HomeMy WebLinkAboutPEC140022_sscv - Utility Approvals_1412266740.pdf Sam Bogash
From: Roussin - CDOT, Daniel <daniel.roussin@state.co.us>
Sent: Friday, September 19, 2014 3:46 PM
To: Sam Bogash
Subject: Re: Utility Verification Sign off
Sam - I have no comments.
thanks
Dan Roussin
Permit Unit Manager
Traffic and Safety
P 970.683.6284 I F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniel.roussin@state.co.us I www.coloradodot.info I www.cotrip.org
On Fri, Sep 19, 2014 at 1:53 PM, Sam Bogash <sam khwebb.com>wrote:
Hello,
Could you please review, and sign off. Please let us know if you have concerns.
Thank you!
Sam
Sam Bogash
From: Roussin - CDOT, Daniel <daniel.roussin@state.co.us>
Sent: Monday, September 22, 2014 9:07 AM
To: Sam Bogash
Subject: Re: Utility Verification Sign off
Email is good enough.
thanks
Dan Roussin
Permit Unit Manager
Traffic and Safety
0
P 970.683.6284 I F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
d,-anieell.roussin®state.co.us I www.coloradodot.info www.cotrip.org
[ i
On Mon, Sep 22, 2014 at 8:58 AM, Sam Bogash <sam(ci@khwebb.com> wrote:
Thank you!
Can you please sign off on the form? It was not attached.
From: Roussin - CDOT, Daniel [mailto:daniel.roussinC&state.co.us]
Sent: Friday, September 19, 2014 3:46 PM
To: Sam Bogash
Subject: Re: Utility Verification Sign off
Sam - I have no comments.
thanks
1
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling Installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP 702 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. 1` `, 1-rel c, 13 Fait -J
Subject Property Address:5q�' uG1�1 J4\\e1 f NVQ_ _Lot— g R. Subdivision:V x 1 v i t in Slie
Primary Contac / er epresentative:mm\..Q_ U),\GO)< Phone: q7/-1411-21 4)
Plans Dated: 1 1111E
Primary Contact/Owner Representative Signature
Authorized Sianature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts:Kelly McClemon
jcel lv.mcclernonacentuiviink.com
XCEL HIGH PRESSURE GASRJ/
970.406.1784(tel) /" nC29' '� �'I • ./C
970.468.1401(fax) j /, i
Contact:Remington Baker � N l C-crl-( (e, .
reminoton.c.bakerCaxceleneroy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081(fax)
Contact:Jeff Vroom
jvroom aDhoivcross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts:Pam McGuire
pamela.mcouirei xcelenergv.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845,7218(fax)
Contact:Tug Birk
tblrkeerwsd,orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Michael lohnson(a cabie.comcast.conl
CDOT(Only In CDOT Right-of-way)
970.683.6284(tel)
Contact:Dan Roussin
Daniehroussinndot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2, A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It Is the responsibility of the utility company and the applicant to resolve problems Identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for i
re-approval&re-verification If the submitted plans are altered in any way after the authorized signature date.
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan. including grading plan,floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. ''Trac.- 0 F-iiin 1 1
Subject Property Address:5 g \o 1 VA112y 1)01e. ..um— Week- Subdivision:V�'1 VII\a
Primary Conta / er epresentative: 610‘...k_.lL;\ GOA Phone: q3,_(412. 'O
Plans Dated: 1 tram
Primary Conta Owner Representative Signature
•
Authorized Signature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts:Kelly McClemon
kelly.mcclernon(alcenturvlink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact:Remington Baker
remington.c.baker@xceleneray.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081(fax)
Contact:Jeff Vroom
jvroomeholvcross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts:Pam McGuire
pamela.mcauiren.xcelenergv.com
EAGLE RIVER WATER&SANITATION .
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact:Tug Birk
tbirk(a erwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax) Nuchae/Johnson9-19-14
Contact:Michael Johnson good to proceed
Michael iohnsonfa cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact:Dan Roussin
Daniel.roussinndot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date.
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan,including grading plan,floor plan, and elevations,shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. !' `, A- -ya 8 *143n 1
Subject Property Address:5q2 \Ai % VQ1� i 2+� t r�V e. ..Let- Meek- Subdivision:Va`\ V t tic(sie
Primary Conte / erir(A epresentative: , __. L) GOC Phone: q7 -X11 21130
Plans Dated: 1�1 I iPrimary Conta Owner Representative Signature I
Authorized Signature Comments Date
CENTURY LINK -
970.328.8288(tel)
970.328.8282(fax)
Contacts:Kelly McClemon
kel Iv.mcclernonecenturvl ink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact:Remington Baker
rem ington.c.baker(axcelenergy.com
HOLY CROSS ENERGY ANY AN A 4+FF E++F N' +AFF: N-h '6 :A' N A 6 Date:
970.947.5425(tel) REPAR(-RMANTENAN F' H Y J. ENFF .FA 'V
// �/ SHALL BE ATR SK FOR REM F.EF.A FMF N' >THF
970.945.4081 (fax) 7d ,/ MPROVEMENTS IS NOT THE Fr F N t.'r F h ,r,: 2014.09.24
Contact:Jeff Vroom I, D'
ENERGY
CROSS ENIERGY SPEC F CAT ONSCONGERN NG THE ARE 17:28:32
jvroornaholvcross.com
EOWPMENT SCREEN'NG AND CLEARANCES SHALL SE FOLLOWED OV OOr
TO ALLOW PROPER AND SAFE ACCESS TO TH S TRANSFORMER
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts:Pam McGuire
pamela.mcauireexcelenergv.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact:Tug Birk
tbirkCalerwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Michael iohnsonC'a cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact:Dan Roussin
Daniel.roussinedot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.
HOLY CROSS ENERGY
ENGINEERING DEPARTMENT
3799 Highway 82 - P.O. Box 2150
Glenwood Springs,Colorado 81602
(970) 945-5491
EQUIPMENT SCREENING SPECIFICATIONS
All proposed designs or proposed alterations to existing screens shall comply with the following
specifications. Proposals (plans and specifications)shall be submitted to the Holy Cross Energy
Engineering Department for written approval prior to construction. Compliance and approval shall be the
sole determination of the Holy Cross Energy Engineering Department. Noncompliance with these
specifications or failure to gain written approval, shall result in the denial of a permanent meter
connection or the dismantling of nonconforming screens.
Appendixes I ands are examples of suggested equipment screens.
General Specifications:
1. Holy Cross Energy shall not be liable for any damage to screens.
2. Screen construction and maintenance shall be the responsibility of parties other than Holy Cross
Energy.
3. The area inside the screen shall be kept clean. There shall be no material of any kind stored
inside the screen.
4. Holy Cross Energy equipment will be installed in accordance with Holy Cross Energy installation
specifications.
Design Specifications:
1. All equipment shall be readily accessible by Holy Cross Energy personnel.
2. All construction shall be permanent in nature and shall not interfere with operation and
maintenance of Holy Cross Energy facilities.
3. There shall be a maximum of 10 feet horizontal distance from equipment to nearest vehicle
access way to permit removal or replacement of equipment.
4. There shall be a minimum of 10 feet level, unobstructed, horizontal distance in front of
equipment doors for maintenance and operations activities.
5. Water, snow and ice buildup shall be prevented. Proper drainage shall be provided. The area
inside the enclosure shall be gravel or concrete. Snow removal by parties other than Holy Cross
Energy may be required. Equipment will not be located under rooflines where water, snow or ice
buildup and drainage may occur.
6. Equipment shall not be covered in any manner for 15 feet directly above the equipment. If in the
opinion of Holy Cross Energy, the size and/or weight of equipment to be installed may present
handling problems, additional access and clearance may be required.
7. There shall be no doors or moving parts associated with the screen. *
8. Walls shall be a maximum of six feet in height.
9. There shall be no walls within ten feet of equipment sides having doors.
10. Equipment doors shall be able to open fully.
11. Proper equipment ventilation (minimum four feet from equipment pad) shall be maintained. This
may require snow removal by parties other than Holy Cross Energy.
12. Shrubs and trees (in all stages of growth), ornamental decoration, landscaping or any other
camouflage shall conform to all specifications.
13. Contact Holy Cross Energy for equipment and pad dimensions.
* Doors are discouraged. However, in some cases, such as locations near schools, doors may be
approved for equipment screening. Door supports shall be concrete block or concrete. Doors
shall be of sturdy construction and open onto an area that is kept free of snow and ice, such as
parking lots, driveways, etc. Doors shall have removable hinges and be locked with a Holy Cross
Energy lock. If problems develop with door operation, the doors will be dismantled.
8.34
4 70. r/, /.%%r/.%//, % %//,%///
WALL
4'MINIMUM
10'MINIMUM 10'MINIMUM
UNOBSTRUCTED TRANSFORMER UNOBSTRUCTED --
HORIZONTAL /': HORIZONTAL
DISTANCE !/ DISTANCE
4'MINIMUM
NOTE:
WALL HEIGHT 6'MAX.
r
10'MAXIMUM
TO VEHICLE
ACCESSWAY
TOP VIEW
• •. e• e VEHICLE ACCESS WAY
• .
•° • • 3 •. . e. e • - • • a •e
• e • . • e ° . • . . .. e•
.e • . ,
MAXIMUM WALL HEIGHT IS 6'
I1 1`1 r 1111 t I '111 1111'r lrJ 11�11�I 1 1 11' 1 1�
t1:11,11,]: 1((l`(111�11I11 7 L11(1J111C�1'1' '1�1 l I
TI 1 I'1'1 1 I T 1 )'111117
'f' 111 1111 I111111r1 1' I1 l1111111 J11 1 111'1 11111 ,
1 1 1 I 1 111
1
1111 1 1 1 1 1 1 1 I I l
111 11 Il 1111/111 1L11111 IIIII II
I1 I L I I:I 7 71I 11111
Ifl'I (1 11IIfL I1J1 111 t ,fI
I 1 1 10'MINIMUM
��������r r���M �n���I UNOBSTRUCTED
gra=In �m �j���IM i��I.AMA HORIZONTAL
' DISTANCE
Tuncnarvirmrn i 1 •-: f^""^ 1"1'3 , r ai yrnu�en rnrlrwn rn>rur
FRONT VIEW
*NOTE: The 10' maximum distance to vehicle accessway requirement may be achieved from
equipment sides other than the one shown above.
TRANSFORMER SCREEN PAGE#
HOLY CROSS ENERGY (Not to Scale) 8.36
,�/ DATE: 3-15-01 REVISED: NOVEMBER 1, 2011
irrr'/4 "
" // /. %r//7.%%rY//,%rr r r N
WALL
4'MINIMUM
J A DOORS
10'MINIMUM r SWITCH 10'MINIMUM
UNOBSTRUCTED GEAR UNOBSTRUCTED
HORIZONTAL HORIZONTAL
DISTANCE t DISTANCE
DOORS
4'MINIMUM
NOTE:
it
WALL HEIGHT 6'MAX.
'%%%%U.%i%r/r/%%r/•/i/.%/rir�
" 10'MAXIMUM \✓
TO VEHICLE
ACCESSWAY
TOP VIEW
• • ° •' VEHICLE ACCESS WAY • ••
• • a• a
a
• ••a • •
MAXIMUM WALL HEIGHT IS 6'
'71=47
-I 1 1 1 1 J 1 I 11
41111 rI 11i
I Jill'1'1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1 1 1 1 1 1 1
1 I 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 II 11 IL'
1 1 1 I I1 I f 1 1 ! I I I I I 11 I 11 I 1
1 1 1 1 1 1 ( I I 1 ! 1 1 I 1 I 1 I I I I
7777 I J1 1 [ 1 1�1 I I ( l 1 I I 11 1 I Z 11
_ J I i7 111 _I1_rLr1�1i 1 1 11 1 I 1 I I 1 I 1! I LI
'I J IL_�_i. I I 7 I l I 1 1 1 I 1 I�Ill LI
r
'1IIIClI I I_I I II 111111 II t11 I I
I 17 1'1111`L
�1'T 7lll �I[�t 1111 f11111I1[1111171 1111 1117111`
I 1 1 Ti i
I I I 1 I 1 I i I ! I I 1 I J I III I1 II Z �I 10'MINIMUM
1 1 1
tem _ ���������� a UNOBSTRUCTED
_.�.� ���������� • HORIZONTAL
I_I, A , I, '..11 ;ttLi�. r.�;rr�r�lyw ... 1 _ .:ui —iU - -ImJII A .I' DISTANCEIIA I I A 11 A r.•, A I I
FRONT VIEW
*NOTE: The 10' maximum distance to vehicle accessway requirement may be achieved from
equipment sides other than the one shown above.
SWITCHGEAR SCREEN PAGE#
C,1
HOLY CROSS ENERGY (Not to Scale) 8.38
DATE: 3-15-01 REVISED: NOVEMBER 1, 201 1
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations,shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vali. rack $
v�n �1
� ,
Subject Property yAddress:5q g�� ,VQ1`Pi tr�V� - .et- Week- Subdivision:Vail v t�1A si2.
Primary Conta.. I er -epresentative: L)\GO)C Phone: q7 -111 1-241'90
Plans Dated: 1 I I t
Primary Conte.. Owner Representative Signature
Authorized Signature Comments p
.412
CENTURY LINK —
970.328.8288(tel)
970.328.8282(fax)
Contacts:Kelly McClemon
Jcellv.mcdemon 00 centurviink.conl
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401(fax)
Contact:Remington Baker
reminaton.c.bakera( xcelenergy.conl
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081(fax)
Contact:Jeff Vroom
Jvraomt holvcross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts:Pam McGuire
pamela.mcauire(alxceleneray.corn
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel) None
970.845.7218(fax)
11/1?/S-3-9
ci I1/1--\
Contact:Tug Birk
tbirkeerwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Michael iohnsonecable.comcast.conl
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact:Dan Roussin
Daniel.roussineZdot.state.ca us
MOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval&re-verification If the submitted plans are altered In any way after the authorized signature date.
UTILITY APPROVAL.&VERIFICATION
This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling Installations. A site plan,including grading plan,floor plan,and elevations,shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: .q.s, //RD L/L /A Lot Block Subdivision: -'4/4/1/
Pri ary Contact I Own rr Representative: Phone: 970•5/77.,-,??96
1,40J/Kb W U Op' Plans Dated: 7#if•/�
Fri ry Contact/Ow r Representative Signature
Authorize4$laneturg Comments at
• CENTURY LINK `
970.328.8288(tel)
970.328.8282(fax)
Contacts:Kelly McClemon
kailv.mccierrwnftenturvi ink,corn
• XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401(fax)
Contact:Remington Baker
. l
• HOLY CROSS ENERGY '� -
1*
970.947.5425(tel) QMON
"�'"�,n
970.945.4081(fax)
Contact:Jeff Vroom y -
jvroomaholypross.com f Q t�' j14 u{'j 1
• XCEL Energy
970.262.4039(tel) A(�(f[[;(. �/}p/
970.262.4038(fax) 11N [_y!1
Contacts:Pam McGuire rt; e...
be
,�+1. . i f l[>1t '
p@mela•mcaulreiij�xcaienerav,core V� 1
.......EAGLE RIVER WATER&SANITATION d, „ j ,:
DISTRICT n ,J( ' 4 t
970.477.5449(tel) j a o Ir
970.845.7218(fax) ilkl-
41 elli
Contact:Tug Birk I�
lb{rk®erwsd.4rg i
ra,�I/AYi c �
• COMCAST CABLE r �J�'�'F —
970.930.4713(tel) V `-f- i
303.603.1004(fax) (�
Contact:Michael Johnson
Michael johnson1 cable,gmcasl.cofq
• CDOT(Only in CDOT Right-of-way)
970.683.6284(tet) 5 �
Contact:Dan Roussin ���
Panlei.roussin gikkeights>$.6'=
NOTES;
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198,
3. It is the responsibility of the utility company and the applicant to resolve problems Identified above.
4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for
re-approval&re-verification if the submitted plans are altered In any way after the authorized signature date.