HomeMy WebLinkAboutprint_page_05-05-2016_572b9b8b5b4c0-0.pdfPERMITS MANAGEMENT
Create New Inspection:
Project: Rende Electrical 2016
Select options Create Go to Main Inspection Grid
1 +
1 +
1 +
Inspections
Checklist Edit Info Schedule Inspection
Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0075
Parcel
Checklist Edit Info Schedule Inspection
Electric UFER (Electric UFER (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0075
Parcel
Checklist Edit Info Schedule Inspection
Rough Electrical (Rough Electrical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0075
Parcel