HomeMy WebLinkAbout17-6510 - 303 Gore Creek #12 - Matl Test Reports Ending 170620.pdf June 20, 2017 Subject: Interim Materials Testing Summary, Galvin Residence–303 Gore Creek Drive #12, - Materials Testing – Special Inspections, Town of Vail, Colorado Job Number: 17-6510 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Dear Mr. Marschalk, For the period ending June 20, 2017, representatives of GROUND Engineering Consultants, Inc. were on site to provide materials testing services at times scheduled by the Contractor, Subcontractor and/or Owner. Our reports have been completed in the field as our testing and observations were performed. The Contractor and applicable Sub Contractors were notified of the testing results and/or observations prior to our departure from the project site. This summary report includes the observation reports as well as the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Chris Hutto, CET Construction Services Manager Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 General Comments Field Observation Reports Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Job No: Date: Field Representative: General Comments As scheduled, a representative arrived on-site to perform the below discussed services and we have the following comments. Matty Baldwin 17-6510 June 13, 2017 ***CANCELLED OR RESCHEDULED VISIT*** Upon arrival we were notified by Justin Marschalk with SRE Building Associates that our services were not needed at the scheduled time. Future testing will be scheduled with our office. Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 Concrete Field Observation Reports/ Compressive Strength Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor:General Contractor Rep. Notified:Rep Notified Job Number Concrete Cover Report Date:Date Job Number:Job NameApril 11, 2017 17-6510 SRE Justin 4 1 Chris Leeper Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified Report Date:Date Job Number:Job Name General Contractor:General Contractor Rep. Notified:Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F)(pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 9, 2017 17-6510 April 11, 2017 SRE Justin Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 8 Cloudy, 40's Pump Vibration Foundation footings Foundation footing along west wall, 5' to 15' N of SW corner and north wall footing 3,000 N/A 4 +/-1 50-90 7 35' N, 5' W of SE corner of lower level 43 309845 12:41 pm 2:10 pm 5 1.8 65 142.7 0 309845 4 5062 4.00 12.57 52,540 4,180 4/18/17 7 5 4.00 12.57 67,100 5,340 5/9/17 28 5 4.00 12.57 69,410 5,520 5/9/17 28 5 4.00 12.57 65,710 5,230 5/9/17 28 5 5,360 Chris Leeper Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor:General Contractor Rep. Notified:Rep Notified Job Number Concrete Cover Report Date:Date Job Number:Job NameApril 19, 2017 17-6510 SRE Justin 4 1 Chris Leeper Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified Report Date:Date Job Number:Job Name General Contractor:General Contractor Rep. Notified:Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F)(pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 17, 2017 17-6510 April 19, 2017 SRE Justin Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 10 Cloudy, 40's Pump Vibration Foundation walls Foundation walls along west wall, 5' to 15' N of SW corner and north wall footing 3,000 N/A 4 +/-1 50-90 8 10' S, 5' W of NE corner of lower level 46 309924 9:44 am 11:15 am 4 1/2 2.2 70 143.1 0 309924 4 5075 4.00 12.57 54,020 4,300 4/26/17 7 5 4.00 12.57 73,810 5,870 5/17/17 28 5 4.00 12.57 72,100 5,740 5/17/17 28 5 4.00 12.57 72,190 5,740 5/17/17 28 5 5,780 Chris Leeper Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Results within Specifications? Reinforcing Steel Checked? Subgrade Tested? Number of Cylinders Cast this Date: Number of Pages Attached: Field Representative: Yes No Not Applicable As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each sample are approximate. General Contractor:General Contractor Rep. Notified:Rep Notified Job Number Concrete Cover Report Date:Date Job Number:Job NameMay 3, 2017 17-6510 SRE N/A 4 1 Chris Leeper Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Cylinders Cast on Ticket Number: Total Number of Cylinders Cast: Cylinder Diameter (in.) Cross Sectional Area (sq. in.) Maximum Load (lbs.) Compressive Strength (psi) Test Date Test Age (days) Fracture Type Average 28-Day Compressive Strength (psi): Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified Report Date:Date Job Number:Job Name General Contractor:General Contractor Rep. Notified:Rep Notified Placement Date: Job Number Placement Method: Finish Method: Item Number /Structure Type: Concrete Supplier: Mix Identification: Total Cubic Yards Placed: Weather/Temp.: (°F)(pcf) Placement Location: Specifications Specified Strength (psi): Air Content (%): Slump (in.): Temperature (°F): Concrete Field Properties Test No.Sample Location Truck Number Ticket Number Batch Time (gal.) Test Time Slump/ Spread C143 Air Content C231 Conc. Temp. C1064 Unit Weight C138 Water Added (inches) (%) Compressive Strength Results (ASTM C39) Laboratory ID: Field Technician: Comments: May 31, 2017 17-6510 May 3, 2017 SRE N/A Hendrick Rogelio Casey 7.0 3/8 F 70/30 2" 6.5 Cloudy, 50's Pump Vibration Foundation footing Unit 11 north foundation footing and east wall footing 3,000 N/A 4 +/-1 50-90 9 3' E of NW corner of Unit 11 146 310080 10:16 am 11:30 am 5 1.7 63 144.4 6 310080 4 5103 4.00 12.57 45,810 3,640 5/10/17 7 3 4.00 12.57 68,100 5,420 5/31/17 28 5 4.00 12.57 67,640 5,380 5/31/17 28 5 4.00 12.57 69,100 5,500 5/31/17 28 5 5,430 Chris Leeper Concrete arrived 30 minutes late. Galvin Residence – 303 Gore Creek Drive, Unit 12 - Materials Testing/Special Inspection Town of Vail, Colorado Job #17-6510 GROUND Engineering Consultants, Inc. Period Ending 6/20/2017 Soils: Waterline Field Observation Reports Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 Comments or Photos: Outstanding Discrepancies Reported this Date? Density / Moisture Nuclear Gauge Number: Standard Counts: No. of Samples Collected: Lab Sample Location: Lab Sample Location: No. of Pages Attached: Field Representative: Soil Cover Report As scheduled, a representative visited the project site to perform soil moisture and density testing and/or obtain samples for laboratory testing. The locations and elevations of each test are approximate. The results reported represent the material at each test location at the time of testing. No Date: Job Number: General Contractor: Rep. Notified: Date Yes June 14, 2017 17-6510 SRE Building Associates Justin Marschalk 63 2041/704 0 N/A N/A 1 Matty Baldwin Client: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum 303 Gore Creek Drive, Unit 12 Mr. Justin Marschalk SRE Building Associates PO Box 6376 Vail, CO 81658 to Standard Proctor Field Technician:Modified Proctor Comments: of Optimum Moisture ContentSpecifications: Min. % Max. Dry Density and from Nuclear Soil Density and Moisture Content Test No.Test Location Elevation Field Wet Density Field Dry Density Field Moisture Content Proctor Max Dry Density Proctor Optimum Moisture Comp- action Pass or Fail Soil Type (feet) (pcf) (pcf) (%) (pcf) (%) (%) Equipment Utilized:Equipment Utilized Area Represented: Area represented Earthwork Contractor:Earthwork Contractor Rep. Notified:Rep Notified Date:Date Job Number:Job Name General Contractor:General Contractor Rep. Notified:Rep Notified Job Number Report Type: June 14, 2017 17-6510 Waterline Backfill SRE Building Associates Justin Marschalk Ewing Trucking & Construction Rigo Excavator, Sheeps foot roller, jumping jack 10' S of front door to waterline tie-in 95 -2 +2 1 4' N of waterline 8' BG 137.1 127.8 7.3 134.4 6.8 95.1 Pass Class 6 2 5' N of waterline 6' BG 136.1 128.3 6.1 134.4 6.8 95.5 Pass Class 6 3 6' N of waterline 4' BG 136.9 129.3 5.9 134.4 6.8 96.2 Pass Class 6 4 5' N of waterline 2' BG 135.7 128.5 5.6 134.4 6.8 95.6 Pass Class 6 Matty Baldwin