HomeMy WebLinkAboutpermit fee worksheet.pdf Permit Fee Worksheet
ROW Use(min 550)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lit of Closure
Single Lane $ 0.15 x x = $
Two Lane $ 0.45 x 5 x 100 = 5 225.00
Three Lane $ 1.50 x x = $ -
SidewalklBike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = S -
Fee _ Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x , x = S -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x i X = S -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee r Das Sqtt of Closure
Core Areas Heated Streetscape $ 0.50 x x I = $ -
Sub-total S 225.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 650 = $ 195.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface _ Fee Sqftof Cut_
ACC/PCC 5 8.00 x = $ -
Brick Paver $ 15.00 x = S -
Pothole(each) $ 200.00 x = S -
Non-Paved Surface $ 0.25 = $ -
Sub Total $ 195.00
Applicationllnspection Fee S 100.00
Total Permit Fee $ 520.00 ?4G/I t-G_
VE- \S;(de5
30 $ 66Cif N-.
gat,),
"P
F IPW1SpecificatiorisTIOWY Standards1Permrt Fee Worksheet s/s 6.-0 /` 11 2 0 /' / i (Pc-.V , O d
2 � vc�
O 4 / L Co�- I. = �� S 74-
' t
Qrt ---7 7�r 0 v
f _•