Loading...
HomeMy WebLinkAboutPEC140022_sscv - Utility Approvals_1412266740.pdf Sam Bogash From: Roussin - CDOT, Daniel <daniel.roussin@state.co.us> Sent: Friday, September 19, 2014 3:46 PM To: Sam Bogash Subject: Re: Utility Verification Sign off Sam - I have no comments. thanks Dan Roussin Permit Unit Manager Traffic and Safety P 970.683.6284 I F 970.683.6290 222 South 6th Street, Room 100, Grand Junction, CO 81501 daniel.roussin@state.co.us I www.coloradodot.info I www.cotrip.org On Fri, Sep 19, 2014 at 1:53 PM, Sam Bogash <sam khwebb.com>wrote: Hello, Could you please review, and sign off. Please let us know if you have concerns. Thank you! Sam Sam Bogash From: Roussin - CDOT, Daniel <daniel.roussin@state.co.us> Sent: Monday, September 22, 2014 9:07 AM To: Sam Bogash Subject: Re: Utility Verification Sign off Email is good enough. thanks Dan Roussin Permit Unit Manager Traffic and Safety 0 P 970.683.6284 I F 970.683.6290 222 South 6th Street, Room 100, Grand Junction, CO 81501 d,-anieell.roussin®state.co.us I www.coloradodot.info www.cotrip.org [ i On Mon, Sep 22, 2014 at 8:58 AM, Sam Bogash <sam(ci@khwebb.com> wrote: Thank you! Can you please sign off on the form? It was not attached. From: Roussin - CDOT, Daniel [mailto:daniel.roussinC&state.co.us] Sent: Friday, September 19, 2014 3:46 PM To: Sam Bogash Subject: Re: Utility Verification Sign off Sam - I have no comments. thanks 1 UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP 702 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. 1` `, 1-rel c, 13 Fait -J Subject Property Address:5q�' uG1�1 J4\\e1 f NVQ_ _Lot— g R. Subdivision:V x 1 v i t in Slie Primary Contac / er epresentative:mm\..Q_ U),\GO)< Phone: q7/-1411-21 4) Plans Dated: 1 1111E Primary Contact/Owner Representative Signature Authorized Sianature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon jcel lv.mcclernonacentuiviink.com XCEL HIGH PRESSURE GASRJ/ 970.406.1784(tel) /" nC29' '� �'I • ./C 970.468.1401(fax) j /, i Contact:Remington Baker � N l C-crl-( (e, . reminoton.c.bakerCaxceleneroy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081(fax) Contact:Jeff Vroom jvroom aDhoivcross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts:Pam McGuire pamela.mcouirei xcelenergv.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845,7218(fax) Contact:Tug Birk tblrkeerwsd,orq COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael lohnson(a cabie.comcast.conl CDOT(Only In CDOT Right-of-way) 970.683.6284(tel) Contact:Dan Roussin Daniehroussinndot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2, A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It Is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for i re-approval&re-verification If the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan. including grading plan,floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. ''Trac.- 0 F-iiin 1 1 Subject Property Address:5 g \o 1 VA112y 1)01e. ..um— Week- Subdivision:V�'1 VII\a Primary Conta / er epresentative: 610‘...k_.lL;\ GOA Phone: q3,_(412. 'O Plans Dated: 1 tram Primary Conta Owner Representative Signature • Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon kelly.mcclernon(alcenturvlink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact:Remington Baker remington.c.baker@xceleneray.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081(fax) Contact:Jeff Vroom jvroomeholvcross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts:Pam McGuire pamela.mcauiren.xcelenergv.com EAGLE RIVER WATER&SANITATION . DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk(a erwsd.orq COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Nuchae/Johnson9-19-14 Contact:Michael Johnson good to proceed Michael iohnsonfa cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact:Dan Roussin Daniel.roussinndot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan, and elevations,shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. !' `, A- -ya 8 *143n 1 Subject Property Address:5q2 \Ai % VQ1� i 2+� t r�V e. ..Let- Meek- Subdivision:Va`\ V t tic(sie Primary Conte / erir(A epresentative: , __. L) GOC Phone: q7 -X11 21130 Plans Dated: 1�1 I iPrimary Conta Owner Representative Signature I Authorized Signature Comments Date CENTURY LINK - 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon kel Iv.mcclernonecenturvl ink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact:Remington Baker rem ington.c.baker(axcelenergy.com HOLY CROSS ENERGY ANY AN A 4+FF E++F N' +AFF: N-h '6 :A' N A 6 Date: 970.947.5425(tel) REPAR(-RMANTENAN F' H Y J. ENFF .FA 'V // �/ SHALL BE ATR SK FOR REM F.EF.A FMF N' >THF 970.945.4081 (fax) 7d ,/ MPROVEMENTS IS NOT THE Fr F N t.'r F h ,r,: 2014.09.24 Contact:Jeff Vroom I, D' ENERGY CROSS ENIERGY SPEC F CAT ONSCONGERN NG THE ARE 17:28:32 jvroornaholvcross.com EOWPMENT SCREEN'NG AND CLEARANCES SHALL SE FOLLOWED OV OOr TO ALLOW PROPER AND SAFE ACCESS TO TH S TRANSFORMER XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts:Pam McGuire pamela.mcauireexcelenergv.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirkCalerwsd.orq COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael iohnsonC'a cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact:Dan Roussin Daniel.roussinedot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date. HOLY CROSS ENERGY ENGINEERING DEPARTMENT 3799 Highway 82 - P.O. Box 2150 Glenwood Springs,Colorado 81602 (970) 945-5491 EQUIPMENT SCREENING SPECIFICATIONS All proposed designs or proposed alterations to existing screens shall comply with the following specifications. Proposals (plans and specifications)shall be submitted to the Holy Cross Energy Engineering Department for written approval prior to construction. Compliance and approval shall be the sole determination of the Holy Cross Energy Engineering Department. Noncompliance with these specifications or failure to gain written approval, shall result in the denial of a permanent meter connection or the dismantling of nonconforming screens. Appendixes I ands are examples of suggested equipment screens. General Specifications: 1. Holy Cross Energy shall not be liable for any damage to screens. 2. Screen construction and maintenance shall be the responsibility of parties other than Holy Cross Energy. 3. The area inside the screen shall be kept clean. There shall be no material of any kind stored inside the screen. 4. Holy Cross Energy equipment will be installed in accordance with Holy Cross Energy installation specifications. Design Specifications: 1. All equipment shall be readily accessible by Holy Cross Energy personnel. 2. All construction shall be permanent in nature and shall not interfere with operation and maintenance of Holy Cross Energy facilities. 3. There shall be a maximum of 10 feet horizontal distance from equipment to nearest vehicle access way to permit removal or replacement of equipment. 4. There shall be a minimum of 10 feet level, unobstructed, horizontal distance in front of equipment doors for maintenance and operations activities. 5. Water, snow and ice buildup shall be prevented. Proper drainage shall be provided. The area inside the enclosure shall be gravel or concrete. Snow removal by parties other than Holy Cross Energy may be required. Equipment will not be located under rooflines where water, snow or ice buildup and drainage may occur. 6. Equipment shall not be covered in any manner for 15 feet directly above the equipment. If in the opinion of Holy Cross Energy, the size and/or weight of equipment to be installed may present handling problems, additional access and clearance may be required. 7. There shall be no doors or moving parts associated with the screen. * 8. Walls shall be a maximum of six feet in height. 9. There shall be no walls within ten feet of equipment sides having doors. 10. Equipment doors shall be able to open fully. 11. Proper equipment ventilation (minimum four feet from equipment pad) shall be maintained. This may require snow removal by parties other than Holy Cross Energy. 12. Shrubs and trees (in all stages of growth), ornamental decoration, landscaping or any other camouflage shall conform to all specifications. 13. Contact Holy Cross Energy for equipment and pad dimensions. * Doors are discouraged. However, in some cases, such as locations near schools, doors may be approved for equipment screening. Door supports shall be concrete block or concrete. Doors shall be of sturdy construction and open onto an area that is kept free of snow and ice, such as parking lots, driveways, etc. Doors shall have removable hinges and be locked with a Holy Cross Energy lock. If problems develop with door operation, the doors will be dismantled. 8.34 4 70. r/, /.%%r/.%//, % %//,%/// WALL 4'MINIMUM 10'MINIMUM 10'MINIMUM UNOBSTRUCTED TRANSFORMER UNOBSTRUCTED -- HORIZONTAL /': HORIZONTAL DISTANCE !/ DISTANCE 4'MINIMUM NOTE: WALL HEIGHT 6'MAX. r 10'MAXIMUM TO VEHICLE ACCESSWAY TOP VIEW • •. e• e VEHICLE ACCESS WAY • . •° • • 3 •. . e. e • - • • a •e • e • . • e ° . • . . .. e• .e • . , MAXIMUM WALL HEIGHT IS 6' I1 1`1 r 1111 t I '111 1111'r lrJ 11�11�I 1 1 11' 1 1� t1:11,11,]: 1((l`(111�11I11 7 L11(1J111C�1'1' '1�1 l I TI 1 I'1'1 1 I T 1 )'111117 'f' 111 1111 I111111r1 1' I1 l1111111 J11 1 111'1 11111 , 1 1 1 I 1 111 1 1111 1 1 1 1 1 1 1 I I l 111 11 Il 1111/111 1L11111 IIIII II I1 I L I I:I 7 71I 11111 Ifl'I (1 11IIfL I1J1 111 t ,fI I 1 1 10'MINIMUM ��������r r���M �n���I UNOBSTRUCTED gra=In �m �j���IM i��I.AMA HORIZONTAL ' DISTANCE Tuncnarvirmrn i 1 •-: f^""^ 1"1'3 , r ai yrnu�en rnrlrwn rn>rur FRONT VIEW *NOTE: The 10' maximum distance to vehicle accessway requirement may be achieved from equipment sides other than the one shown above. TRANSFORMER SCREEN PAGE# HOLY CROSS ENERGY (Not to Scale) 8.36 ,�/ DATE: 3-15-01 REVISED: NOVEMBER 1, 2011 irrr'/4 " " // /. %r//7.%%rY//,%rr r r N WALL 4'MINIMUM J A DOORS 10'MINIMUM r SWITCH 10'MINIMUM UNOBSTRUCTED GEAR UNOBSTRUCTED HORIZONTAL HORIZONTAL DISTANCE t DISTANCE DOORS 4'MINIMUM NOTE: it WALL HEIGHT 6'MAX. '%%%%U.%i%r/r/%%r/•/i/.%/rir� " 10'MAXIMUM \✓ TO VEHICLE ACCESSWAY TOP VIEW • • ° •' VEHICLE ACCESS WAY • •• • • a• a a • ••a • • MAXIMUM WALL HEIGHT IS 6' '71=47 -I 1 1 1 1 J 1 I 11 41111 rI 11i I Jill'1'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1 1 1 1 1 1 1 1 I 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 II 11 IL' 1 1 1 I I1 I f 1 1 ! I I I I I 11 I 11 I 1 1 1 1 1 1 1 ( I I 1 ! 1 1 I 1 I 1 I I I I 7777 I J1 1 [ 1 1�1 I I ( l 1 I I 11 1 I Z 11 _ J I i7 111 _I1_rLr1�1i 1 1 11 1 I 1 I I 1 I 1! I LI 'I J IL_�_i. I I 7 I l I 1 1 1 I 1 I�Ill LI r '1IIIClI I I_I I II 111111 II t11 I I I 17 1'1111`L �1'T 7lll �I[�t 1111 f11111I1[1111171 1111 1117111` I 1 1 Ti i I I I 1 I 1 I i I ! I I 1 I J I III I1 II Z �I 10'MINIMUM 1 1 1 tem _ ���������� a UNOBSTRUCTED _.�.� ���������� • HORIZONTAL I_I, A , I, '..11 ;ttLi�. r.�;rr�r�lyw ... 1 _ .:ui —iU - -ImJII A .I' DISTANCEIIA I I A 11 A r.•, A I I FRONT VIEW *NOTE: The 10' maximum distance to vehicle accessway requirement may be achieved from equipment sides other than the one shown above. SWITCHGEAR SCREEN PAGE# C,1 HOLY CROSS ENERGY (Not to Scale) 8.38 DATE: 3-15-01 REVISED: NOVEMBER 1, 201 1 UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vali. rack $ v�n �1 � , Subject Property yAddress:5q g�� ,VQ1`Pi tr�V� - .et- Week- Subdivision:Vail v t�1A si2. Primary Conta.. I er -epresentative: L)\GO)C Phone: q7 -111 1-241'90 Plans Dated: 1 I I t Primary Conte.. Owner Representative Signature Authorized Signature Comments p .412 CENTURY LINK — 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon Jcellv.mcdemon 00 centurviink.conl XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401(fax) Contact:Remington Baker reminaton.c.bakera( xcelenergy.conl HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081(fax) Contact:Jeff Vroom Jvraomt holvcross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts:Pam McGuire pamela.mcauire(alxceleneray.corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) None 970.845.7218(fax) 11/1?/S-3-9 ci I1/1--\ Contact:Tug Birk tbirkeerwsd.orq COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael iohnsonecable.comcast.conl CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact:Dan Roussin Daniel.roussineZdot.state.ca us MOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval&re-verification If the submitted plans are altered In any way after the authorized signature date. UTILITY APPROVAL.&VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: .q.s, //RD L/L /A Lot Block Subdivision: -'4/4/1/ Pri ary Contact I Own rr Representative: Phone: 970•5/77.,-,??96 1,40J/Kb W U Op' Plans Dated: 7#if•/� Fri ry Contact/Ow r Representative Signature Authorize4$laneturg Comments at • CENTURY LINK ` 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon kailv.mccierrwnftenturvi ink,corn • XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401(fax) Contact:Remington Baker . l • HOLY CROSS ENERGY '� - 1* 970.947.5425(tel) QMON "�'"�,n 970.945.4081(fax) Contact:Jeff Vroom y - jvroomaholypross.com f Q t�' j14 u{'j 1 • XCEL Energy 970.262.4039(tel) A(�(f[[;(. �/}p/ 970.262.4038(fax) 11N [_y!1 Contacts:Pam McGuire rt; e... be ,�+1. . i f l[>1t ' p@mela•mcaulreiij�xcaienerav,core V� 1 .......EAGLE RIVER WATER&SANITATION d, „ j ,: DISTRICT n ,J( ' 4 t 970.477.5449(tel) j a o Ir 970.845.7218(fax) ilkl- 41 elli Contact:Tug Birk I� lb{rk®erwsd.4rg i ra,�I/AYi c � • COMCAST CABLE r �J�'�'F — 970.930.4713(tel) V `-f- i 303.603.1004(fax) (� Contact:Michael Johnson Michael johnson1 cable,gmcasl.cofq • CDOT(Only in CDOT Right-of-way) 970.683.6284(tet) 5 � Contact:Dan Roussin ��� Panlei.roussin gikkeights>$.6'= NOTES; 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198, 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval&re-verification if the submitted plans are altered In any way after the authorized signature date.