Loading...
HomeMy WebLinkAboutF16-0031_FP1_1478903087.pdf47 heads for Unit B 18 heads for lower level 17 heads for main level 12 heads for upper level 2ND UNIT MAIN LEVEL FLOOR PLAN FINISHED FLOOR 8162' - 0" ROOF PLAN 8186' - 0" 2ND UNIT UPPER LEVEL FLOOR PLAN FINISHED FLOOR 8174' - 0" 2ND UNIT LOWER LEVEL FINISHED FLOOR 8150' - 0" PRIMARY UNIT LOWER LEVEL FINISHED FLOOR 8147' - 6" PRIMARY UNIT MAIN LEVEL FINISHED FLOOR 8159' - 6" PRIMARY UNIT UPPER LEVEL FINISHED FLOOR 8171' - 6" 1 2 3 4 5 6 7 8 9 10 11 BEDROOM #2 210 BATHROOM #2 211 BEDROOM #3 214 KITCHEN 115 UNIT A ENTRY 112 POWDER 120 MASTER BATHROOM 118 GAME ROOM 016 BAR 017 BATHROOM #4 024 KITCHEN 101 LIVING ROOM 103 BAR 002 CLOSET #3 006 W.C. 005 PROPOSED FUTURE PROPERTY LINE EXISTING GRADE SIM CURVED LED LIGHTING COVE 6 16 16 5151 Bannock St. Denver, CO 80216 303-291-1012 303-383-5023 FAX firesprinkler@afssco.com A FIRE SPRINKLER DESIGN COMPANY ACCEPTING THIS COPY IS DEEMED AS AGREEING TO THE FOLLOWING: THIS DRAWING COPY, ITS CONTENTS, INFORMATION AND PRINCIPALS OF DESIGN ARE THE EXCLUSIVE PROPERTY OF THE FIRE PROTECTION CONTRACTOR LISTED AND MILE HIGH DESIGN GROUP, LLC AND IS BEING SUBMITTED TO YOU WITH THE UNDERSTANDING THAT IT IS NOT TO BE REPRODUCED, COPIED OR MODIFIED IN ANY MANNER; NEITHER SHALL IT BE RELAYED IN WHOLE OR IN PART TO ANY OTHER INDIVIDUAL OR FIRM FOR ANY OTHER PROJECT OR EXTENSION OF THIS PROJECT EXCEPT THRU WRITTEN AGREEMENT WITH THE FIRE PROTECTION CONTRACTOR AND MILE HIGH DESIGN GROUP, LLC. ERRORS AS A RESULT OF THIS FILE BEING ELECTRONICALLY TRANSMITTED ARE BEYOND THE CONTROL OF AND ARE NOT THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR OR MILE HIGH DESIGN GROUP. MILE HIGH DESIGN GROUP IS NOT RESPONSIBLE FOR INSTALLATION OR INSPECTION OF WORK INSTALLED. THESE PLANS ARE DIAGRAMMATICAL ONLY. ON SITE COORDINATION MUST BE ARRANGED WITH ALL OBSTRUCTIONS, i.e.: MECHANICAL, ELECTRICAL, AND STRUCTURAL. ANY ALTERATIONS FROM ENGINEERED DRAWINGS MUST BE APPROVED BY MILE HIGH DESIGN GROUP. MILE HIGH DESIGN GROUP IS NOT RESPONSIBLE FOR LAYOUT DESIGN ISSUES OR CONFLICTS WITH ANY OBSTRUCTIONS. IF ADDITIONAL FIRE SPRINKLER PIPING AND/OR FIRE SPRINKLER HEADS ARE REQUIRED THIS WILL BE THE RESPONSIBILITY OF THE FIRE SPRINKLER CONTRACTOR. ALL CHANGES MUST ME APPROVED BY MILE HIGH DESIGN GROUP, LLC THE OWNER IS RESPONSIBLE TO PROVIDE SUFFICIENT HEAT THROUGHOUT THIS BUILDING TO PREVENT FREEZING OF WATER IN THE FIRE SPRINKLER SYSTEM - MIS-REPRESENT THE EXACT LAYOUT OF THE LAYOUT & CALCULATIONS. AID THE AUTHORITY HAVING JURISDICTION WITH SPRINKLER SCHEMATIC MAY IN SOME CASES SPRINKLER SYSTEM. IT IS INTENDED TO HELP 3 heads T/S T/S SCALE: 1/8" = 1'-0" PLAN NORTH FIRE SPRINKLER PLANS 1 2 3 4 5 6 7 8 9 10 SECTION A approved for install Vail Fire & Emergency Services 06/28/16