Loading...
HomeMy WebLinkAbout165 Forest Road .Right of way permit for 5-9 and 5-10.pdf • MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR RIGHT OF WAY USE-STREET CUT PERMIT Town of Vail SL; : Public Works Dept Parcel=: 1309 Elkhorn Dr Bldg Permit : B - • Vail,CO S I b37 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use- Street Cur Permit and forfeiture of application fees. By signing this permit,the applicant declares he'she has read all contents of this document,TOWS]of Vail Roadway Standards and chapters of Title S—Public Ways and Property,of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Application Fee:$100.00 • Company Name: 5hneccer #yde compPhone: vat. t. $15r p Q City/State) Company Address: I PD I..YJ_y 37-5 zp: d UQ Ca (J�Q/�53 Contractor �,,}d License itiumbea: [ 111 Email: t3id o C Skte.(�'dy et Contact Name: O c' 1` 119 ContaPhonect l `o- 37 -ag8 ROW Use Location: bc;iei oa • Requested ROW fes( -13 13 Requested r Use Dates: -J ! to :-Work Times: 700 1. 50 P Purpose for Request: Street Cut Dimension(if applicable): ❑ Underground Utility Installation • ❑ Landscap ng Length: • O Temp Site Access Construction Staging Width(min 4'): • /0 Roadway Construction • • ❑ Other(explain): Total Square Footage: Requested ROW Use: D4).5•6'wib/ foL,Jer .c../0/1e- • ❑ Single Lane Closure-ift of closure(including taper) Two Lane Closure-- lft of closure(including taper) ❑ Three Lane Closure-lft of closure(including taper) •• • ❑ Sidewalk/Bike Path-Ift of closure • ❑ Other(explain): 1. Applicant shall submit a traffic control plan, and work site/staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections,advanced warning signage, taper lengths,buffer space and work zone dimensions. No full street closures are allowed. 2. Applicant must contact Public Works Department at 479-2198.24 hours prior to commencing of work. Failure to no-Jfy the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site,applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Enery (800-922-1987) Qwest(800-922-1987) Comcast(800-922-1987) Holy Cross Electric(800-922-1987) • Eagle River Water&Sanitation District(970-477-5453) Town of Vail Electric(970-479-2158) Town of Vail t '_anon(970-479-2158) • Print Appli:ant Name Applicant Signature Date F:'PW:EneineerinePW Permit FormsTublic Way Pcrmit'.ROW Application-2008_doc MUST BE SUBMITTED MN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR • RIGHT OF WAY USE-STREET CUT PERMIT • P R174: •• PW-: Town of Vail • Parcel-. Public Works Dept Bldg Permit T: B 1309 Elkhorn Dr • Vail,CO 81657 WARNING: lrclusion of false information in this permit application establishes an automatic denial for a Right of Way Use- Street Cut Permit and forfeiture of application fees. By signing this permit,the applicant declares he'she has read all contents of this document,Tonal of Vail Roadway Standards and chapters of Title 8—Public Ways and Property,of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees_ Application Fee: S 100.00 • p 5h�e ie� �Irde PhoneCornp: {7d s £15- 565c, Company slam?: j Po K 37 City/Stte/Company Address: ./ Zip VQ it t.C3653 • Contractor 1/0q1 License Number: Email: odd y e gie..freflycle‘con O c/ /' 01 Contact q70_ J! `IO/& Contact Name: Phone: ROW Use Location: - /65 io to 7 Za c' Requested ROW 64p Requested q f _ Use Dates: . 6 /0 17 to 5-/0-17 `-�Work Times: / 6o3 IF3l L�,t Purpose for Recuest: Street Cut Dimension(if applicable): ❑ Undergrot.nd Utility Installation • pp ❑ Landscaping Length: ❑ Temp Site Access XConstruction Staging Width(min 4'): - ❑ Roadway Construction ❑ Other(explain): Total Square Footage: Requested ROW Use: I Single Lane Closure—lft of closure(including taper} ��dG�l frcll�'v�d �� ❑ Two Lane Closure— lit of closure(including taper) • • ❑ Three Lane Closure—lft of closure(including taper) • • ❑ Sidewalk/Bike Path—lit of closure •• ❑ Other(exp air): I. Applicant shall submit a traffic control plan,and work site/staging plan with this application. Traffic Control Plar,shall be in compliance with the MUTCD and shall show streets with names,adjacent intersections, advanced warning signage,taper lengths,buffer space and work zone dimensions. No full street closures are allowed • 2. Applicant must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. • 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the project site, applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Emery (800-922-t987) Qwest(800-922-1987) Comcast(800-922-1937) Holy Cross Electric(800-922-1937) Eagle River Water&Sanitation District(970-477-5453) Town of Vail Electric(970-479-2153), Town of Vail I anion(970-479-2158) ; ,4 70,/: 5-- Y;.� • Print Applicant Name Applicant Signature Date F_.PW:EngineerinmPw'Permit Fonus'Public Way PennifROW Application-2008_duc • IHLAEFFEr. HYDE CONSTRUCTION isTABusfrin IN 1979 Notice There will be a two lane closure at 165 Forest Road Tuesday 5-9-17 from 7 :Q0 AM until 6 : 30 PM . This will effect traffic from Rock Ledge to Vail Road . All homes will be accessible by direction of a flagger. Alternate route will be Beaver Dam Road . Sorry for the inconvenience, and thank you for your patience . Todd Mann SHC 376-6188 5 w:11 be 7 ►e Nue. 7114 tAx l l b t. 1tet on 5- 5 cat 5 da/5 dnd ;he rio:ct -4101 ob'i/ bf PoI dV1 7h t ciao S f AcvSe5 ao (0\l'e ? Pcac/