• A.T s �, 1 4 17 ' 19 21 •� S' 0 . 1 E ' 1 E 2 E '••••...E" 1978 1978 1978 3,�� n � PACKAGED AIR CONDITIONING UNIT SCHEDULE I � I I MAMMO FAN DATA REHEAT COIL HUMIDIFIER FILTER DATA 0 AND ACC-2 ESP ESP IN MIN. UCLEAR I I I 4IJORK DESIG. MFR. MODEL CFM WC AT FAN MBH MBH NO. KW NO. KIN LBSI AREA % CONTROL REMARKS E D I C I N E FILE R M S.L. HP S AL ROWS STEPS HR EFF. OFFICE 1-12 XAM AC4 TRANE TWE090 2700 0.1 1.5 44.5• 62.7 4 10 2 -- -- - 30 INTEGRAL 1,3,4.5,0,7 I I MGR- I � ROOM 1978 AC-2 LIEBERT MMD24E 885 0 112 15.9 21A 3 5 2 1.5 4.3 - 30 INTEGRAL 2.3,4.7 I J 8 DRAWING TITLE MARKS: TOIL. ROOM DEMO E .�1�MOUNTED UNIT.BARGE UNIT. PROVIDE DISCHARGE PLENUM WITH GRRLE. ` 10 2 SCAN M E C M. O K K PROVIDE MICR CONTROLLER.ELECTRIC REHEAT,CONDENSATE PUMP -.�� REFRIGERANT _PROVIDE SMOKE�DETECTORELECTRICAL dlSCOMIECT. PENCH-, 1 31 C (E) �G (E) ` .PROVIDE HOT GAS BYPASS I / 0 Lil .CAPACITY BASED ON 9500 FT ELEVATION _ _ _ _ _ s � �L P R --�-- - --- � _____�- AC-2/ACC-2 sm coNSOLE DISCONNECT�E� WAIT (E ARC UNIT 132 MAKEUP WATEERR COM (E) FO E AC-1 � 1, 6 / AIR COOLED CONDENSING UNIT - u MATCHED COOLING CAP. ANIL STEPS LOW AMB. DESIM MFR. MODEL SYSTEM MON AT TEMP. NO. CAPACITY CONTROL CONTROL REMARKS CORRIDOR I DEMO AND CAP (E) COMPONENT 9500' •F COMPR. CONTROL 'F WATER LINE SUM ACG7 TRANE 2TTA0072 AC-1 62.7 95 1 0 � COMPUTER ROOM U I o h ACCT LIEBERT PF01WA AC 2 MA 95 1 0 M NURSERY I ?TECH. RECLINER Q RECOVERY V RY 113 1 130 MARKS: 101 �. s74 U 0 W o I a FIRST FLOOR DEMO HVAC PLAN 0 ' N M p� SALE: 1Ts I=1 —o TITLE C � M1 R � O M Z O x d rn �y N O ..r.7ViG 40 O J 14 17 X19 21 < ° 1 E 1 E 2 E Z g 1978 1978 1978 u N CANT RECLAIM SERVICE VALVE 1 I � MAMMO I r--� RL REPLACE EXISTING e A I ACC-1 AND ACC-2 � l > FILTER DRYER C EAR I I VIJORK E L--i(ON ROOF) DI CINE FILE RM a SOLENOID VALVE - EXAM 0 0 REFERENCE DRAVANG PLAN VIEW SIGHT GLASS I �MGR C E 1 12 ;_-�-P FOR REFRIGERANT PIPE SIZES AOC i E .R EQUALIZER LINE : I ! 19'8 E1PANSION VALVE I I _f #L....XON R) J 1 QD U V W I TOIL. 7/8"RS J 102 CT � I 5/e'RL �Aii0l ` K�-�E � Z 0 wool _ SCAN r 1s78 ROOM AIR II E N CH 6�MlMECT (E} I I 7/s•RS ar it ROOM NR WATER PIPING T � / _ � � � -- � > U AIR COOLED THERMAL BULB. LOCATE 4W CONDITIONER L PR WENT -_.� AC 1 2•RL 7 CONDENSING ABOVE E BOTTOM POSSIBLE TO COIL � - CONSOLE — — _ — — _ _ UNIT J OUTLET WAIT (E) AC UNIT 132 CT 135 TO REMAIN (E) FD E 19 J AC C� f � � T H � 1 REFRIGERANT CHARGE SERVICE VALVE REVISIONS: C - CORRIDOR INN GERRANT PIPING PER E2971 I MA TED MENDAIIONS (LINE CRAC UNIT W/ACCU PIPING DETAIL SCALE: NONE - - \1, RECLINER Aj NURSERY I ECH. RECOVERY -RY 113 130 101 �I DATE: 03-20-06 DRAWN BY: LKL FIRST FLOOR NEW HVAC PLAN CHECKED BY: JOB N0: 200 006-f1E53 SCALE: 1/8"=I'—O" FILE NAME: P-HVN1 SHEET NO. THIS WORK SHOWN AS EXISTING CONDITIONS NOTE: WAS TAKEN FROM OWNER FURNISHED EXISTING CONDITIONS ARE SHOWN WITH DRAWINGS BY CATOR, RUMA & ASSOCIATES, LIGHT LINE WEIGHT. 00. CATOR, RUMA do ASSOCIATES, CO. IS NOT RESPONSIBLE FOR THE ACCURACY OF NEW WORT( INGI_UDFD IN THIS CONTRACT m1mol ANY INFORMATION OR THE ADEQUACY, IS SHOWN WITH HEAVY LINE WEIGHT. SAFETY AND CONFORMANCE TO CURRENT CONNECTION OF NEW WORK TO EXISTING PREVAILING CODES OF ANY WORK SHOWN YYORK IS DESIGNATED BY " � ". KEY PLAN AS EXISTING ON THE DOCUMENTS. Cator, Ruma do Assoc. FILENAME:P:\VVMC\2006-053 VVMC CT SCAN\CAD\MECH\P-HVNI.DWG _ M1.01 PLOT: 03/29/2006 0 2:48pm REV. 03/29/2006 CAD: cdb XREF: bgl.dwg HVN1.dwg tb.dwg keyplan.dwg _ r^ 0 Rb- rR cl s �.� sa v7 0/� Y ■ L rdio Remod I D.P.A. PROJECT # 05903.00 181 West Drive , Vail Colorado 81657 • Fff,A+A" *W APPRQVED C_.'-!^iunity Development *VAKX Depe 1t1 119[t�'Szfety& Inspection TOWNO sef Gmdm 106AA UnlFsrm Building Codq vau ty of Permit l>ta i� arWWWng of■Permit or approve!of p1w,VWficadom and carapadtdM dtall oat be con sb d to be a permit ft or m approval of.any viola"of MY of dte pravidams of dus code or of nay alder ordinance of dta jmiadcgm Ibmdu ptesmnbg to girt authority to vkdM or cancel do prov WAm of g6 node or odor orditraooea of the jurisdiction tuadi not be valid, 7be issuance of a pawA based on pow,apeaiflcadona and adw data don M prevent the WOWS officui" i from dtererd w rngtritin tba cmTectim of Mrs i6 f-;d plans,apedficadaoa and odw data,ar 6om preventing bm3ft ape--- : i-__:,3 tamed an dwamder when m vieiabm of the code or of ees of this jurisdiction. WITWLS: F DATE. 7410 5 CONSTRUCTION DOCUMENTS 1 • _ Archit is JANUARY 18 , 2005 ALL BUILDINGS' SHEET NAME REV. # DATE PROJECT ADDRESS VAIL VALLEY MEDICAL CENTER 181 WEST MEADOW DRIVE 1. THE CONTRACTOR SHALL MAINTAIN THE EXISTING STRUCTURAL AND FIREPR❑❑PING VAIL, COLORADO 81657 INTEGRITY THROUGHOUT THE ENTIRE PROJECT. [APPLICABLE BUILDING CODES 2. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME COMPLETELY FAMILIAR WITH COVER PAGE ALL EXISTING CONDITIONS IN THE AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. 3. COORDINATE THE FOLLOWING WITH THE OWNER AND PROVIDE SCHEDULE 1997 UNIFORM BUILDING CODE INDICATING PROJECT PHASING, UTILITY SHUTDOWNS, SITE ACCESS, TEMPORARY 1997 INTERNATIONAL PLUMBING CODE ARCHITECTURAL UTILITIES. 1998 INTERNATIONAL MECHANICAL CODE AO-0 GENERAL INFORMATION 4. THE CONTRACTOR SHALL CONTACT THE OWNER A MINIMUM OF FOURTEEN DAYS 1999 INTERNATIONAL ELECTRICAL CODE _ Al-0 DEMOLITION PLAN OWNER VAIL VALLEY MEDICAL CENTER PRI❑R TO COMMENCING DEMOLITI❑N TO SCHEDULE WORK. CONTRACTOR SHALL PROVIDE v si HOWARD HEAD PHYSICAL THERAPY NOTICE TO OWNER FOR SCHEDULING UTILITY SHUTDOWNS. ALL UTILITY SHUTDOWNS TO 1997 UNIFORM FIRE CODE A2-0 FLOOR PLAN 181 WEST MEADOW DRIVE., SUITE 100 BE PERFORMED BY OWNER. . Archit is 1997 NFPA 101 LIFE SAFETY CODE A3-0 REFLECTED CEILING PLAN VAIL, COLORADO 81657 5. THE CONTRACTOR SHALL KEEP THE PREMISES FREE FROM ACCUMULATI❑N OF WASTE AMERICANS WITH DISABILITIES ACT GUIDELINES CONTACT; STAN ANDERSON (970) 479-5112 MATERIALS AND DEBRIS THROUGHOUT THE ENTIRE BUILDING AREA AND PROVIDE DUST C BARRIERS AS REQUIRED BY THE HOSPITAL. 6. DIMENSIONS OF AND FROM EXISTING CONDITIONS HAVE BEEN TAKEN FROM EXISTING DRAWINGS AND/OR FIELD MEASUREMENTS. THE CONTRACTOR SHALL FIELD VERIFY ALL ARCHITECT DAVIS PARTNERSHIP, P.C. DIMENSI❑NS PERTAINING TO EXISTING CONDITIONS PRIOR TO THE START OF 0225 MAIN ST., UNIT C101 CONSTRUCTION. OCCUPANCY TYPE AND CONSTRUCTION, EDWARDS, COLORADO 81632 7. DIMENSI❑NS LOCATING NEW CONSTRUCTION ARE TO FACE STUD. (UNLESS NOTED 2301 BLAKE ST.,STE.#100 OCCUPANCY: GROUP 1-, DIVISION 1.1 HOSPITAL (1997 UBC) CONTACT: SCOTT NEVIN, AIA (970) 926-8960 OTHERWISE). DIMENSIONS LOCATING EXISTING CONSTRUCTI❑N ARE FROM EXTERI❑R DENVER,COLORADO 80205 CONSTRUCTION TYPEt I-ONE HOUR NON-COMBUSTABLE FULLY SPRINKLERED CHERYL DORNAK, AIA (970) 926-8960 FINISHED SURFACE. (UNLESS NOTED OTHERWISE). 303.861.8555 F.303.861.3027 ANTHONY RICCA (970) 926-8960 8. CONTRACTOR SHALL PROVIDE SHEET METAL BLOCKING IN WALLS TO RECEIVE ALL ATTACHED EQUIPMENT, PLUMBING FIXTURES, FURNITURE SYSTEMS, ETC. 0225 MAIN STREET. UNIT C101 9. PATCH ALL EXISTING FLOOR, PAVING, WALLS, CEILINGS, AND ROOFS TO MATCH EDWARDS,COLORADO 81632 EXISTING MATERIALS, AND FINISHES WHERE DISTURBED BY CONSTRUCTION. 970.926.8960 F.970.926.8961 10. THE GENERAL CONTRACTOR IS TO COORDINATE ALL WELDING VENTING, AND TIMES OF DEMOLITION AND CONSTRUCTION WITH THE OWNER AND CONCURRENT OCCUPANCY OF THE BUILDING. 11. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO ARCHITECT FOR REVIEW FOR THE FOLLOWING; DOORS, HARDWARE AND FINISHES. 12. MECHANICAL AND ELECTRICAL SHALL BE PERFROMED ON A DESIGN/BUILD BASIS. CONSULTANT NAME CONSULTANT ADDRESS CONSULTANT CITY ISSUE/REVISION DATE NO. fl BUILDING CODE INFORMATION Q) DRAWING INDEX a PARTICIPANTS Q)GENERAL NOTES op 125 DOOR IDENTIFIER j DETAIL IDENTIFIER ,,, ♦i 1 ADJ. ADJUSTABLE HPDL HIGH PRESSURE DECORATIVE LAMINATE A.F.F. ABOVE FINISH FLOOR INSUL. INSULATION GYPSUM BOARD WOOD BLOCKING OFFICE NEW ROOM a� ALUM. ALUMINUM MECH. MECHANICAL CFT. CERAMIC FLOOR TILE MIN. MINIMUM IDENTIFIER CONC. CONCRETE MTL. METAL TYPICAL W NP CONT. CONTINUOUS O.C. ON CENTER CORR. CORRIDOR P. PAINT 3 METAL STUDS WITH 1 LAYER " GYPSUM DETAIL SECTION CPT. CARPET PREV. PREVIOUS BOARD, BOTH SIDES - 1 HOUR FIRE RATED STORAGE 1 P. LAM. PLASTIC LAMINATE (UL DESIGN N0. 465) CONCRETE EXISTING ROOM A� IDENTIFIER CWT. CERAMIC WALL TILE RB. RUBBER BASE y SCOTT MICHAEL a PLYWOOD IDENTIFIER D SP. DISPENSER R.O. ROUGH OPENING 7[ 2029$55 EA. EACH S.F. SQUARE FEET ��[i ) ELEC. ELECTRIC S.S. STAINLESS STEEL INTERIOR BY OWNER ELEV. ELEVATION TD. STANDARD D ARG�\� A1.1 1 ELEVATION EQ. EQUAL STDS. STANDARDS HARD WOOD HARD WOOD REFERENCE EQUIP. EQUIPMENT VENEER PLYWOOD EXT. EXTERIOR STRUCT. STRUCTURE EXIST. EXISTING SUSP, SUSPENDED GA. GAUGE (TYP.) TYPICAL GALV. GALVANIZED TREAT. TREATMENT GYP. BD. GYPSUM BOARD U.N.O. UNLESS NOTED OTHERWISE OWINDOW IDENTIFIER G.C. GENERAL CONTRACTOR VCT. VINYL COMPOSITION TILE n/ LUMBER BATT INSULATION W/ WITH ��■■ WB. WOOD BASE W WD. WOOD F W " DIMENSION LINE Z 4- W R Lo .j (c) ❑ W . � C) 00 TYPICAL MATERIAL DESIGNATIONS. TYPICAL SYMBOL DESIGNATIONS. TYPICAL ABBREVIATIONS. MAY NOT BE USED IN THE DRAWINGS. MAY NOT BE USED IN THE DRAWINGS. MAY NOT BE USED IN THE. DRAWINGS. O � O Q)MATERIALS ❑ (D WALL TYPES SYMBOLS s$ ABBREVIATIONS D W ❑ Q W � Q � WO O 2 —j >- -❑ I- O w U) J p� U J oo Q Mwdow Dr Dr AM OF WORK GENERAL INFORMATION WE F1 L_ DATE 18JAN05 --------� DRAWN BY TR WEST MEADOW DRIVE CHK'D BY SN SHEET FILE AO-O.dwg NOW 2003 BY DAMS PARTNERSHIP P.C.. ARCHiECTS SHEET NUMBER: AO �O Q)VICINITY MAP @KEY PLAN D.P.A. PROJECT# - 05903.00 GENERAL NOTES: 1. PATCH AND REPAIR ANY DAMAGE AT MULLION AND SILL IN OFFICE. 2. EXISTING LIGHT FIXTURES, MECHANICAL DIFFUSERS & FIRE SPRINKLERS TO REMAIN. ADJUST PLACEMENT AS NECESSARY TO FIT INTO NEW GRID. I . ' • - � Archit is 2301 BLAKE ST.,STE.#100 DENVER,COLORADO 80205 303.861.8555 F.303.861.3027 0225 MAIN STREET. UNIT C101 N I EDWARDS,COLORADO 81632 F I L_ES L❑U N G = 970.926.8960 F.970.926.8961 CAST ROOM OFFICES CONSULTANT NAME CONSULTANT ADDRESS CONSULTANT CITY ISSUEIREVISION DATE NO. Li I EXAM EXAM EXAM EXAM �P OFFICE D3 OTT MICHAEL _ NEVIN 7� 202985 D2 DI D ARG���� __-__-= ---- ----- --- DI `----------------------- 1 C❑NF , D2 ROOM �.aC I ST ❑R, EXAM EXAM Z EXAM W J to UW ❑ � co - Q i 0 0 0 02 ❑ ❑ W ❑ Q W � < OC I OFFICE OFFICE D1 w O 20 20 C)W DEMOLITION KEY: � U Dl EXISTING WALL AND BASEBOARD Ct � 1 1 TO BE DEMOLISHED. r , � D3 " Q V D3 OFFICE OFFICE OFFICE r Q ' D2 EXISTING DOOR AND FRAME ' OFFICE TO BE DEMOLISHED. J � , 1 OFFICE ; ; C ' ' D3 EXISTING CARPET, ACOUSTICAL TILE CEILING ' O AND GRID TO BE DEMOLISHED. SAVE EXISTING LIGHT FIXTURES AND MECHANICAL DIFFUSERS 1 1 FOR REUSE. FIRE SPRINKLERS TO REMAIN, REWORK AT NEW GRID AS NECESSARY. DEMOLITION PLAN DEMOLITION LEGEND: INDICATES EXISTING WALL TO REMAIN DATE 18JAN05 - - - - - - - - INDICATES EXISTING WALL TO BE DRAWN BY TR - - - - - - - - REMOVED CHK'D BY SN INDICATES EXISTING DOOR TO REMAIN SHEET FILE A1--O.dwg COPYRIGHT 2003 UY DAMS PARTNERSHIP P.C.. ARCHITECTS s s' INDICATES EXISTING DOOR TO BE / REMOVED SHEET NUMOM: 0 2 4' 8' DEMOLITION PLAN ® INDICATES EXISTING WINDOW TO 1 i/4" = i'-0" REMAIN Al �O SCALE: 1 /40' = 1 '--O" ---------------- INDICATES EXISTING ITEM TO BE REMOVED D.P.A. PROJECT# 05903.00 GENERAL NOTES: 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. 2. ALL NEW WALLS ARE 3 WMETAL STUDS WITH 1 LAYER %" GYPSUM BOARD ON EACH SIDE UNLESS NOTED OTHERWISE. ALIGN FACE OF EXISTING DRYWALL AND NEW DRYWALL AS NECESSARY. VERIFY EXISTING . WALL THICKNESS IN FIELD. CORRIDOR WALL TO EXTEND TO STRUCTURE: v I S, RE: UL DESIGN NO. U465 FOR ASSEMBLY. nershiplArchit tS 3. NEW DOORS 100 & 101 TO BE 4'-0" x 7'-0" x 1 3Y4° WOOD DOORS WITH A 20 MINUTE FIRE RATING LABEL. NEW FRAMES TO BE HOLLOW METAL WITH A 20 MINUTE FIRE RATING LABEL. PROVIDE HARDWARE AS SPECIFIED IN COLORADO DOORWAYS QUOTATION NO. 37819. 4. PROVIDE NEW CARPET IN EXAM ROOM AND OFFICE. PROTECT EXISTING CORRIDOR CARPET TO REMAIN. REPLACE CORRIDOR CARPET IF 2301 BLAKE ST.,STE.#100 DAMAGED DURING CONSTRUCTION. DENVER,COLORADO 80205 303.861.8555 F.303.861.3027 5. PAINT ENTIRE EXAM ROOM, OFFICE AND CORRIDOR WALLS TO MATCH 0225 MAIN STREET.UNIT C101 EXISTING FINISHES. ADHERE TO HOSPITAL STANDARDS. EDWARDS,COLORADO 81632 6. REPLACE BASE IN EXAM ROOM AND OFFICE ON WALLS 970.926.8960 F.970.926.8961 PERPENDICULAR TO DEMOLISHED WALL. PATCH BASE AT CORRIDOR SIDE. NEW BASE TO MATCH EXISTING. IF NEW BASEBOARD TO MATCH THE FILES LOUNGE EXISTING CANNOT BE FOUND, REPLACE ALL BASE IN EXAM ROOM AND OFFICE AND THE ENTIRE LENGTH OF THE CORRIDOR WALL. CAST ROOM OFF I C E S CONSULTANT NAME CONSULTANT ADDRESS CONSULTANT CITY ISSUE/REVISION DATE NO. IT- Li �f O SCO MICHAEL EXAM EXAM EXAM NEVIN OFF I CE F� <-,, 202985 crys�D ARG�'��� 101 EXAM � CNF, W W ROOM ~ ST❑R. EXAM EXAM Z —' Lo w (.0 z V W ❑ r 0 Q Q J ❑ 00 Q O 00 4 71 I�aM ❑ W Q Q W 0 ,�-�" - 0 0 OFF I CE OFF- I CE ALIGN � 0 F- O W J u) U J Q W � ALIGN 100 Q U > Q j co OFFICE OFFICE OFFICE OFFICE I I FLOOR PLAN PLAN LEGEND: INDICATES EXSITING WALL DATE 18JAN05 INDICATES NEW WALL DRAWN BY TR INDICATES EXSITING DOOR CHK'D BY SN SHEET FILE I A2--O.dwg INDICATES NEW DOOR COPYRIGHT 2003 BY DAMS PARTNERSHIP P.C., ARCHITECTS SHEET NUMBER: 0 2' 4' 8' INDICATES EXSITING WINDOW FLOOR PLAN 1 1/4" - V-0" m 0 . mm" INDICATES NEW WINDOW A2 �O SCALE: 1/4" = V-0" D.P.A. PROJECT# 05903.00 REFLECTED CEILING PLAN NOTES: 1. FIXTURE SIZES AND LOCATIONS ARE SCHEMATIC. EXISTING FIXTURES AND MECHANICAL DIFFUSERS TO BE REUSED. VERIFY SIZES AND LOCATIONS IN FIELD. 2. CENTER CEILING GRID IN ROOM. NEW CEILING TILES TO MATCH vis EXISTING TILES PER HOSPITAL STANDARDS. - ' • - � Archit is LEI 2301 BLAKE ST.,STE.#100 DENVER,COLORADO 80205 303.861.8555 F.303.861.3027 0225 MAIN STREET. UNIT C101 EDWARDS,COLORADO 81632 T L E S LO' f�r� 970.926.8960 F.970.926.8961 CAST ROOM OFFICES CONSULTANT NAME CONSULTANT ADDRESS CONSULTANT CITY ISSUE/REVISION DATE NO. Li o EXAM EXAM EXAM o lJ� sCO MICHAEL OFFICE NEVIN 7k o ri A, 202985 c EXAM FD ARC C❑ NF . R❑ ❑M p oc w w I STER , EXAM EXAM I - Z > n W p - (D U w ❑ r. I j ❑ co Q � o ° V ❑ � I o w � Q w � Qw f OFFICE OFFICE W o � o � j w � o � U) c� t o o -1Q w �j i - QU I OFFICE OFF ICE OFFICE > d ❑F I E > I co I REFLECTED CEILING PLAN LEGEND Q r 0 0 � INDICATES EXISTING WALL INDICATES NEW WALL INDICATES NEW DOOR REFLECTED ® INDICATES EXISTING WINDOW CEILING PLAN INDICATES 2'X2' CEILING GRID WITH ACOUSTICAL CEILING TILE DATE 18JAN05 DRAWN BY TR INDICATES 2x4 RECESSED FLUORESCENT FIXTURE CHK'D BY SN INDICATES 2x2 RECESSED FLUORESCENT FIXTURE SHEET FILE I A3-O.dwg O COPYRIGHT 2003 BY DAMS PARTNERSHIP P.C., ARCHRECTS 0 2' 4' 8' o INDICATES DOWN LIGHT SHEET NUMBER: REFLECTED CEILING PLAN 1,4" - 1'-o- �-o !ND-CA LS NE=W W,',L! SCHNCr SCALE: 1 /4" = 1 '-0" I N J)I C L S L Xl: I S 111 N A3 �O D.P.A. PROJECT# 05903.00 SECTION 15010 1. INSULATED PIPING: COMPLY WITH THE FOLLOWING INSTALLATION REQUIREMENTS. 3.1 INSTALLATION: B. ELECTRICAL WIRING: INSTALL ELECTRICAL DEVICES FURNISHED BY MANUFACTURER GENERAL PROVISIONS BUT NOT SPECIFIED TO HE FACTORY-MOUNTED. FURNISH COPY OF MANUFACTURER'S 2 SHIELDS_PROVIDE PROTECTIVE SHEET SHIELDS,MSS TYPE 40 ON COLD PIPING T A GENERA.: INSTALL CONDENSING UNITS N ACCORDANCE WITH MANUFACTURERS WIRING DIAGRAM SUBA67TAL 70 ELECTRICAL INSTALLER AND LESS. SHIELDS SHALL SPAN AN ARC OF 180 DEGREES AND SHALL BE MINIMUM INSTALLATION INSTRUCTIONS. INSTALL UNITS PLUMB AND LEVEL,FIRMLY ANCHORED N 1.1 GENERAL: S'LONG. LOCATIONS INDICATED.AND MAINTAIN MANUFACTURERS RECOMMENDED CLEARANCES, 33 FIELD QUALITY CONTROL' Ulu A ALL BIDDERS SHALL BECOME FAMILIAR WITH SITE CONDITIONS PRIOR TO SUBMITTING 3. INSULATION INSERTS:PROVIDE CALCIUM SILICATE INSERT B. INSTALL ROOFOMOUNTED UNITS ON EQUIPMENT SUPPORTS ON ROOF CURBS WITH A GENERAL: START-UP COMPUTER ROOM AIR CONDITIONING UNITS,WITH BIDS. ENCASED WITH A VAPOR BARRIER AND A SHEET METAL SHIELD FOR COLD PIPING WATER PROOF FLASHING. ANCHOR UNIT TO SUPPORTS WITH REMOVABLE FASTENERS. MANUFACTURER'S START-UP INSTRUCTIONS. TEST CONTROLS AND DEMONSTRATE 2-10 AND LARGER. COMPLIANCE WITH REQUIREMENTS. REPLACE DAMAGED OR MALFUNCTIONING B. ALL WORK SHALL BE EXECUTED N ACCORDANCE WITH LOCAL AND STATE CODES. C. AEROCOOLED CONDENSING UNITS: CONNECT REFRIGERANT PIPING TO UNIT;MAINTAIN CONTROLS AND EQUIPMENT. •'f B. ALL DUCT HANGERS SHALL BE SHEET METAL STRAP OR ANGLE IRON N COMPLIANCE REQUIRED ACCESS TO UNIT. V • C. EQUIPMENT SCHEDULES ESTABLISH A QUALJTY AND DESIGN STANDARD. SUBSTITUTIONS WITH SMACNA GUIDELINES, MUST BE EQUIVALENT N PERFORMANCE,MATERIAL,SPACE,AND CONFIGURATION 1. INSTALL FURNISHED FIELD❑MOUNTED ARIES. END OF SECTION 15787 REQUIREMENTS. THE PROJECT ENGINEER OR ARCHITECTS DECISION WILL BE FINAL a S 1 AND MAY BE BASED ON BOTH CERTIFIED TEST DATA AND SUBJECTIVE REASONING. FIND OF SECTION 32 FIELD QUALITY CONTROL: SECTION 15830 e° 12 EXAMINATION OF BIDDING DOCUMENTS: A CHARGE SYSTEMS WILL FULL CHARGE OF REFRIGERANT AND OIL,AND TEST FOR LEAKS. �. SECTION 15250 REPAIR LEAKS AND REPLACE LOST REFRIGERANT AND OIL. TERMINAL UNITS A EXAMINE THE BIDDING DOCUMENTS CAREFULLY,NOT LATER THAN SEVEN DAYS PRIOR TO THE DATE OF RECEIPT OF BIDS. WRITTEN REQUEST FOR INTERPRETATIONS OR INSULATION 1. INSTALL CORE IN FILTER DRYER AFTER LEAK TEST,BUT BEFORE EVACUATION. PART 1 GENERAL CORRECTIONS OF ANY PERCEIVED DISCREPANCIES,AMBIGUITIES,INCONSISTENCIES.OR DRAWING TITLE ERRORS DISCOVERED SHALL BE SUBMITTED TO THE ARCHITECT. ANY INTERPRETATION 2. EVACUATE REFRIGERANT SYSTEM WITH VACUUM PUMP UNTIL 35 DEGREES F IS 1.1 DESCRIPTION OF WORK OR CORRECTION WILL BE ISSUED AS AN ADDENDUM BY THE ARCHITECT. ONLY A 1.1 PIPING INSULATION INDICATED ON VACUUM DEHYDRATION GAUGE. WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING- NO A. EXTENT OF TERMINAL UNIT WORK IS INDICATED ON DRAWINGS AND SCHEDULES,AND BY BIDDER SHALL RELY UPON INTERPRETATIONS OR CORRECTIONS GIVEN BY ANY OTHER A FIBERGLASS PIPING INSULATION:ASTM C547.CLASS 1. W FACTOR SHALL BE MAXI IUM REQUIREMENTS OF THIS SECTION. METHOD. IF DISCREPANCIES,AMBIGUITIES.INCONSISTENCIES,OR ERRORS ARE NOT 024 AT 750F.AND ALL PURPOSE JACKETING,ASTM C921 UNLESS SPECIFIED OTHERWISE END OF SECTION 15670 COVERED BY ADDENDUM OR WRITTEN DIRECTIVE.INCLUDE N THE BID LABOR, AND HAVE RATINGS OF 25 OR LESS FLAME SPREAD AND 50 OR LESS SMOKE B. TYPES OF TERMINAL UNITS REQUIRED FOR PROJECT INCLUDE THE FOLLOWING: MATERIALS,AND METHODS OF CONSTRUCTION RESULTING N HIGHER COST. AFTER DEVELOPMENT. AWARD OF CONTRACT,NO ALLOWANCE OR EXTRA COMPENSATION WILL BE MADE DUE SECTION 15787 1. FAN❑COIL UNITS. TO FAILURE OF MAKING THE WRITTEN REQUESTS AS DESCRIBED ABOVE. B. PIPING INSULATION APPLICATION AIR COOLED COMPUTER ROOM AIR CONDITIONING(NITS 1.2 SUBMITTALS: B. BE RESPONSIBLE FOR ITS PROMPT DELIVER OF REQUEST. FAILURE TO SO REQUEST 1. REFRIGERANT SUCTION PIPING-1'THICK FOR PPE SAES P AND LESS,140 THICK CLARIFICATION OF ANY INADEQUACY.OMISSION.OR CONFLICT WILL NOT RELIEVE FOR PIPE SIZES OVER V. PART 1 GENERAL A PRODUCT DATA: SUBMIT MANUFACTURERS TECHNICAL PRODUCT DATA,FOR TERMINAL RESPONSIBILITY OF DOING SO. THE SIGNING OF THE CONTRACT WILL BE CONSIDERED UNITS SHOVING DIMENSIONS.CAPACITIES,RATINGS,PERFORMANCE CHARACTERISTICS.e AS IMPLICITLY DENOTING A THROUGH COMPREHENSION OF THE FULL INTENT AND 1.1 DESCRIPTION OF WORK GAUGES AND FINISHES OF MATERIALS,AND INSTALLATION-STARTUP INSTRUCTIONS. SCOPE OF THE WORKING DRAWINGS AND SPECIFICATIONS. SIGNING OF THE CONTRACT END OF SECTION O INDICATES AGREEMENT TO ALL OF THE CONDITIONS IN THIS SPECFICAITON. A TYPES OF COMPUTER ROOM AIR CONDITIONING UNITS SPECIFIED N THIS SECTION B. MAINTENANCE DATA: SUBMIT MAINTENANCE INSTRUCTIONS,INCLUDING LUBRICATION INCLUDE THE FOLLOWING: INSTRUCTIONS,FILTER REPLACEMENT,MOTOR AND DRIVE REPLACEMENT.CONTROL, 13 MECHANICAL INSTALLATIONS: ACCESSORIES.'TROUBLE-SHOOTING'MAINTENANCE GUIDE.AND SPARE PARTS LISTS. 1. AIR COOLED COMPUTER ROOM UNITS. INCLUDE THIS(DATA,PRODUCT DATA,AND SHOP DRAWINGS IN MAINTENANCE MANUALS; 0 A DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE SECTION 15670 IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. EVERY REQUIRED OFFSET.VALVE,FITTING.ETC 12 SUBMITTALS: PART 2 PRODUCTS B. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR 70 COMMENCEMENT OF CONDENSING UNITS A PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA,INCLUDING RATED CAPACITIES OF SELECTED MODEL CLEARLY NDU`,ATED,WEIGHTS,FURNISHED 2.1 MANUFACTURERS: WORK. REFER TO ARCHITECTURAL DRAWINGS FORALL DIMENSIONS PART 1 GENERAL SPECIALTIES.ACCESSORIES,AND INSTALLATION AND STARTOUP INSTRUCTIONS. C. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS CALLED FOR N 1.1 QE3CRIPTION OF VApOIRIG A MANUFACTURER: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,PROVIDE PRODUCTS o EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH. B. MAINTENANCE DATA: SUBMIT MAINTENANCE DATA AND PARTS LIST FOR EACH BY ONE OF THE FOLLOWING: � M A SECTION INCLUDES: COMPUTER ROOM AIR CONDITIONING UNIT,CONTROL.AND ACCESSORY;INCLUDING D. BEFORE ANY WORK I$INSTALLED,DETERMINE THAT EQUIPMENT WILL PROPERLY FIT THE "TROUBLE❑SHOOTING MAINTENANCE GUIDE. NCL.UDE THIS DATA AND PRODUCT DATA 1. FAN COIL UNITS M SPACE;THAT REQUIRED PIPING GRADES CAN BE MAINTAINED AND THAT DUCTWORK CAN 1. AIROCOOLED CONDENSING UNITS. IN MAINTENANCE MANUAL IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. BE RUN AS CONTEMPLATED WITHOUT INTERFERENCES BETWEEN SYSTEMS.WITH a. CORP. RM MFG.CO. N STRUCTURAL ELEMENTS OR WITH THE WORK OF OTHER TRADES. 1.2 REFRIGERANTS: 13 SPECIAL PROJECT WARRANTY: b. CORP. Z M C. DUNHAM-BUSH,INC. E. COORDINATE THE INSTALLATION OF MECHANICAL MATERIALS AND EQUIPMENT WITH ALL A ALL REFRIGERANTS USED FOR EACH CONDENSING UNIT SHALL BE ON THE LATEST EPA A. WARRANTY ON PROVIDE WRITTEN WARRANTY,SIGNED BY d. MCQUAY INC. v TRADES. LIST OF APPROVED REFRIGERANTS&ENVIRONMENTALLY FRIENDLY. MANUFACTURER,AGREEING TO REPLACEUREPAIR,WITHIN WARRANTY PERIOD, e. TRANE MOT ORSACOMPRESSORS WITH INADEQUATE AND DEFECTIVE MATERIALS AND f. YORK;DIV.OF YORK INTERNATIONAL F. COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO B. NO CFC BASED REFRIGERANTS SHALL BE USED. WORKMANSHIP.INCLUDING LEAKAGE.BREAKAGE,IMPROPER ASSEMBLY.OR FAILURE TO g. INTERNATIONAL FAN COIL V ACCOMMODATE THE INSTALLATION OF MECHANICAL EQUIPMENT AND MATERIALS. PERFORM AS REQUIRED;PROVIDED MANUFACTURERS INSTRUCTIONS FOR HANDLING. W O 1.3 SUBMITTALS: INSTALLING,PROTECTING.AND MAINTAINING UNITS HAVE BEEN ADHERED TO DURING 22 FAN❑COIL UNITS- N G. INSTALL MECHANICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAR OR WARRANTY PERIOD_ REPLACEMENT IS LIMITED TO COMPONENT REPLACEMENT ONLY, REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL,CONNECT A. PRODUCT DATA: SUBMIT MANUFACTURERS TECHNICAL PRODUCT DATA,64CLWING AND DOES NOT INCLUDE LABOR FOR REMOVAL AND EREINSTAI1A710N A GENERAL: PROVIDE FANOCOIL UNITS HAVING CABINET SIZES,AND IN LOCATIONS �0 EQUIPMENT FOR EASE OF DISCONNECTING.WITH MINIMUM OF INTERFERENCE=WITH RATED CAPACITIES OF SELECTED MODEL CLEARLY INDICATED.WEIGHTS(SHIPPING, INDICATED,AND OF CAPACITIES.STYLE,AND HAVING ACCESSORIES AS SCHEDULED. TITLE N OTHER INSTALLATIONS. INSTALLED,AND OPERATING),DI4ENSIONS,REQUIRED CLEARANCES,AND METH R.METHODS OF 1. WARRANTY PERIOD: 5 YEARS FROM DATE OF ACCEPTANCE BY THE OWNER INCLUDE IN BASIC UNIT CHASSIS,COILS,FANBOARD.DRAIN PAN ASSEMBLY,FANS, ASSEMBLY OF COMPONENTS,FURNISHED SPECIALTIES AND ACCESSORIES:AND HOUSING,MOTOR,FILTER.AND INSULATION. M H. CONTRACTOR SHALL.BE RESPONSIBLE FOR ALL FEES AND PERMITS. INSTALLATION MID START❑UP INSTRUCTIONS. PART 2 PRODUCTS .oM. B. CHASSIS: CONSTRUCT CHASSIS OF GALVANIZED STEEL WITH FLANGED EDGES. I A REMODEL PROJECTS: B. OPERATION AND MAINTENANCE DATA SUBMIT MAINTENANCE DATA AND PARTS LIST FOR 2.1 MANUFACTURERS: EACH CONDENSING UNLIT,CONTROL,AND ACCESSORY;INCLUDING-TROUBLE SHOOTING' C. INSULATION: FACED.HEAVY DENSITY GLASS FIBER. � A IN AS MUCH AS DESIGN FOR REMODEL ANDIOR REHABILITATION REQUIRES THAT MAINTENANCE GUIDE;PLUS SERVICING,AND PREVENTATIVE MAINTENANCE A. MANUFACTURERS: SUBJECT TO COMPLAWCE WITH REQUIREMEIMTS.PROVIDE � � CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS.AND BECAUSE PROCEDURES AND SCHEDULE. INCLUDE THIS DATA AND PRODUCT DATA N PRODUCTS OF ONE OF THE FOLLOWING: D. CABINET: CONSTRUCT OF 18 0GA STEEL REMOVABLE PANELS,16 0GA FRONT.PROVIDE d SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING MAINTENANCE MANUAL;IN ACCORDANCE WITH REQUIREMENTS OF DIVISION 15. INSULATION OVER ENTIRE COIL SECTION. CLEAN CABINET PARTS,BONDER, OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING.THE ENGINEER 1. INDOOR PACKAGED UNITS: PHOSPHATIZE,AND FLOW❑COAT WITH BAKED❑ON PRIMER.CUSTOM COLOR AS h CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL SELECTED BY ARCHITECT IN BAKED ENAMEL FINISH. CONSULTING SERVICES HEREIN ENCOMPASS AI_CONTINGENCIES. HELD COORDINATION 1�4 SPECIAL PROJECT WARRANTY. e LIEBERT DURING CONSTRUCTION IS IMPERATIVE. MAKE REASONABLE ALLOWANCES FOR UNSEEN A. WARRANTY ON MOTORICOMPRESSOR: PROVIDE WRITTEN WARRANTY,SIGNED BY b. AIRFLOW GO. E. DRAIN PANS: CONSTRUCT OF GALVANIZED STEEL. INSULATE WITH POLYSTYRENE OR CONDITIONS. MANUFACTURER,AGREEING TO REPLACEIREPAIR,WITHIN WARRANTY PERIOD. POLYURETHANE INSULATION. PROVIDE BRAN CONNECTION. p MOTO WITH INADEQUATE OR DEFECTIVE MATERIALS AND 2.2 COMPUTER ROOM AR CONDITIONING UNITS:- 0 B. THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTFAICTION. WORKMANSHIP,INCLUDING LEAKAGE.BREW-AGE,IMPROPER ASSEMBLY,OR FAILURE TO F. FANS: PROVIDE CENTRIFUGAL FORWARD CURVED DOUBLE WIDTH WHEELS OF U CONTINUED OPERATION OF THE FACILITY SHALL NOT 13E HINDERED BY THIS WORK PERFORM AS REQUIRED;PROVIDED MANUFACTURERS INSTRUCTIONS FOR HANDLING, A GENERAL: PROVIDE FACTORYDASSEMBLED AND TESTED AIR COOLED PACKAGED UNITS REINFORCED FIBERGLASS.IN GALVANIZED STEEL FAN SCROLLS. � � o0 ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED DUE TO THE INSTALLING,PROTECTING,AND MAINTAINING UNITS HAVE 13EEN ADHERED TO DURING AS SPECIFIED ISCHEOULED,CONSETING OF CASING.CONDENSATE PUMP,LIQUID D.X.A G. MOTORS: PROVIDE MOTORS WITH INTEGRAL THERMAL OVERLOAD PROTECTION.RUN W DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES.FURNITURE,EQUIPMENT. WARRANTY PERIOD. REPLACEMENT IS LIMITED TO COMPONENT REPLACEMENT ONLY, FRAME TYPE COOLING COIL,AIR COOLED CONDENSER WITH FAN SPEED CONTROL TEST MOTORS I FACTORY IN ASSEMBLED UNIT PRIOR TO SHIPPING.PROVIDE QUICKLY UN ETC:AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE ACCESSIBLE AND DOES NOT INCLUDE LABOR FOR REMOVAL AND REINSTALLATION. WHEN COMPILING HIS BID. LEE-TEMPIMM ER CONTROL SYSTEM.FAN,COMPRESSORS,FILTERS.ELECTRIC REHEAT DETACHABLE MOTOR CORDS. 1. EXTENDED WARRANTY PERIOD: 5 YEARS FROM DATE OF SUBSTANTIAL COIL,INFRARED WITH AUTOFLUSH SYSTEM HUMIDIFIER DISCONNECT SWITCHES)AND Z g C. BE RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT OR DUCTWORK REMAINING TO COMPLETION. CONTROLS. PROVIDE CAPACITIES AND ELECTRICAL CHARACTERISTICS AS SCHEDULED- H. FILTERS: PROVIDE FILTERS AS SCHEDULED. N BE RECONNECTED TO NEW OR EXISTING SYSTEMS, PROVIDE DUCTWORK,PIPING, B. CASING: PROVIDE MANUFACTURERS STANDARD CASING CONSTRUCTION.CORROSION � 0 m CONTROLS,DIFFUSERS,ETC.,AS REQUIRED TO RESTORE CONTINUITY OF SYSTEMS(St PART 2 PRODUCTS PROTECTION COATING,AND EXTERIOR FINISH. PROVIDE REMOVABLE PANELS WITH 1"- 1. DAMPERS: PROVIDE 18-GA STEEL DAMPER BLADES WITH POLYURETHANE STOP ACROSS � OR M MAKE NEW WORK MEET EXISTING CONDITIONS.WHETHER INDICATED OR NOT. 2.1 MANUFACTURERS: 1-1A2 LBS DENSITY FIBER INSULATION AND CONCEALED FASTENERS FOR SERVICE AND ENTIRE BLADE LENGTH. PROVIDE FACTORY-MOUNTED ELECTRIC OPERATORS FOR Z$% ACCESS TO INTERNAL PARTS. UNIT SHALL BE DOWNFLOW ARRANGEMENT WITH RETURN OPEN CYCLE D. PROVIDE MECHANICAL DEMOLITION REQUIRED. REFER TO ARCHITECTURAL DEMOLITION AR IN BOTTOM FRONT AND SUPPLY AIR OUT BOTTOM OF UNIT. J. ACCESSORIES: PROVIDE THE FOLLOWING ACCESSORIES AS MICAIED LINEAR DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED. VISIT SITE PRIOR TO A MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,PROVIDE SCHEDULED: ¢ tI BID TO DETERMINE EXTENT OF WORK INVOLVED- EXISTING FIXTURES.MECHANICAL PRODUCTS Elf ONE OF THE FOLLOWING: C. AIR COOLED CONDENSER THE AIR COOLED CONDENSER SHALL BE THE LOW PROFILE, EQUPMENT,ETC.BEING REMOVED SHALL BE RETURNED TO THE OWNER DISPOSE OF SLOW SPEED,AND MULTIPLE DIRECT DRIVE PROP81M*AN TYPE. THE CONDENSER 1 U O ALL REMOVED PIPING,DUCTWORK,ETC.UNLESS NOTED OTHERWISE. 1. AIR-COOLED CONDENSING UNITS- SHALL HAVE TWO SEPARATE REFRIGERATION CIRCUITS RATED AT 0 DEG F.AMBIENT E. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO CONIM1 NCNG WORK. a. MCQUAY AIR CONDITIONING GROUP;MCQUAY INC. THE CONDENSER SHALL BE CONSTRUCTED OF ALUMINUM AND CONTAIN A COPPER TUBE, 2. INSULATED DISCHARGE PLENUM WIDISCHARRGE GRILLE 0 0 UTILIZE X-RAY AND VISUAL INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED b. TRANE(THE)CO;DN AMERICAN STANDARD INC. ALUMNDNUM FIN COIL ARRANGED FOR VERTICAL AIR DISCHARGE. THE WINTER CONTROL O PRIOR TO DRILLING OR CUTTING. C. YORK DN OF YORK INTERNATIONAL STEM FOR THE NR COOLED CONDENSER SHALL BE LEE-TEMP AHS SHALL ALLOW 3. MICROPROCESSOR CONTROLLER W .- START-UP AND POSITIVE HEAD PRESSURE CONTROL WITH AMBIENT TEMPERATURE AT 1.5 MECHANICAL.SUBMITTALS: -S0 DEG F- THE PACKAGE SHALL INCLUDE,FOR EACH CIRCUIT,FACTORY INSULATED 4. NON-LOCKING ELECTRICAL DISCONNECT RECEIVERS.PRESSURE RELIEF VALVES.HEAD PRESSURE THREE-WAY CONTROL VALVES A THE MANUFACTURER'S MATERIAL OR EQUIPMENT LISTED IN THE SCHEDULE OR AND ROTO LOCK VALVES FOR ISOLATING THE REFRIGERANT CHARGE. RECEIVERS SHALL 5. ELECTRIC REHEAT IDENTIFIED BY NAME ON THE DRAWINGS ARE THE TYPES TO BE PROVIDED FOR THE 22 AR❑COOLED CONDENSING UNITS: BE FACTORY M HE HEATER READY FOR FIELD CONNECTION TO THE AIR COOLED ESTABLISHMENT OF SIZE,CAPACITY.GRADE AND QUALITY. IF ALTERNATES ARE USED N CONDENSER THE HEATER SHALL REQUIRE SEPARATE POWER SUPPLY. PROVIDE A li. CONDENAAl1=PUMP LIEU OF TINE SCHEDUL D7 NAMES,THE COST OF ANY CHAINGES N CONSTRUCTION FACTORY MOUNTED AND WIRED DRERIOR �I SWITCH FOR CONDENSER CONTROL Uj < REQUIRED BY THEIR USE SHALL BE BORNE BY CONTRACTOR. A GENERAL: FACTORY❑ASSEE4BLED AND TESTED AFROCOOLED CONDENSING UNITS, PANEL ACCESSIBLE FROM THE EXTERIOR PART 3 EXECUTION J CONSISTING OF CASING.COMFWASORS,CONDENSERS,COLS,CONDENSING COI. D. COMPRESSOR THE COMPRESSORS SHALL BE HERMETIC TYPE LOCATED N A SEPARATE 3.1 INSPECTION: ,,,J Z B. BEFORE STARTING WOIBC,PREPARE AND SUI3IIAIT TO THE ARC ITECTIENCINEER SHOP GUARD.CONDENSER FANS AND MOTORS,AND UNIT CONTROLS. COMPARTMENT WITH CRANKCASE HEATER,VIBRATION ISOLATORS,THERMAL 0 DRAWINGS AND DESCRIPTIVE DATA FOR ALL MECHANICAL EQUIPMENT AND MATERIALS OVERLOADS.OIL SIGHT GLASS,MANUAL RESET HIGH AND LOW PRESSURE SWITCHES A. EXAMINE AREAS AND CONDITIONS UNDER WHICH TERMINAL UNITS ARE TO BE INSTALLED. REQUIRED FOR THE PROJECT. 1. UNIT CASINGS: DESIGNED FOR OUTDOOR INSTALLATION AND COMPLETE WITH AND MAXIMUM OPERATING SPEED OF 1750 RPM. REFRIGERATION CIRCUIT SHALL DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN WEATHER PROTECTION FOR COMPONIEM AND CONTROLS,AND COMPLETE WITH INCLUDE REFRIW IT SIGHT GLASS WITH MOISTURE INDICATOR,ADJUSTABLE CORRECTED IN MANNER ACCEPTABLE TO INSTALLER U 1.6 RECORD DOCUMENTS: REMOVABLE PANELS FOR REQUIRED ACCESS TO COMPRESSORS,CONTROLS, EXTERNALLY EQUALIZED EXPANSION VALVE AND DISCHARGE SERVICE VALVE. CONDENSER FANS,MOTORS.AND DRIVES. 3.2 INSTALLATION OF FAN❑COIL UNITS: J A CONTRACTOR SHALL KEEP A COMPLETE SET OF RED-LINED RECORD DOCUMENT PRINTS E. FILTERS: PROVIDE FILTERS AS SCHEDULED. IN CUSTODY DURING ENTIRE PERIOD OF CONSTRUCTION AT THE CONSTRUCTION SITE B. �R. RECIPROCATING HERMETICOTYPE COMPRESSOR,1,750 RPM,DESIGNED A. GENERAL: INSTALL FANOCOIL UNITS AS INDICATED,AND IN ACCORDANCE WITH ONE(1)SET OF RECORD DOCUMENTS SHALL BE PROVIDED TO THE ENGINEER FOR AIRUCOOLED CONDENSING.COMPLETE WITH CRANK CASE SIGHT GLASS, F. HUMIDIFIER: THE HUMIDIFIER SHALL BE OF THE INFRARED TYPE CONSISTING OF HIGH MANUFACTURER'S INSTALLATION INSTRUCTIONS. INDICATING FINAL PROJECT CONDITIONS AFTER COMPLETION OF WORK CRANKCASE HEATER,AND BACKSEATNG SERVICE ACCESS VALVES ON SUCTION AND INTENSITY QUARTZ LAMPS MOUNTED HIGH AND OUT OF THE WATER SUPPLY. THE DISCHARGE PORTS. CAPACITY SHALL BE CONTROLLED THROUGH CYLINDER UNLOADING. EVAPORATOR PAN SHALL BE STAINLESS STE=EL AND ARRANGED TO BE SERVICEABLE B. LOCATE FAN❑COIL UNITS AS INDICATED.COORDINATE WITH OTHER TRADES TO ASSURE 1-7 OPERATION AND MAINTENANCE DATA CORRECT RECESS S�FOR RECESSED UNITS. C. CONTROLS OPERATIC AND SAFETY CONTROLS SHALL INCLUDE IHI[TFi AND LOW WITHOUT DISCONNECTING HIGH VOLTAGE ELECTRICAL.CONNECTIONS. THE COMPLETE HUMIDIFIER SECTION SHALL BE FURNISHED PREMED BY THE FACTORY READY FOR A CONTRACTOR SHALL PREPARE TWO(2)SETS OF MAINTENANCE MANUALS AND SHALL PRESSURE CUTOUTS.OIL PRESSURE CUTOUT,COMPRESSOR VYIVDIVG THERMOSTAT C_ PROVIDE PIPING AS DETAILED ON THE DRAWINGS. FINAL CONNECTION.THE INFRARED HUMIDIFICATION SYSTEM SHALL UTILIZE BYPASS AIR INSTRUCT OWNER ON OPERATION OF SYSTEMS_ MAINTENANCE MANUALS SHALL CUTOUT,3 0LEG COMPRESSOR OVERLOAD PROTECTION.AND CONDENSER FAN MOTORS TO PREVENT OVER-HUMIDIFICATION OF THE COMPUTER ROOM. HUMIDIFIER SHALL BE E INCLUDE ALL MECHANICAL WARRANTIES. WITH THERMAL AND OVERLOAD CUTOUTS. CONTROL TRANSFORMER F REQUIRED EQUIPPED WITH AN AUTOMATIC WATER SUPPLY SYSTEM. THE SYSTEM MONITORS AND D. PROVIDE 3A4'CONDENSATE DRAIN PIPE FROM UNIT DRAIN PAN CONNECTION TO f SHALL BE 115❑VOLTS. PROVIDE MAGNETIC CONTACTORS FOR COMPRESSOR AND NEAREST ADEQUATE FLOOR DRAIN OR DRAIN PIPE. B. THE TESTING AND BALANCING REPORT SHALL BE SUBMITTED AND RECEIVED BY THE CONDENSER FAN MOTORS_ CONTROLS WATER LEVEL AND HAS AN ADJUSTABLE WATER OVERFEED TO PREVENT ENGINEER AT LEAST FIFTEEN CALENDAR DAYS PRIOR TO THE REQUEST MINERAL THE EVE PRECIPITATION. R SHALL ACTIVATE A VISUAL ALARM AND TAKE CORRECTIVE E. PROTECT UNITS WITH PROTECTIVE COVERS DURING BALANCE OF CONSTRUCTION. 12 2006 FOR FINAL OBSERVATION TIME FRAME REQUIREMENTS,AND SHALL BE INCLUDED IN THE D. CONDENSING SECTION: CONDENSER COL SHALL BE SEAMLESS COPPER TUBING ACTION IN THE EVENT OF HIGH OR LOW HUMIDIFIER WATER LEVEL O 6 M MANUAL MECHANICALLY BONDED TO HEAVYaDUTY,CONFIGURATED ALUMINUM FNS.WITH PART 3 EXECUTION: F VA I L SEPARATE AND INDEPENDENT REFRIGERATION CIRCUIT FOR EACH COMPRESSOR. UNITS END OF SECTION 15830 OWN SHALL INCLUDE LIQUID ACCUMULATOR AND SUBCOOLNG CIRCUIT.AND BACKSEATTNG 3.1 INSPECTION: END OF SECTION LIQUID LINE SERVICE ACCESS VALVE.CONDENSER COILS SHALL TIE FACTORY❑TESTED AT 450 PSIG,VACUUM DEHYDRATE.AND FILLED WITH A HOLDING CHARGE OF NITROGEN. A GENERAL: EXAMINE AREAS AND CONDITIONS UNDER WHICH COMPUTER ROOM AIR E. CONDENSER FANS AND ERNES: PROPELLER❑TYPE CONDENSER FANS FOR VERTICAL CONDITIONING UNITS ARE TO BE INSTALLED. DO NOT PROCEED WITH WORK UNTIL APPROVED UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED N MANNER ACCEPTABLE TO SECTION 15140 AIR DISCHARGE;EITHER DIRECT DRIVE OR BELT DRIVE E INSTALLER, Il� Community evelop SUPPORTS.ANCHORS AND SEALS [UBl1 p1lifin ' Building Safety and Inspectloc�lO Se T Vaf 1 F. LOW AWIBIENT HEAD PRESSURE CONTROL: FACTORY❑INSTALLEb LOW AMABLTIT DAMPER 32 INSTAILATKON OF COMPUTER ROOM AIR CONDI110NING UNITS: r►�r yQ -29-d6 ASSEMBLY,FAN SPEED CONTROL,OR FAN CYCLING CONTROL FOR OPERATION DOWN TO US-Imo,l f -0 DEGREES F. A GENERAL: INSTALL COMPUTER ROOM AIR CONDITIONING UNITS N ACCORDANCE WITH IhG� OFFI 1.1 GENERAL MANUFACTURERS INSTALLATION INSTRUCTIONS. INSTALL UNITS PLUMB AND LEVEL, Cade Validity of rm gBr of a pet!1 shall B IDLY PART 3 EXECUTION FIRMLY ANCHORED INS INDICATED.AND MIAIt+fIA*1 MANUFACTURERS a p,,*fW �,a my permit lion of A ALL PPE HANGERS SHALL BE THREADED ROD VAflT'H CLJEVIS OR TRAPEZE SUPPORTS. not be construed to be a CHECKED BY. any of the provisions of this Code or of wV other ordinance of the JOB NO: 2006-053 jurisdiction. Permits prasuming to give auttlority to vWate or cancel the Provisions of this code or other ordrianoM Of the won shall not be FILE NAME: P-HVN i valid. The issuance of a permit bbd on construction documents and Wier data s:all not prevent the building official from requiring the no SHEET NO. building official is also authorized W p 9mg ocalpancy or use of a structure where in violation of this code or of any other ordinances Of this jurisdiction. PLANS EXANNEI; DATE J M0001 Cator. Rumo do Assoc. FILENAME:P:\VVMC\2006-053 VVMC CT SCAN\CAD\MECH\P-MSPEC.DWG _ MO.01 PLOT: 07/05/2006 0 11:55am REV: 06/27/2006 CAD: mmg XREF: tb-dwg PACKAGED AIR CONDITIONING UNIT SCHEDULE Q ( 4j ( 17 19 21 FAN DATA REHEAT COIL HUMIDIFIER FILTER DATA ( TE 1 E } 2 E ESP N MK 1978; (1978 \ 1978 DESIG. MFR. MODEL CFM WC AT FAN MBH M8H NO. KW NO. KW L.BSJ AREA % CONTROL REMARKS `� S.L. HP SENS. TOTAL ROVIIS STEPS HR SF EFF. AC-1 TRANE TWEM 2700 0.1 1.5 "A 82.7 4 10 2 - - - 30 INTEGRAL 1.3�,r.8 M AM M 0 I 0 ti OEIIIO (E) ACC-1 MARKS: UCLEAR I I I I I V ORK AND ACC-2 EDICINE FILE RM 299 .FRONT RETURN,UP DISCHARGE UNIT. PROVIDE DISCHARGE PLENUM WITH GRN.LE. XAM .PROVIDE MICROPROCESSOR CONTROLLER,ELECTRIC REHEAT,CONDENSATE PUMP. OFFICE 1-12 ROOM 5 Y008 • .PROVIDE NON-LOCiD IQ ELECTRICAL DISCONNECT. I { % MGR. PROVIDE SMOKE DETECTOR. .CAPACITY BASED ON 9500 FT ELEVATION. (E) SMOK 1 19 8 ~�~ BARRIER 0 TOIL DRAWING TITLE CT D ' I AIR DEVICE SCHEDULE 1OZ �' SCAN I rROOM DEMO (E) K DESIG. MFR TYPE MODEL FRAME MATERIAL FINISH DAMPER ACCESS. I 1� REFRIGERANT / ACS A (, — T TYPE I / H❑ 1 .E N C H 131 ❑ C– (E) SERVING E SDEWALL SURFACE SEE PLANS FOR L PR AC-2/ACC-2 A TITUS 300RS STEEL WHITE O.B.D. CONSOLE p900NNEC E SUPPLY MOUNT NECK SIZE WAIT (E) AC UNIT 132 MAKEUP wA _ COM SDEWALL SURFACE SEE PLANS FOR 135 B T1TUS 350RL RETURN MOUNT STEEL WHITE O.B.D. NECK SIZE TO REMAIN PIPING � � (>_) FD � 79. –1 CORRIDOR DEMO AND CAP (E) 12 9 I OOMMPu7m UK SERVIN ROOM I E9 i2- I � o M AIR COOLED CONDENSING UNIT I I RECLINER I - Q M NURSERY I ECH. RECOVERY I � N MATCHED COOLING CAP. AMB. SI LOW AMB. -RY 1 13 _130 101 _ DESIG. MFR MODEL SYSTEM MBHAT TEMP. NO. CAPACITY CONTROL CONTROL REMARKS I --T ❑ I I A 16 0 r 45/12 RA Z a COMPONENT 9500' COMPR CONTROL (TIIP. of 5) BELOW CT ACC-1 TRA E 2TTA0672 AC-1 GL7 95 1 0 comp. I V L6 N AC � Q REMARKS: FIRST FLOOR DEMO HVAC PLAN - B� • . 0 N SCALE: 178 =1 -O ; ; M m +, TITLE N v. 5773 U v 14 n17 19 21 a = B 6 10ItA � 1 E 1 �E } 2 E 16 A 1978 1978 � ( 1978 450 BELOW ABOVE AL- INSTALL REFRIGERANT PIPING I PER FACTURERS RECOMMENDATIONS C M AM M O I (UN DICATED) 0 0 0 REPLACE EXISTNG �■ L o JCLEAR I I I I I �O "�-' PARTIAL FIRST FLOOR HVAC PLAN EDICINE RL RM EXAM O 1 2 ---ROOM � SCALE: 1 f4 -1 -0 Z OFFICE g I—I I I I M GR. I I i ACC J E u W REFRIGERANT RECLAIM (E) SMOK 1 1978 U w SERVICE VALVE I I BARRIER Ip1 ROOF) y c-RL J -1 FILTER DRYER — o IL SOLENOID VALVE TOI L SEE PARTIAL 7P'RS U > FIRST FLOOR 5 MECH� �` REFERENCE DRAY LING PLAN VIEW SIGHT GLASS 10 2 HVAC PLAN C T © , —R 6aq K r\� I O o FOR REFRIGERANT PPE SIZES �� SCAN r 1978 EQUALIZER LINE uj TENCH I �� h �� IL EXPANSION VALVE / H ❑_ — _ — 7 / D PR — — — --- �"■ 0 0 CONSOLE f ; A 166 45/1 WAI T (E) AC UNIT 132 BEL I - 135 TO REMAIN ( 5) a � (E) FD uj - ♦ B �:, Lam./ COMPUTER Z 0 AIR COOLED THERMAL BULB, LOCATE 45' CONDITIONER _ _-- Q CONDENSING ABOVE BOTTOM OF PPE AS p B CLOSE AS POSSIBLE TO COIL 16/1 A 6OW UNIT AI OUTLET V C OR R I D O I INSTALL T PER I 12 MAWNA EAS RE ATTONS (LINE SI ] IFDI TED 1 REFRGERANT CHARGE GENERAL NOTES: SERVICE VALVE RECLINER NURSERY ECH. REVISIONS: RECOVERY 1. ACC-1 DUCT SMOKE DETECTOR NOT REQUIRED DUE TO _RY 113 130 101 EE)USfISCAN ROOM BIARRIAEER CONSTRUCTION SURROUNDING THE 006-27-Ofi CRAG UNIT W/ACCU PIPING DETAIL '� SCALE: NONE -'{q- FIRST FLOUR NEW HVAC PLAN SCALE: 1/8 =1 -O" DATE: 03-29-06 DRAWN BY: LKL CHECKED BY: DLY JOB NO: 2006-053 FILE NAME: P-HVNI SHEET NO. THIS WORK SHOWN AS EXISTING CONDITIONS NOTE: WAS TAKEN FROM OWNER FURNISHED EXISTING CONDITIONS ARE SHOWN WITH DRAWINGS BY CATOR, RUMA & ASSOCIATES, LIGHT LINE WEIGHT. CO. CATOR, RUMA do ASSOCIATES, CO. IS NOT RESPONSIBLE FOR THE ACCURACY OF NEW WORK INCLUDED IN THIS CONTRACT m1mol ANY INFORMATION OR THE ADEQUACY IS SHOWN WITH HEAVY LINE WEIGHT SAFETY AND CONFORMANCE TO CURRENT CONNECTION OF NEW WORK TO EXISTING PREVAILING CODES OF ANY WORK SHOWN WORK IS DESIGNATED BY " 19 ". AS EXISTING ON THE DOCUMENTS. KEY PLAN Cator, Ruma & Assoc. FILENAME:P:\VVMC\2006-053 VVMC CT SCAN\CAD\MECH\P–HVNI.OWG _ M1.01 PLOT: 07/05/2006 0 11:55am REV: 06/27/2006 CAD: mmg XREF: bgl.dwg HVN1.dw,g tb.dwg keyplon.dwg GENERAL ELECTRICAL LEGEND ONE-LINE DIAGRAM LEGEND MECHANICAL EQUIPMENT SCHEDULE (Mot dI wnbok fisted I d, we used on these dw"w) (Not d stmbds Ikted I are used on Mae droeh+ye) KEY ITEM OTHER EQUIV. VOLTAGE FEEDER CTION AT UNff NOTE SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION HP FLa WATTS (VA) VLTS PH SETS SIZE 'C DISC sWlr FUSE SC.SW. FUSE 1 UNIT 2.N 990DI 121038 460 3 1 3 8 10 .1 10 G 314 30 A 3 P 30 A 3 P ZO LIGHTING DISCONNECT 51MICH A PAIB790NID -A' ACC-1 TOP CONDENSING UNIT 12 10,143 480 3 1 3 N 12 .1 N 12 G 314 20 A 3 P 30 A 3 P 175 NOTES: RECESSED FLI ORESCENT UROLOWNE,LAY-N RECESS MOUNTED WALL LU WARE ----E3F OSCONECT SrRTCK FUSED ® EM-SNOW IAM PM-POVER METER. CM-CIRCUIT M01N10R 1. VE30"ItEgiMCAL EQUIPMENT CNM CURRENT SUES WITH MECHANICAL ECMW%i fr SHOP DRAWINGS PRK)R TO ORDERING. ® RECESSED RMORESCENT UMWV W, RAN= on PORCELAN KEYLESS UIIpHOLOER BRYMT f=W/IOOINI AIY -�� awiT BREAKER � VIaL11 M IEST SIM LF. LAMP. Ve RNOKJAIES PULLCIIAN ® SURFACE OR PENDANT MOUKIM LUMINJURE ;° (RACK LWOW -iC3F- EASE p AMMETER LEST STMTI H 'o �--o-� SURFACE OR N$INDJWT MDURII])STRIP OR 11RDIISTNRIAL WuNAIRE DOWEN"LK,IHING URT �II�— MOUND OV VOUMETER `,Z � •••• SHADING R UPPER AS 01 SiSUBSC LOHERL CMSE SUBSCRIPT INOICATES (TV EMT LIGHT. ARROWS AS R01CAXD,FACES INDIC AIED BY SHADING © STEP DOW IRANSF�R. N NEMGIES KVA A AINEIER 91RTCFiREy UPPER CASE SllllsipipT RNDICAlRES uRINAIE TYPE ® 0 SURFACE MOUNTED CEILING U NI NAME POLE MOUNTW UNN�IAIiE K-RAZED STEP DONE 1RANBFOIJMER �eew SEE IRANWORREIR SCIREDRlLE FOR FEEDER SIB i� BOLLARD UNRAIE ON SIZE � ® N 1�(AIES KVA, /DOICAIES K RAIIIG Q 3425 MUIPMENT i SURFACE MOUNTED WALL UAW&IE 00 SPOT LIGHT - CURRENT 1RAN5FIIum 0 SEE BI AS 9dEDUl s FTXL sI� -o'P L 0 5 1 � •.� .+� ® RECESS MOUNTED CLIIJNG UMIAIEE CO DARKROOM SAFE L16HT(T11MD COLIPARIIEIIT SIIONI) � POIpR11AL 'IRANSFORMER SEE FEEDER 5dEDIRE FOR FIR SIZE 1 4 ••..w.�• ®+ RECESS MOUNTED CELTIC t�+�-DI+ECIIN111L I� wou"1lrITER LK, m `5¢ J SERVICE ENTRANCE IRAIIEOWER GO ENGINE GENERATOR � ► y`4 S ONAL POWER uww REIER I— CON A=/IELAY/WACITDR(AS NOIEID) DRAWING TITLE 040E RECEPTACLE ® MOTOR STARMBR C_] MUPMENT ENCLOSURE TRANSFER STRETCH - ATS-AUIOMAIHC, MIS-MANUAL OUPLEX RECEPTACLE PM PLUG-VOID(MULl1-OUST ASSEINLV) <PE SfRNCE 11EA1ERHEAD ® COW FAULT Ill WPTER DUPLEX RECEPTACLE, GROUND FAULT PROIECDON *REMOLD (SURFACE RAIEWY) I„ SHORT CIRCUIT CURRENT AVAILABLE ® 7RAFISENT VOLTAGE SURGE affaSStit ELECTRICAL S 16 WPM RECEPTACLE.ISOLATED MOM `� CONMrcL' on'M PREvNwO EQuPIE71T OK o KIRK KEY SnERIMY,SUBSi7MT INDIES NIFAOCIECD GROUP SS SHUNT MOP DPASM iB-ELECTRICAL SECTION 10010-BASIC ELECTRICAL REQUREIENT S DOUBLE DUPLEX REOEPrACLE " Room mm CABLE EOo ELECIRICAL NIFALOdI. Si T NOICAIES NTDRLOCIED GROUP >> IERMIwIMUNS LO-LOAD BREAK"L0-4W LOAD BREAK A. ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH LOCAL AND STATE CODES,AND LATEST EDITIONS OF UBC.NEC.,NFPA AND ADA. DUPLEX RECEPTACIF, HALF SOTC1ED COMM. CONCEALED O MECHANICAL INNR LOCK -<< >>- MW-WT DEICE B. CONTRACTOR SHALL PAY FOR ALL FEES. DRAWINGS DUPLEX RECEPTACLE. CEILING MOUNTED —- — CONDUIT,E POSED EO ELECIRICALLY OPE RAZED �� PLHRCrN DEICE C CHANGE ORDERS,MAJOR CONDUIIT RROUTING.FELDLCHANGES,,ETTC INDICATING ALL ADDEINDUMS, ® DUPLEX RECEPTACLE. FLOOR MOUNTED ---- CONDUIT.UNDERGROUND OR CONCEALED N FLOOR D. CONTRACTOR SHALL PREPARE THREE(3)SETS OF MAINTENANCE MANUALS,INCLUDING ALL WARRANTY INFORMATION.AND SHALL INSTRUCT OWNER ON OPERATION OF ELECTRICAL DOUBLE DUPLEX RECEPTACLE, FLOOR MOUNTED CONDUIT RUINING DOW SYSTEMS_ W SECTION 7 SPECIAL RECEPTACLE � CONOW IUNINNG UP 0710-RACEWAYS A GENERAL 1. RIGID,INTERMEDIATE METAL AND FLEXIBLE METAL CONDUIT SHALL BE GALVANIZED STEEL Q 0 ® SPECIAL RECEPTACLE.FLOOR MOUNTED —3 CONDUIT CAPPED 2. ELECTRICAL METALLIC TUBING SHALL BE EL.ECTRO❑GAI-VAN12ED STEEL.%INCH MINIMUM_ W Or 7RIETMR06TAT —",P- BRANCH CIRCUIT HOW RIR'b NUIW OF ARBORS NIIICAIES 3. UQUIDTIGHT FLEXIBLE METALLIC TUBING SHALL BE GALVANRED STEEL WITH POLYVINYL A-1,3,5 NUMBER OF CIRCULTS.SUBSCRIPT INDICATES PANEL&CNICUIS JACKET BONDED ONTO EXTERIOR O ANC7w BOY, MAIL OR cam MOUKRD 1T6 GROUND BAR 4. ALUMINUM CONDUIT,AC TYPE CABLE WILL NOT BE ALLOWED. 5. WIREWAYS SHALL BE OF THE BINGED TYPE WITH ALL PARTS FACTORY FABRICATED. JO JUNCTION SOX FLOOR MOUNTED G Cdr. N CONDUCTORS L MELB . CONTROL PANEL OR 01HER WIDTH AS REOURED 8. L BE SIZED ACCORDING TO THE NEC BASED ON USE OF COPPER _ FLE)IBLE IV"D6nvxn)N ON ® MAM SETaOG DASWORpN CENTER 7. CONDUITS SHALL BE CONCEALED IN BUILDING CONSTRUCTION EXCEPT WHERE EXPOSED 0 I RUNS ARE INDICATED. Z M Q MOTgt MMgORMER 1/2' 8. EMERGENCY CIRCUITS SHALL BE RUN IN SEPARATE RACEWAY SYSTEM. Q M 9. ELECTRICAL METALLIC TUBING(EMT)FITTINGS:STEEL COMPRESSION FITTINGS FOR J N D19CONECT S?MTCIR(HLON-FVSBD) Cr aI�E1lr TRANSFORMER GABBLE RAINTIGHT AND CONCRETE TIGHT APPLICATIONS. STEEL SET-SCREW FOR ALL OTHER Q Co f DISCONNECT SNITCH(FUSED M UTU Y VEER ACC - 1 1/4" NYLON BCTIONS. FOR FINAL CONNECTION EARED AND HAVE NYLON INSULATED THROAT OR Q < v ❑� ) Q� 1/4• 10.LIQUID-TIGHT AND METAL FLEXIBLE CONDUIT FITTINGS:MALLEABLE F ICON OR STEEL WTTN Z � N' COLNNAIKN STARLIER/bB00lIECT GENERATOR ANNUNCIATOR PAS FED FROM P G-D H M 3/16' NYLON INSULATED THROAT ON NYLON BUSHING_ U Wu� SWITCHING 2 1/2' SECTION 16120-ORES AND CABLE W (9 () o 1/4 A. CONDUCTORS SHALL BE NEW AND UNUSED COPPER,SINGLE CONDUCTOR TYPE J W o SO SINGLE POLE SN NCH (SUBSCRIPT DENOIES SMRCHMRG) V LOW VOLTAGE SRRTCN 277/480 3 3 W 3/16" B. NUMBER 10 AWG WIRE AND SMALLER SHALL BE SOLID. W J C. NUMBER 8 AWG WIRE AND LARGER SHALL BE STRANDED. N TWO ROTE SNTiCH SVS vARUABLE SPEED sWN7oR D. GROUNDING CONDUCTORS SHALL BE COPPER IN ALL CASES. TITLE C4 Si INREE-NRAY STITCH EVLOSION PROOF SWITCH E. BRANCH CIRCUIT AND FEEDER WIRING SHALL BE COLOR CODED IN ACCORDANCE WITH THE *-% 13/16 NEC. M S4 FOUR-WAY SrNCH Sro ?rood&0YERLOA0 SNIRH F. GROUND CONDUCTOR PROVIDED FOR ALL CIRCUITS. � S�� 8EC LION 16133-C:ABINETS,Some.A FITTINGS � z KEY OPERAIEO 5rR1CIR -III: MOLENTARY CONTACT SWrnCH MANUAL!NTM' "wa3pOIRER RAZED �S COM MMON SWITCH AND DUPLEX RECEPTACLE A COMPLETE CONTRACTOR ACCESSORIES SAD PER GTH NEC_METAL PULL 8�.RLINCTION BOXES %SO DIi M SWITCH P PHO70CIELL CONTROL B. PULL d.JUNCTION BOXES SHALL BE FACTORY PAINTED- SHALL BE PAINTED RED. 0 Q C_ PULL 8 JUNCTION BOXES AND CABINETS O E MERGENCY SYSTEMS SNITCH V H PEAT LIGHT SM D. OUTLET BOXES SHALL BE INSTALLED SECURELY AND PLUMB WITH BUILDING LINES IN M o (PLOT LIGHT IS'OtR'WIN SM7M IS'ON') Pto=T1ORl SwTCR wrLH PLOT LK,IIT LOCATOR ACCORDANCE WITH THE nEC. SP (oDN1TNUa My IJLiR u HANDLE? TC TIME CLOCK SECTION 76142-E LIECTRICAL CONNECTIONS FOR EQUP ENT RV a0 A MOTORS SHALL BE RATED 208V SINGLE PHASE,AIND 480V THREE PHASE UNLESS NOTED O DCOUPARLCY DISCONNECT OTHERWISE. J REFERENCE SYI►ABOLS W3_ PROVIDE CONNECTIONS TO IilAG1yETLG MOTOR STARTERS FRONDED BY DMS10L715,FOR ALL � � SINGLE PHASE AND THREE PHASE MOTORS AND MOTORS INTERLOCKED WITH EXTERNAL � DETAL NOTE ° °�TN`�° '"" NAMEPLATE DETAIL °�"` w o G) NOTCLEN EQUN%M REFERENCE 0 E1N61M 70 BE REMOVED SECTION 10700-SUPPORTING DEVICES � E SCALE: FULL A. HANGERS,SUPPORTS AND STRAPS SHALL BE CORROSION RESISTANT OR GALVAN12ED STEEL x UH MECHANICAL EQUIPMENT REFERENCE ® EXISTRLC 10 SE RELOCATED B. SINGLE CONDUIT RUNS SHALL BE SUPPORTED BY GALVANMED CONDUIT STRAPS OR RING Z g BOLT TYPE HANGERS. W C ® E1O51NG - REPLACE NOTES' C. CHANNELS TH ROD HANGERS BE SUPPORTED BY TRAPEZE TYPE GALVANIZED STEEL LLd I. SEE SPECIFICATIONS FOR ADDITIONAL NAMEPLATE INFORMATION. ABBREVIATIONS D. ANCHORING METHODS AS FOLLOWS: _EXPANSION N A AMPERES MCP MOM CIRCLET PROTECTOR 2. REWORD NAMEPLATE FOR FlELI? CONDITIONS. 2. SOLID MASONRY LEAD EXPANSION ANCHORS OR PRESET INSERTS. r ABOVE COUNTER.MOUNT HORIZONTALLY TO CENTERUNE 9-8-98 16195.3 3. METAL SURFACES:MACHINE SCREWS,BOLTS OR WELDED STUDS.SEE MECHNICAL EQUIPMENT SCHEDULE w W AC OF +B"ABOVE IXIIULTER OIL BACK SPLASH MEC MNMNR 5. CONCRETE SURFACES:W OD MANSION OR SELF❑DULLING ANCHOI?S_ � AFF ABOVE FTNRSFED FLOOR MIN E. RACEWAYS SHALL BE SUPPORTED EVERY 10 FEET AND WITHIN 38 INCHES OF EACH OUTLET, A AFG ABOVE FINISHED GRADE MLO MAN L�ONLY ELL,FITTING,PANEL,ETC_ Q F. RACEWAYS OR EQUIPMENT SHALL NOT BE SUSPENDED FROM PIPING OR DUCTWORK 0 ANN ANNIRNaAII MIS RdANRiw<�A" " TYPICAL 11'-0' CEILING OR HIGHER Q rCaPS 0 } I I I I I I W ABOVE RAM FLOOR NC NORMALLY CLOSED TOP s B F M I I I I I I A. VI OR VINYL❑C L LFID ❑ IVE,WRAPAROUND,CAB MARKERS ARF R! SHALL BE PROVIDED FOR WIRE)CABLE DESIGNATION_ ASSD S,RORE NIC Not N CONTRACT TYPICAL 8`-0' CEILING n C s M �+±a 9 9 9� Np I I I I I I B. ENGRAVING STOCK MELAMINE PLASTIC LAMINATE,WITH ENGRAVED LEGEND PER HOSPITAL AT'S MROMMIIC IRRMIM SWITCH NL NICIRT tTR;IRT BOTTOM OF DEVICE Tr H/S ggSJS gg L•VI I I I I I I STANDARD I NNE�D ED FOR MECHANICAL FASTENERS SHALL BE PROVIDED FOR BFG BELOW RMSHD GRADE NO No�ALLY OPEN A M LJ 11 I I I I W SECTION 10475-CWERCURRENT PROTECTIVE DEVICES o TOP OF CABINET no I I I I I I A CIRCUIT BREAKERS SHALL BE OF THE SAME MANUFACTURER AS PANELBOARD;THERMAL C CONDUIT NTS NOT TO SCALE CAN CABLE OC ON CERLIEA Fw�l OcaN1TR0L PANELS�PO I I I INOS�A�1,E►pIL A� � T MOUNTING BE MAGNETIC.QUICK❑MAKE.QUIC KE]BR AK.TRIP FREE,TRIP INDICATING,BOLT❑IN TYPE AND J z 0 TOP CAEMI+�T RATED FOR THE AVAILABLE FAULT CURRENT. W I I HEIGHTS '%ND LOCATED WITHIN ONE B. DISCONNECTING SWITCHES SHALL BE NEMA STANDARD TYPE*Hlr 100 PERCENT DUTY RATED CB CIRCUIT BREAKERS OFCI CRIER Ftffag ILO. CON NUCTOR INSTALLED _� TOP OF CABINET I I I STUD SPME FROM EACH OTHER SHALL IN NE..MA ENCLOSURES WITH QUICK❑MAKE,QUICK❑BREAK OPERATING MECHANISMS. CLOSED gRCLIT lE1E11510N OILER FldRN6lEp.ONlER INSTALLED ANN O 0 LO D I I ALIGN CALLY. ON THE SAME: SIDE PROVIDE FACILITIES FOR PADLOCKO R IN LARGER AMPERE CCTV OFOI n c� n cs� OF THE il�Eli WALL MOUNTED C. SWITCHES SHALL BE OF THE SAME OR LARGER AMPERE RATING AS THE CIRCUIT PROTECTIVE E ENSM OSWF ON 511E VAM FORCE O®� x T �PB TP xP® F❑ F❑P I I I I TELEPH OCCUR OVER LIGHT DEVICE. J W I I I I VOLUME CONTROLS, ETC. D. FUSES SHALL BE OF SAME MANUFACTURER EM EMERGENCY PB PULL Box U 0 QM S 4�s I I� I I OFFSET STW �� END OF SECTION EMDC RaTETRGENC.'Y MAN DISTRIOU111ON CDM SB STAND-BY r! GR I I I I I I ' U EP EWUNION PROOF SDC SUB-oISmuTI N CENTER EPO EMERGENCY POWER OFF TP TAMPER PROOF ' ' ' ' ' 110 x I I FaRRERGENCY VO AXON ON/IOFF HISS 1RMISENNT VOLTAGE SURGE SUPPRESSER o o ID 6 I m o ,p I I I REVISIONS: EVO l �' , i R II II II I as-xs-os EWC ELECIIBC NAIER COOLER TYP 11PN.AL FA RRE ALAiRM OF UNDER FLOOR m o � m °° FTN FLOOR SHE� I I I I I I G GROUND UG UNDER GROUND GC TYPICAL DEVICE MOUNTING HEIGHTS p GENERATOR CONTROL PANEL LION UNLESS OIHERR.SE NolEn GFI GROUND FAULT RLIERRIRPTMG UPS INMRTFl1RI1PrARl1.E POOR SUPPLY NO SCALE HOA HAND OFF AUTOMATIC Y VOLTS NOTES: IG ISOLATED GROUND VFD VARaBLE FREQUENCY DRIVE 1. HEIGHTS SHOWN ARE TYPICAL TO CENTERUNE OF BOX UNLESS NOTED OTFERWIISE. MAX MATS W/ vNH 2. 04ERE EVER DEVICES ARE INDICATED TO BE ABOVE DOORS. DEVICE SHALL BE CENTERED BETWEEN 70P OF DATE: 03-29-06 MCB MARK GROUT BRAINRt W/0 DOOR TRIM AND CEILING LIVE. NIIIROIJi 3. MOUNTING HEIGHTS SHOWN ON ARCHTECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHIONN ABOVE. DRAWN MCC MOTOR CONIM CENTER WP V"7IER PROOF CHECKED BY: M MAY MDC MAR" DIS7RBU7IORd CENTER XFMR TRANSFORMER 6-4-02 16143.1 JOB NO: 2006-053 FILE NAME: P-LEG SHEET NO. E1.01 Cator, Ruma do Assoc. FILENAME:P:\VVMC\2006-053 'SVMC CT SCAN\CAD\ELEC\P-LEG.DWG _ E1.01 PLOT: 07/05/2006 0 1:20pm REV, 07/05/2006 CAD: georgie XREF: tb.dwg 4if4,#8G THAN-I-C- 4#4,#BG THHN-1'C. LIFE SAFETY NURSES STATION PANEL iE,1A,' EMI / C1C CAA CUB ORA /f BASEMENT BASEMENT OPERATING OPERATING STORAGE STORAGE ROOM ROOM 175.46 175.46 \N11111iNy1ly .�a�O REG 40.4C 175.46 ,T4 •+•M•►yr B. l • a s 2�fi - • g -q' Q_ $ MAX DEMAND :'RR L a � � 29 AMPS �,a ppp«,,,•���a�•MR••=r\� ATS MAX DEMAND � ltr■ii� 2nd FLOOR �- !2 54 AMPS 350.3 BOILER ROOM 40A LIFE SAFETY BRANCH % '- 40A3P LIFE SAFETY #35 'EM 225A CRITICAL BRANCH DRAWING TITLE ,J„!_J 20DA3P ATS /'.f. CRITICAL Jerry, l.J. 400A EQUIPMENT BRANCH MED. RECORDS SPARE BASEMENT CORRIDOR DISCONNECT BOILER COND. UNIT AHU-4 2nd FLOOR (OLD LAB) CLINIC CLINIC SWITCH ROOM (ON ROOF) IN BSMT. ELECTRICAL ELECTRICAL ROOM 40DA3P MAX DEMAND EQUIPMENT 105 AMPS KP-1 LA PE LPA PA Lp LPO LPC OFF ii -EM1A ELB-EO M M �EM1C' HUMIDIFIER CONDENSER ELEV. H-1 C-1 Fr- ri!•r'' , COMPUTER DUPLEX ff��/ AC NUCLEAR 200M3P r'r`-' DATA RM. VACUUM AHU-3 P-1 P-2 AHV-5 EF-20 P-4 AHU-1 ,'/ NUCLEAR MED. MED./ -- PUMPS HUMIDIFIER AC-2 AC-4 AHU-2 X-RAY RAF-2 BSMT. BSMT. BSMT- BSMT- ELEC. RM. ELEC. RM. ELEC. RM. ELEC. RM. r 1 70FRN I I I 1 -4 40.46 30.3 20.3 30.3 30.3 30.3 20.3 20.3 20.3 30.3 100.46 175.46 40.46 350.3 40.3 40.3 30.3 20.3 tKNKN 1 TODA3P 1 100A3P I 100A3r I 100ATr r _ _ _ _ _ - - SPARE - ITE r iir .f�i f/%- /ILIA - - - - �f I ,J�� _; f,�f ���I��! ;i j/,jxr `���_r�/�_. ��r/: i�/r� rs`r•r �� '/ ' �f •l i'. �/���_ �1i/ r //r../ r � �� _.�'/� �` �� I ® EMPTY ® EMPTY M M 'r '� ! r. -`r , TR21)I2.; r/ lf/ r: f fI r� r r I f f .;ii 'i }. � f-; r >f - f //- lA 50. I 20DCRNR 150CRNR 150CRNR 100CRNR 100CRNR 70FRN 70FRN O O r '-r �:' %1.00-:' -:. /..,:.�,•.,`/!.._;-40/-%i/,' r}l� .r /' J15�� i 30`I- / .25 � .25 r r /� ,7' :�15•_/'• ;30/i,, r100-; . / � 17 4D�PN J300LPN f SPARE ��., SPIRE 444 40A 30A `-11 ,/-` fr :•`:_ .s- J{��j i :!r:- f• -_r t f/ ! .! r�r � lJ r/ !! ♦ - /- :-rte f /Jf ��� %i r� / .� I i ' f f% /: / _ f r / / I t�r_ fr,/.`� r` ♦rr rf / 1 60p3P 60A3P 6443P 6DA3P 3OA3P 3.1 3043P 300.7P 200A3P 200hTP 200h3P 10DA3P 100A3P 100A3P 100A3P / r I �lOpA3P :- =::30A3P I 60ASP=%. .,-60IL3P= f 3Q0.9P.r /'3tYL7Pr: r 300.WI .r. 3Q(�jP ��f / 30A3Pf- -30AA7P x 100A3r�' � _. .r, ;20011iP ifiDA3P P f 6QiL3P� f r / '7-i= I c rf./F, "'l �%iti '!r i/r//.: •!. .'/.• - .//` r .Ir �r: r/ r! :r ;. r=.i % /r.r i / �% /i% f`•• =1 :' t =f % 4 6 1 2 3 4 5 6 7 8 9 ,;IS /• %1•� -ir;'.2 :r�:'=fr:,.3: /; /••/4. / :/i'S=//rli r6-f!: �'i%7 f e �f `J�'9. / 10- ,�11• �1 x ;'L•: :. '. %/.r; .r �1 / r/ / /.; `,f f �_ :/ ✓>r/,•J:/r /:'/'.•,' ; i�';,;- 2''- ,.,:.` 3 %i'�; / /`/f /�;f/Jr�,/`� f ';� Jr/I/% f 1 2 3 5 '.,f- -f, ,r` /�-. - .I, i-�r"1./'-,i. !- /J f % '�1rliLrl�i��_- - '/:•.- - � - �L11111UC1lf/-f � -/ L- - - - - - - "PP-1" (SQUARE D QMB) IN BSMT. ELEC. RM- - METERS AND "EMCC" (SOUARL D OMB - SAFELEX) y L "EDP' (SQUARE D OMB - L "MCC' (SQUARE D OMB -- SAFELEX) - p 120/208V, 30, 4W CABINETS 120/20BV, 30. 4W SAFELEX) 208V, 30, 3W ~ N 600.0 50%NEUTRAL 120/2DBV, 30, 4W 700.4 200A O 400A 60DA Q M W Q GENERATOR SITE LTG. MED. L Z v DISCONNECT{,� �_ X-RAY ADMIN. BSMT. CONTACTOR RECORDS TO PANEL "EHDP- VIA 4` =� V RM- 2 CORR. WALL ELEC. RM. EAST PKG. LOT (OLD LAB) ��♦ 20OA3P CIRCUIT BREAKER ,"� L2A- L2A- LIA LIED r U J 1`` IN GENERATOR ROOM \y l LU ADMIN ADMIN SEC 1 SEC 2 J Z 8 QCi 30.36 W 0 � N EM GENERATOR M 150 KW.U `i 188 KVA, 520A 20A TAE 0� 208-12OV,30.4W co AMBULANCE BUILDING - AHU 150A MAX/PH ON M 40.4G 150.2G 100.46 90.4G 150.3 k7S,4G 175.4 350.3 v FEEDERS � CONDENSING TESTING 10/9/96 UNIT fEpl EQ - - - - - - - - - - - - - W OZ 200A3P/200A FUSES (� �) E1.EG ELEC. LEARNING LEARNING �0.�� SPARE _ O 80011 ROOM CENTER CENTER I 40A 100.0 60FRN 100FRN 100.0 100w 150.0 175.0 I 300.0 I d -120/206-30- W 100A3P/100.0 FUSES -� 480-120/208Y- PG-' PPr- PG- PG- PG- Ptr SOOKVA ylP 30-4W 75KVA EH1A� XFMR BL1A1 BH1A BL1A BL1AA CT pwl 6Ok3P 100A3P 100A3P 100A3P 10OA3P 10pA3P 200A3P 20OA3P 20" 400A3P TRANSFORMER "r ROOM SCANNER TRANSFORMER I CIRCUIT h 41250 MCM,1#4G-3-C. /r;'r F BREAKER 1 2 3 4 5 6 7 9 11 13 I 40 L _� 200A3P W/SHUNT - - - - - - - - - - - - - - -- ELEC_ 125FRS `MOP- ROOM 120/208V. 30. 4W O XFMR XFMR 110.46 1000.0 � O XFMR p ORIGINAL PULLBOX i M VAIL MTN. W i MEDICAL 3 45 30 a T �(2) C Y HOLY CROSS P, 75 w Z g HOLY CROSS M METERING a� ARE SPARES � a W SECONDARY PAD XFMR XFMR SUPPRESSOR 200.46 XFMR 1200.46 800.36 600.46 200.4G 400.4G 1000.46 N MOUNT XFMR a H SPARE f SPACE J SPARE 70A 45A 150LPS um 21X1.0 110.0 125LPS 1 120MPS 7" 60OKFN 200KFN 400KTN 1000KTN 60" PRINGLE 330OWP GFCI I 200A ` BDA3P 100A3P 100A3P 20OA3P 60A3P 20" 200W 20OW 120OW 120OW � � � 60OA3P 4001�3P 40W13P 120m3P 600A3P IL OC EXISTING HOLY CROSS � I ; PRIMARY SYSTEM I - - - Lam- - - V7E3622 -V7E3633- - - - - V7F3604 _ - J I HCP - PRINGLE - - - 1 BULTSW. 2 BOLTSW 3 BOLTSW. -4 BOLTSW. 5 BOLTSW. �` Q � T325-4Y01 T325-WO] T325-W01 T325-WD7 T325-WOl DETAIL NOTES THIS SHEET: o DISTRIBUTION PANEL "DHA" PULLBOX "DLA' (WEYCO) 4/0 GND TO COLD WATER PIPE 48OV-30-4W 120/2pBV-30-4W W AND MADE ELECTRODES 3000A. 100.000 AIC 3000A <% PROVIDE THREE PHASE DIGITAL RECORDING CIRCUIT ANALYZER (DRANETZ 80% Im ITE 1ENCLO AIE 3030 OR EQUAL ON INDICATED PANEL FEEDERS FOR A PERIOD OF THIRTY DAYS WITH (0 MPARE 4 C. C.) - - PARTIAL EAST ONE-LINE DIAGRAM SERVICE ENTRANCE RATED PRIOR TO THE START OF CONSTRUCTION TO VERIFY EOSTING LOAD. CIRCUIT WITH (2) SPARE 4"C. ANALYZER SWILL RECORD VOLTAGE, AMPERAGE, KVA AND POWER FACTOR FOR SCALE: NONE EACH PHASE AND AVERAGE FOR ALL PHASES ANALYZER SHALL ALSO RECORD A PER DAY MA�IUM DEMAND. THE CONTRACTOR SHALL COMPILE A SUMMARY EXISTING PANEL 'PG-BL1A1" MS77NG PANEL "PGOHAr G REPORT USING MAXMIUM READINGS AND SUBMIT THE REPORT AND TAPE TO THE J ENGINEER. ANALYZER SHALL HAVE BEEN CALIBRATED IN PREVIOUS 60 DAYS. Panel Nabs: Panel Nabs: SUBMIT DOCUMENTATION OF CA[UBRATION ALONG WITH LOAD TAPES TO ENGINEER. J Z 100 A MAIN CIRCUIT BREAKER VOLTAGE 1201208 V 1.NEW LOAD ON EXISTING CIRCUIT BREAKER. 1200 A MAN CIRCUIT BREAKER VOLTAGE 2771480 V 1-NEW LOAD ON EXISTINIG CIRCUIT BREAKER 225A BUS PHASE 3 PH 2.PROVIDE NEW CIRCUIT BREAKER IN SPACE TO MATCH EXISTING, 1200 A BUS PHASE 3 PH 2.PROVIDE NEW CIRCUIT BREAKER IN SPACE TO MATCH EXISTING. WIRE 4 W &REPLACE EXISTING CIRCUIT BREAKER WITH NEW CIRCUIT BREAKER AS SHOWN. WIRE 4 W 3_REPLACE EXISTING CIRCUIT BREAKER WITH NEW CIRCUIT BREAKER AS SHOWN. TYPE: 4.EXISTING LOAD IS ESTIMATED. TYPE: 4.EXISTING LOAD IS ESTIMATED. MTG.: SURFACE Z r AMPERE SHORT CIRCUIT RATING(FULLY RATED) 5.EXISTING LOAD REMOVED. MTG.: SURFACE -i r AMPERE SHORT CIRCUFF RATING(FULLY RATED) &EXISTING LOAD REMOVED. 13 NEYYLOVAD. B NEW Logo. BR ONE-LINE DIAGRAM NOTES: BREAKER BREAKER BREAKER BREAKER NOTE DESCRIPTION LTG RECEPT MOTORS OTHER GENERAL TOTAL AMP / P CCT PH CCT WIMP 1 P TOTAL GENERAL OTHER MOTORS RECEPT LTG DESCRIPTION NOTE NOTE DESCRIPTION LTG RECUT MOTORS OTHER GENERAL TOTAL AMP / P OCT PH CCT AMP 1 P TOTAL GENERAL OTHER MOTORS RECEPT LTG DESCRIPTION NOTE 1. PANELBOARDS INDICATED ON ONE LINE DIAGRAMS DO NOT SHOW ALL BRANCH CIRCUITS. RY SYSTEM COMP 2011 1 A 2 151 0 7 ARE 30► I A 2 201 1 SPACE REFER TO PANEIMM SCHEDULE(S). RY SYSTEM COMP 2011 3 B 4 1 0 ► 3 B 4 2D1 1 SPACE RY SYSTEM COMP D 2011 5 C 6 / 3 0 - 1 3 6 C 8 200► 17 17 ELEVPAFtKING 2. EQUIPMENT SHOWN SHADED REPRESENTS STAND-BY POWERED SERVICES. TOILET RM HEATER 0 201 1 T A 8 2011 0 ARKNG REC ARE 301 7 A 8 1 17 17 PARKING GATE LVL 3 0 2011 9 B 10 2011 ARKNG REC / 9 B 10 1 3 1T 17 - THROOM LTG,REC 0 2011 11 C 12 2011 FLR CVH 13 11 C 12 901 1 1 STEAM GEN(SU NOTES: REVISIONS: TG 0 201 1 13 A 14 2011 2.6 1 990 401 30/ 13 A 14 1 1 1 - EF45 0 2011 15 B 6 2011 IRKING GATE 8BC1 401 ► 16 B 18 / 3 , , _ E N E RA L TG D 201 1 17 C 18 2011 FLOR CVH 9BC1 401 13 17 C 18 1001 21333 21 X-RAY 42 1 -26-06 _ 1. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD. EbST1NG CONDITIONS TO ACC-3(ROOF) 0 201 1 19 A 20 2011 EQ.RM REC 2,6 ACC-1 1 1 201 19 A 20 1 21333 21 REMAIN ARE DENOTED LIGHTLY. EL.EV LOBBY REC 201 1 21 B 22 201 LTRASOU6Q AC - 1 1 / 21 B 22 1 3 21333 21333 - CODENSER(RF RM) 201 23 C 24 12 - 1 1 ► 3 23 C 24 1001 SPARE 0 1 2 25 A 26 20111 ARKNIG GATE ACE / 25 A 28 1 - HT 1ST FLR 0 201 27 B � 2011 0 ISPOSAL ACE 1 27 B 2B 1 3 - 0 1 2 29 C 30 2011 0 CLINK:REC ACE / 29 C 30 801 1 1 STEAM GEN(SURGEF Y) A1C 3(RF RM) 0 151 31 A 32 2011 0 CLINK:REC ACE ► 31 A 32 ► 1 1 _ FEEDER SCHEDULE ACE I 33 B 34 / 3 1 1 - CONDUCTORS 5 SPARE 301 35 C 38 151 0 SPARE 5 ACE ► 35 C 36 / 20.3 3# 12 314 0 12 37 A 38 12 0 - ACE / 37 A 38 1 SPACE 3D.3 39 10 314 5 SPARE 3D1 39 B 40 401 0 SPARE 5 ACE / 39 B 40 301 51 51 ENOOSCOPY RM 4 40,3 3# 6 314 DATE: 03-29-06 12 41 C 42 ► 2 0 - ACE 1 41 C 42 ► 2 51 51 RTU VLA SFMR 4 150.3 3# UO 1 112 DRAWN BY: JH PHASE LOADING SUMMARY PANEL LOADING SUMMARY Q PHASE LOADING Sl1MMARY PANEL LOADING SUMMARY 350.3 3# 500 3 1 LOAD TYPE(VA) PH A PH B PH C. LOAD TYPE CONNECTED NEC CALCULATED POWER DEMAND 100.4 48 1 1 112 CHECKED BY: MAV LOAD KVA DEMAND LOAD FACTOR LOAD KW PANEL LOAD KVA DEMAND LOAD FACTOR LOAD KW PANEL 175A 49 2J0 2 CONNECTED PF= CONNED PF= 150.2 G 3# 1A 1# O G 1 112 JOB NO: 2006-053 LIGHTING 0.0 KVA x 125%= 0A KVA x95% = OA KW 0% LIGHTING OA KVA x 125%= OA KVA x99% = 0.0 Kw 98% 40A G 4# 8 1# 10 G 1 LIGHTING 0.0 OA 0.0 RECEPTACLES LIGHTNiG 0.0 OA 0.O RECEPTACLES 5D�1 G 4# 9 If 10 G 1 1N FILE NAME: P-1 LINE RECEPTACLES 0.0 0.0 0.0 FIRST 10 KVA 0.0 KVA x 100%- OA KVA x 100% = OA KW CONNECTED RECEPTACLES 0.0 OA 0.0 FIRST 10 KVA OA KVA x 100%= OA KVA x 100% = OA KW CONNECTED 90-4 G 4# 2 11# 8 G 1 112 MOTORS 0.0 0.0 OA REMAINDER 0.0 KVA x50%= 0.0 KVA x 100% 0.0 KW AMPACITY = MOTORS 19617.0 19817.0 19817.0 REMAINDER OA KVA x50%- OA KVA x 100% 0.0 KW AMPACITY 100.4 G 4# 1 11# 8 G 1 112 OTHER 0.0 0.0 0.0 MOTORS 0.0 OTHER 27977.0 33077.0 330T7.0 MOTORS 184X 175.0 G 4# 2!0 It 6 G 2 SHEET N0. GENERAL 0.0 OA 0A LARGEST 0.0 KVA x 125%= 0.0 KVA x90% = OA KW GENERAL 0.0 0A OA LARGEST 52A KVA x 125%= 655 KVA x90% = 56.9 KW 20DA G 4# 310 10 6 G 2 112 TOTAL 0.0 0.0 0.0 REMAINDER OA KVA X100%- OR KVA x90% = 0.0 KW NEC DEMAND TOTAL 47504.0 52894.0 52694.0 REMAINDER 6.5 KVA x 100%- 6.5 KVA x90% - 6.6 Kw NEC DEMAND 350.4 G 4# 500 1# 3 G 3 1!2 PHASE BALANCE A41 B4r CAA OTHER OA KVA x 125%= 0.0 KVA x 100% = 0.0 KW AMPACITY = PHASE BALANCE A4 B4r C-A OTHER 94.1 KVA x 125%= 117.7 KVA x 100% = 117.7 KW AMPACITY = 400A G 48 500 IN 3 G 3 ,72 BD0.4 G 2 I 4# 350 1# 1 G 3 1 OA 0.0 0.0 GENERAL OA KVA 1100%= OA KVA x 100% = OA lnlr _ 0.0 0.1 0.0 0.1 GENERAL DA KVA x 100%= OA KVA x,00% = 0.0 Kw 228.1 700.4 G 2 D 42 500 I# 1A G 3 112 1 800.4 G 2 I 4# 500 1# 110 G 3 112 1 TOTAL OA KVA 0.0 KVA 0.0 KY1r TOTAL 153.0 KVA 169.8 KVA 182.4 Kw 1000.4 G 3 D 4# SIX 1# 2A G 3 112 1 GENERAL NOTES: BREAKER ACCESSORIES GENERAL NOTES: R ACCESSORIES 1200A G 4 I 4# 350 . 1# 310 G 3 1 'PROVIDE NEW UPDATED PANEL DIRECTORIES FOR PANELS THAT ARE INCLUDED IN THIS PROJECT. '=GFCI 'PROVIDE NEW UPDATED PANEL DIRECTORIES FOR PANELS THAT ARE INCLUDED IN TITS PROJECT. =Gm MEC SEE MECHL EQUIPMENT SCHEDULE ' PROVIDE TYPED DESCRIPTIONS OF NEW CNtCIATS BEING INSTALLED.INDICATE NEW SPARES IN PENCIL. "'=SHUNT TRIP ' PROVIDE TYPED DESCRIPTIONS OF NEW CIRCUITS BEING INSTALLED.INDICATE NEW SPARES IN PENCIL. =SHUNT TRIP XFMR SEE TRANSFORMER SCHEDULE Caton Rumo & Assoc. FILENAM1E:P: VV1MC 20O6-053 VVMC CT SCAN CAp ELEC P-1LINE.DWG - E2.01 PLOT: 07/05/2006 O 1:21 P m REV: 06/27/2006 CAD: georgie XREF: tb.dwg 11-pkgg.dwg GENERAL NOTESI M A M M 0 (ON ROOF) PG-BL1A1-39,41 I I M A M M O I ! 1. WORK INCUM IN THE CONTRACT IS DENOTED IN BOLD. EXISTING CONDITIONS TO F-1 ADC REMAIN ARE DENOTED UGH7LY. UNLESS EQWPMENT. DEVICES, ETC. TO BE REIIOVEDTED OTHERWISE. BOLD ITEMS INDICATE �J� _ I ! 6ti� NUCLEAR I f' WORK NUCLEAR I I I I WORK I 2. PROTECT STRUCTURE AND OWNER EQUIPMENT FROM DAMAGE. IMMEDIATELY REPLACE OR ����� 0 .. MEDICINE FILE RM MEDICINE .�` •• • OFFICE 7 EXAM OFFICE I C E REPAIR, TO OWNAL CONDITION, DAMAGE CAUSED BY THE CONTRACTOR VNETHER 1-1 1 12 ROOM EQUIPMENT APPEARS M BE CURRENTLY IN USE OR NOT, UNLESS WRITTEN = MGR. (ON I 1A1-35,37 MGR- AUTHORIZATION FROM THE OWNER INDICATES OTHERWISE. PREPARE LISTING OF ALL 9 8 (OT `�9 -19,21.23 EXISTING DAMAGED ITEMS AND SUBMIT TO OWNER PRIOR TO BEGINNING WTIJRIC. Y • z WP F 3. DOSING INFORMATION SHOWN ON THE DRAWINGS HAS BEEN TAKEN FROM OWNER yew= f r .__-- -_ J i -- -- ' J FURNISHED DRAWNGS AND/OR UMIIED FIELD OBSERVAIONS. CATOR, RUMA k 0 o - ASSOCIATES IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY INFORMATION OR THE ��sy '•• '• � 8 ADEQUACY, SAFETY AND CONFORMANCE TO CURRENT PREVAIUNG CODES OF ANY WORK z SHOWN AS EMNG ON THESE DRAWINGS. TOIL. . I ;� TOIL. I DRAWING TITLE 2 2 4. DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM TO BE DEMOLISHED. CONTRACTOR ;" f<'ECH. 10� MECH_ 1 l TR A 10 L C T I ; . } J L TR A C T I K KE SHALL VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION ;OUND SCAN I F OOM =.t 8 SOUND SCAN I ROOM 1978 TO FACNJTAIE ALL WORK INDICATED BY THE CONTRACT DOCUMENTS PRIOR TO 1 36 131 136 \ 131 QUOTATION. NO EXTRAS WALL BE ALLOWED FOR WORK REQUIRED TO ACHIEVE THE END H TRENCH-, – - TRENCH 7 RESULT AS INDICATED BY THE CONTRACT DOCUMENTS, REWORK DOSING TERMINATKINS, PR �� — — CONTINUITY TO EXISTING WCIRCUIITS AND DEWES TO REMAIN OR BETRELOCATED. PRIOR T�-iRAGE WAIT )NS CT �' WAIT C ONSO LE CT TO COMMENCEMENT OF ANY DEMO WORK, CONFIRM EXISTING CONDITIONS AND NOTNFIf TORAGE ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION. COMP- rw� 134 135 I COMP. 5. ALL ITEMS IDENTIFIED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY I a 33 — -- L_LE INCLUDING ALL WIRING AND EXPOSED CONDUIT AND CONDUIT SUPPORTS BACK TO POINT 1918- 1978 OF OIRIGMN OR NEXT DEVICE TO REMAIN, REMOVED ITEMS SHALL BE TURNED OVER TO eOIINEP— REMOVE FROM N SITE AND LEGALLY DISPOSE OF ALL 17EM THE EEOOWNER CHOOSES • e T NOT_— - 6 NOT TO ACCEPT. 0 T -- DHM-13.15,17 6• WHERE EXISTING CONDUITS ARE SHOWN TO BE REMOVED AND HAVE BEEN ROUTED IN BL1A1-40,42 PG-BL1A1-36,38 CONCRETE FLOOR SLABS, CONCRETE WALLS OR CONCRETE CELINGSa THEY SHALL BE CUT BACK FLUSH WITH CONCRETE. FILL WITH GROUT TO ACHIEVE A SMOOTH AND EVEN Cr 0 C R I D OR I ( FINISH FLUSH WITH CONCRETE SURFACE AFTER CONDUCTORS HAVE BEEN REMOVED. O CORRIDOR � ��� � O 1`9 129 7. REUSE EXISTING CONDUIT WHERE CURRENT NEC AND LOCAL CODE REQUIREMENTS ARE ,�� � MAINTAINED. PROVIDE NEW OOPDl11T MID WIRE FOR NEW NSTALLA710NS MD EXTENSION J OF EXISTING INSTALLATIONS. REUSE EXISTING CONDUIT IN PLACE, DO NOT REINSTALL 0 — — — — -- — — — I EXISTING CONDUIT. PROVIDE LABELING PER SPECIFICATIONS FOR REUSED CONDUIT. I I S. WHERE DOSING DEVICES, STITCHES. MOTOR CONNECTIONS, ETC. ARE TO BE REMOVED NURSERY I ECH. RECLINER I RECLINER RECOVER IJURSER'7 I ECH. I RECOVERY FROM WALLS WIMGH ARE REMAINING, WALLS SHALL BE PATCHED TO MATCH ORIdNAL � Q PJU,RSERI' 113 130 NU SERY 113 130 FINISH. BLANK COVERPLATES OVER DOSING BOXES ARE NOT ACCEPTABLE. UNLESS R i Fk 101 RY RK 101 NOTED OTHERWISE. LL J N n 9. A DETAILED WRITTEN METHOD OF PROCEDURE IS REQUIRED WHEN A CONSIRUCTKIN LL ACTIVITY OR AN OUTAGE AFFECTS THE SAFETY OF OCWPANTS, TELEPHONE/I)ATA/EIRE J Q v ALARM EQUIPMENT OR COMPONENTS OF ANY SYSTEM WHICH SUPPORTS THIS EQUIPMENT Q OR ESSENTIALLY AFFECTS THE BUILDING MANAGEMENT, OPERATIONS OR SECURITY. SEE W SPECIFICATIONS FOR ADDITIONAL INFORMATION. 10. COORDINATE SEQUENCE OF WORK TO FOLLOW MECHANICAL PHASING PLAN. ICE o PARTIAL FIRST FLOOR POWER DEMOLITION PLAN PARTIAL FIRST FLOOR POWER PLAN n n__ N SCALE. 1/8"=I'-O" SCALE: 1/8"--l'-O" TITLE r M M Z POWER PLAN NOTES. o d = 1. MAKE ALL FINAL ELECTRICAL CCINNECTK)NS TO EQUIPMENT REQUIRING ELECTRICAL � Lj, , ,_1 , CONNECTION. 1HS SHALL INCLUDE BUT NOT BE LIMITED TO ALL MECHANICAL AND 12331 ❑F E I f E OTHER EQUIPMENT INCLUDED N THIS PROJECT. 233 N 2. PROVIDE FUSES SIZED PER EQUIPMENT MANUFACTURER'S REQUIREMENTS. o� CID 3. DISCONNECT SWITCH LOCATIONS ARE SHOWN DIAGRAMMA71CALLY AND SHALL BE S INSTALLED IN ACCESSIBLE LOCATIONS TO SUIT EQUPMENT AND SPACE. DISCONNECT SWTCiES SHALL BE WITHIN SIGHT OF THE EQUIPMENT THEY SERVE AND MOUNTED AT 6'-3•, MAXIMUM. TO TOP OF CABINET. MAINTAIN NEC WORK SPACE REQUIREMENTS. � o 4. COORDINATE EXACT REQUIREMENTS AND LOCATIONS OF MECHANICAL EQUIPMENT WITH o MECHANICAL DRAWINGS AND MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. u Z g U I<AGIE P Q ro T❑ 0 >333 D W \ SUSPENDED 0 TRANSFORMER SWITCHBOARD PANEL "PG-13L1A1" T 'DHA" LIGHTING CONTROL PANEL uj PANEL "PG-DHM' i v co > J n_ > U ] ELECT. -- REVISIONS: -- A06-26-06 PANEL "EMCC" DATE: 03-29-06 DRAWN BY: JH CHECKED BY: MAV JOB NO: 2006-053.- FILE NAME: P-PWR1 PARTIAL SECOND FLOOR POWER PLAN SHEET NO. SCALE: 1/8"=I'-O" E3mOl KEY PLAN Cator, Rumo & Assoc. FlLENAME:P:\VVMC\2006-053 VVMC CT SCAN\CAD\ELEC\P-PWRI.DWG - E3.01 PLOT: 07/05/2006 0 1:21pm REV.- 06/27/2006 CAD: georgie XRER bgl.dwg tb.dwg pwrl.dwg bg2.dwg pwr2.dwg keyplan.dwg PRINCIPALS CATORRUMA6ASSOCIATES, CO. AEI.A.ME JOHN A.HUGHES S CONSULTING MECHANICAUELECTRICAL ENGINEERS JOHN BRUCE E.AEPIA. JAMES R.LA7.ZERI MARCUS A.VALERIUS May 16, 2006 SENIOR ASSOCIATE MARK V.JELINSKE ASSOCIATES SEAN'P.�ANVERY GERARD W.O`BRIEN Mr. Chris Gunnion DENNIS F.RLIDKO WAYNE:I;RADER Town of Vail Department of Community Development Building Safety and Inspection Services 75 South Frontage Road Vail, CO 81657 RE: Vail Valley Medical Center CT Scan CRA#2006-053 Dear Mr. Gunnion: Please consider the calculation provided below to show compliance with the 2003 International Mechanical Code for the amount of refrigerant per occupied space on the project referenced above. Volume Calculations per 1104.3 and 1104.4: Volume of communicating space: 5,202 cu. ft. Volume of refrigerant in a single independent circuit: 134 oz. = 8.375 lbs. 8.375 lbs./5,202 cu. ft. or 1.61 lbs./1,000 cu. ft. Code allowable volume of R-22 per Table 1103.1: 5.5 lbs./1,000 cu. ft.. Reduction of control volume by 50%per 1104.21: 2.251bs./1,000 cu. ft. Conclusion: 1.61 lbs./1,000 cu. ft. is less than the maximum allowable volume of 2.25 lbs./1,000 cu. ft. If you have further questions regarding this issue, please contact me at the office. Sincerely, CATOR,RuMA&ASSOCIATES,Co. ,yu��titltlJal���ae g0000000 0 ,.�,✓ 10 Wayne A. Trader, P. E. �am°' �,�+' W AT/mah z a. P:\VVMC\2006-053 VVMC CT Scan\Sup\Docs\2006-0531tr(CG).0516.06.doc � „� cc: Ryan McGill, Vail Valley Medical Center ®o° File- CATOR,RUMA&ASSOCIATES �y�,, �s/ON oL���?� ,, By: Mail f,ylrAttasti�sd`�� 1550 DOVER STREET•SUITE 2•LAKEWOOD,COLORADO 80215-3132 PHONE(303)232-6200•FAX(303)233-3701 •E-MAIL:cra @catorruma.com PRINCIPALS CATOR,RUMA 6 ASSOC FATES, CO. MICHAEL A.ME CONSULTING MECHANICAIJELECTRICAL ENGINEERS JOHN A.HUGHES S BRUCE E.APPEL JAMES R.LAZZERI MARCUS A.VALERIUS May 16, 2006 SENIOR ASSOCIATE MARK V.JELINSKE A.SSLV,'ATES SEA;`!:i CONVERT' i GERARD W.O'BRIEN Mr. Chris Gunnion Du4NIS F.RUDKO WAYNE A.TRADER Town of Vail ' Department of Community Development Building Safety and Inspection Services #" 75 South Frontage Road Vail, CO 81657 RE: Vail Valley Medical Center CT Scan CRA#2006-053 Dear Mr. Gunnion: Please consider the calculation provided below to show compliance with the 2003 International Mechanical Code for the amount of refrigerant per occupied space on the project referenced above. Volume Calculations per 1104.3 and 1104 4• Volume of communicating space: 5,202 cu. ft. Volume of refrigerant in a single independent circuit: 134 oz. = 8.375 lbs. 8.375 lbs./5,202 cu, ft. or 1.61 lbs./1,000 cu. ft. Code allowable volume of R-22 per Table 1103.1: 5.5 lbs./1,000 cu. ft. Reduction of control volume by 50%per 1104.21: 2.25 lbs./1,000 cu. ft. Conclusion: 1.61 lbs./1,000 cu. ft. is less than the maximum allowable volume of 2.25 lbs./1,000 cu. ft. If you have further questions regarding this issue, please contact me at the office. Sincerely, CATOR,RUMA&ASSOCIATES,CO. RA- A. Ski ii n. � Q0000 Wayne A. Trader P. E. WAT/mah J fie : y T P:\VVMC\2006-053 VVMC CT Scan\Sup\Docs\2006-0531tr(CG).0516.06.doc � °o s/G��LR�. . cc: Ryan McGill, Vail Valley Medical Center � °° ` ° File- CATOR,RuMA&ASSOCIATES k! fi By: Mail 1550 DOVER STREET•SUITE 2•LAKEWOOD,COLORADO 80215-3132 PHONE(303)232-6200•FAX(303)233-3701 •E-MAIL:cra @catorruma.com