Loading...
HomeMy WebLinkAbout716 Forest Road permit worksheet.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Da Lft of Closure Single Lane $ 0.15 x x = $ - Two Lane $ 0.45 x 5 x 500 = $ 1,125.00 Three Lane $ 1.50 x x = $ - SidewalklBike Path $ 0.15 x x = $ - Fee Months Sgft of Closure Paved Surface $ 0.25 x x = $ - Non-Paved Surface $ 0.05 x x = $ - Fee Weeks Sgft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Da Lft of Closure Single Lane $ 1.00 x x = $ - - Two Lane $ 3.00 x x = 5 - Three Lane $ 6.00 x x = $ - Sidewalk/Bike Path $ 0.50 x x = $ - Fee Months _ Sqft of Closure Paved Surface $ 1.00 x x = $ - Non-Paved Surface $ 0.20 x x = $ - Fee Da Sgft of Closure Core Areas Heated Streetscape $ 0.50 x I x . = $ - Sub-total $ 1,125.00 Street Cut(min$50) Non-Moratorium Streets Surface Fee Sgft of Cut • ACC/PCC $ 0.30 x 324 = $ 97.20 Brick Paver $ 1.00 x = $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05 = $ - Moratorium Streets Surface Fee Sgft of Cut ACC/PCC $ 8.00 x = $ - Brick Paver $ 15.00 x = $ - Pothole(each) $ 200.00 x = $ - Non-Paved Surface $ 0.25 = $ - Sub-Total $ 97.20 Application/Inspection Fee $ 100.00 Total Permit Fee $ 1,32220 1 // 0/108 f R J- -14 44 ge040 — 1 x /0 :.- 31(( A is 3 'LW, D0 F IPNhSpecdicalion5 Rb WY SfandardslPertnit Fee Warksheel.xls 1 t f 1 B-I-I ./-/" "� 7 2- IV �+ ° �fl