HomeMy WebLinkAboutPEC140031_Vail 21 301 A1.01_1410281940.pdf10' - 0"
2' - 4"
5' - 0"
3' - 6"
6' - 0"
12' - 4"
4' - 4" 6' - 8"
2' - 4" 5' - 2 1/4" 3' - 5" 9' - 9" 2' - 1"
4' - 2"
8' - 6" KITCHEN
BEDROOM 1
DINING
LIVING ROOM
CLO
BEDROOM 2
BATHROOM 2
CLO
BATHROOM 1
A3.01 01 02
A1.03
06
05
/A1.0301
/A1.0201
A
B
A B
C C
ETR
A
-
05
A3.01
CLO
A
A
A
A
A
A
A
A
A
A
A
A
A
B
EXISTING
DOOR
KITCHEN
DINING
LIVING ROOM
BEDROOM 2
BATHROOM 2
CLO
BEDROOM 1
CLO
BATHROOM 1
CLO
TILE SHOWER: FLOOR
AND WALLS. WALLS
FROM FLOOR TO CEILING
03
A3.01
05
A3.01
BEDROOM 1
CLO
KITCHEN
DINING
LIVING ROOM
CLO
BEDROOM 2
BATHROOM 2
CLO
BATHROOM 1
LT-3 TYP.
LT-4
LT-5
LT-2
LT-1
05
A3.01
LT-2
LT-2
LT-1
FLOATING WALNUT
FLOORING
TILE FLOORING
FINISH LEGEND
SINGLE GLASS DOOR DOUBLE SLIDING MIRROR
CLOSET DOORS
FLUSH DOOR
2' - 8" 7' - 0"
2' - 8"
7' - 0"
TYPE A TYPE B TYPE C
DOOR TYPES
A B C
GENERAL NOTES
1. REFER TO SHEET A1.01 FOR PARTITION TYPES
2. REFER TO SHEET A1.01 FOR DOOR INFORMATION, SCHEDULES AND
DETAILS.
3. REFER TO SHEET A9.01 AND SPEC FOR FINISH INFORMATION
4. REFER TO SHEET A3.01 AND A3.02 FOR CASEWORK DETAILS AND
INFORMATION.
5. ALL EXTERIOR DIMENSIONS ARE FROM FACE OF EXTERIOR FINISH, U.N.O.
6. ALL NEW CEILINGS SHALL MATCH EXISTING CEILING HEIGHTS
7. REFER TO SHEET A3.40 FOR LIGHTING SPECS
8. CONTRACTOR SHALL VERIFY LOCATION OF ALL LIGHT FIXTURES AND
COORDINATE INSTALLATION WITH THE MECHANICAL AND ELECTRICAL
CONTRACTORS. NOTIFY ARCHITECT/DESIGNER OF ANY CONFLICTS PRIOR
TO INSTALLATION.
FINISH PLAN GENERAL NOTES
1. ALL EXISTING AND NEW INTERIOR WALLS TO BE PAINTED PT-1, UNO.
2. PREP FLOOR TO RECEIVE NEW FINISHES. ALL FINISHES SHALL BE
INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS
AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.
3. SEE SHEET A3.40 FOR FINISH LEGEND
4. SEE THE INTERIOR ELEVATIONS AND RCP FOR ADDITIONAL FINISH
INFORMATION
5. SEE SHEET A3.02 FOR FLOOR TRANSITION DETAILS
6. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR UNO.
7. ALL PAINTED SURFACES TO RECEIVE (1) COAT PRIMER AND (2) FINISH
COATS MIN. AS REQUIRED TO ACHEIVE UNIFORM COVERAGE AND FINISH.
8. PAINT ALL GYP BD CEILINGS P-3 UNO.
9. PROVIDE SAMPLES OF ALL FINISH MATERIALS TO DESIGNER FOR
APPROVAL PRIOR TO COMMENCEMENT OF WORK
10. SHOULD THE CONTRACTOR FIND ANY DISCREPENCIES, OMISSIONS,
AMBIGUITIES OR CONFLICTS ON THE PLANS, HE SHOULD BRING ITEMS TO
THE ATTENTION OF THE ARCHITECT/DESIGNER BEFORE PROCEEDING
WITH ANY WORK IN QUESTION
11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS AND
APPROPRIATE QUANTITY OF MATERIALS
5/8" GYPSUMBOARD
LAG BOLTS
SLIDING DOOR HARDWARE
PER SCHEDULE 0' - 4"
DOOR FRAME
PER SCHEDULE
DOOR PER SCHEDULE
5/8" GYPSUMBOARD
DOOR FRAME
PER SCHEDULE
DOOR PER SCHEDULE
DOOR JAMB
4"
LINE OF
STRUCTURE
LINE OF
STRUCTURE
TYPE "A"
1/2" GYP BD
2X4 SILL PLATE
2X4 TOP PLATE
1/2" GYP BD
LINE OF
STRUCTURE
LINE OF
STRUCTURE
TYPE "B"
1/2" GYP BD
2X8 SILL PLATE
2X8 TOP PLATE
1/2" GYP BD
4 1/2" 8 1/4"
PROJECT NUMBER
ISSUE DATE
710 W. COLFAX; DENVER, C0 80204
REVISION
SHEET TITLE
ISSUE
SHEET NO.
521 EAST LIONSHEAD CIRCLE
VAIL, COLORADO 81657
A1.01
SUITE 301 AND 302 FLOOR
PLAN
14040.000
TENANT IMPROVEMENTS
SUITE 301 & 302
CONSTRUCTION
DOCUMENTS
AUGUST 04, 2014
1/4" = 1'-0" 01SUITE 302 FLOOR PLAN
1/4" = 1'-0"
03SUITE
302 FINISH PLAN
1/4" = 1'-0" 02SUITE 302 RCP
3" = 1'-0"
04HEAD DETAIL SLIDING DOOR
3" = 1'-0" 05TYPICAL DOOR HEAD
3" = 1'-0"06PARTITION TYPES
BUILT IN STORAGE
No. Description Date
Floor Plan
PEC
APPROVED
9/8/2014 12:00:00 AM