HomeMy WebLinkAboutPEC140031_Vail 21 301 A0.01_1410281940.pdfDRAWING ABBREVIATIONS LEGEND
A
AB ANCHOR BOLT
AD AREA DRAIN
AC AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
ADD'L ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AL ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
B
B.M. BENCH MARK
BD BOARD
BETW BETWEEN
BF BACKFACE
BL BUILDING LINE
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
BW BEARING WALL
C
C COMPACT PARKING SPACE
CEM CEMENT
CER CERAMIC
CIP CAST IN PLACE
CJ CONTROL JOINT
CJ CONSTRUCTION JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
COOR CORRIDOR
CR COLD ROLLED
CT CERAMIC TILE
CTD CENTERED
CTR CENTER
CW CURTAIN WALL
D
D DEPTH
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DJ DEFLECTION JOINT
DL DEAD LOAD
DN DOWN
DRG DRAWING
DS DOWN SPOUT
DWGS DRAWINGS
E
EA EACH
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP BLT EXPANSION BOLT
EXT EXTERIOR
F
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIB FIBERGLASS
FIN FINISH
FLR FLOOR
FS FAR SIDE
FT FOOT
FTG FOOTING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
G
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GEN GENERAL
GFRC GLASS-FIBER REINFORCED
CONCRETE
GI GALVANIZED IRON
GL GLASS
GM GLAZED MASONRY UNIT
GND GROUND
GR GRADE
GRG GLASS-REINFORCED
GYPSUM
GYP BD GYPSUM BOARD
H
HB HOSE BIB
HDW HARDWARE
HDWD HARDWOOD
HK HOOK
HM HOLLOW METAL
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HEADED STUD
HSKP HOUSEKEEPING
HT HEIGHT
HW HAND WASH
HW HEAD OF WALL
I
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
K
K KIPS (1000 LB)
KO KNOCK-OUT
KP KICKPLATE
KPD KEYPAD
KSF KIPS PER SQUARE FOOT
L
L ANGLE
LAV LAVATORY
LG LONG
LKB LOCKABLE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW POINT
LT LIGHT
LWC LIGHTWEIGHT CONCRETE
M
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL, ELECTRICAL
AND PLUMBING
MFG MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOB MEDICAL OFFICE BUILDING
MOD BIT MODIFIED BITUMEN
MOD MODIFIED
MTL METAL
N
NA NOT AVAILABLE
NIC NOT IN CONTRACT
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
O
OA OVER ALL
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OFCI OWNER FURNISHED,
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER
INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSF OUTSIDE FACE
P
P LAM PLASTIC LAMINATE
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT
PLASTER
PENT PENTHOUSE
PL PROPERTY LINE
PL PLATE
PLUMB PLUMBING
PLYWD PLYWOOD
PP PUSH PLATE
POL POLISHED
PORT CEM PORTLAND CEMENT
PR PAIR
PREFAB PREFABRICATED
PSI POUNDS PER SQUARE INCH
PT POINT
PTD PAINTED
R
R RISER
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
RECP RECEPTACLE
REF REFER OR REFERENCE
REINF REINFORCING
RELOC RELOCATE/RELOCATED
REQ'D REQUIRED
RFVC RECESSED FIRE VALVE
CABINET
RM ROOM
RO ROUGH OPENING
SBC STANDARD BUILDING CODE
SCHED SCHEDULE
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SO STRUCTURAL OPENING
SOG SLAB ON GRADE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSF SOLID SURFACE
STD STANDARD
STL STEEL
STRUC STRUCTURAL
SYS SYSTEM
S
T
T TREAD
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK
TLT TOILET
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOP TOP OF PARAPET
TOS TOP OF SLAB
TYP TYPICAL
U
U/C UNDER COUNTER
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VWC VINYL WALL COVERING
V
W/ WITH
W/C WHEEL CHAIR
W/O WITHOUT
W WIDTH
WP WATERPROOF(ING)
WD WOOD
WF WIDE FLANGE
WL WIND LOAD
WP WORK POINT
WPO WORK POINT - POINT OF
ORIGIN
WP1 WORK POINT - NUMBERED
WWF WELDED WIRE FABRIC
W
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT,
OR CEMENT PLASTER
BRICK
CMU
FIBERGLASS BATT
INSULATION
POLYISOCYANURATE RIGID
INSULATION
MATERIALS
ROOM NAME
XXXXX
A0.XX
A3
A3
ROOM NAME/NUMBER
BUILDING WALL
SECTION
SECTION DETAIL
PLAN, BLOW-UP DETAIL
PARTITION TYPE WITH NO
SOUND ATTENUATION
PARTITION TYPE WITH
SOUND ATTENUATION
CMU WALL
NEW WALL
EXISTING WALL
DRAWING SYMBOLS
CEILING SYMBOLS
BUILDING EXPANSION
JOINT
GYP BD CEILING
WALL MOUNTED
FLUORESCENT FIXTURE
EXIT SIGNS - HATCH
INDICATES EXIT TEXT AND
ARROW INDICATES
DIRECTION
PENDANT TYPE LIGHT
FIXTURE
01
+9'-0" CEILING HEIGHT
AAA
3
AAA
3
A0.XX
01
A0.XX
01
HARDWOOD FLOORING
TILE FLOORING
301 302
PROJECT NUMBER
ISSUE DATE
710 W. COLFAX; DENVER, C0 80204
REVISION
SHEET TITLE
ISSUE
SHEET NO.
521 EAST LIONSHEAD CIRCLE
VAIL, COLORADO 81657
A0.01
PROJECT INFORMATION
14040.000
TENANT IMPROVEMENTS
SUITE 301 & 302
CONSTRUCTION
DOCUMENTS
AUGUST 04, 2014
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
A0.00 COVER
A0.01 PROJECT INFORMATION
A0.02 CODE ANALYSIS AND EGRESS PLAN
A1.01 SUITE 301 AND 302 FLOOR PLAN
A1.02 ENLARGED PLANS AND ELEVATIONS
A1.03 ENLARGED PLANS AND ELEVATIONS
A3.01 INTERIOR ELEVATIONS AND MILLWORK DETAILS
A3.50 MILLWORK DETAILS
A3.40 FINISH INFORMATION
PROJECT LOCATION
KEY PLAN
LEVEL 3
VICINITY MAP
No. Description Date
M1.01 MECHANICAL PLAN
P1.01 PLUMBING PLAN
E1.0 ELECTRICAL COVER SHEET
E1.1 ELECTRCIAL PLAN
E1.2 LIGHTING PLAN
PEC
APPROVED
9/8/2014 12:00:00 AM