Loading...
HomeMy WebLinkAboutPEC140031_Vail 21 301 A1.03_1410281940.pdfA1.03 - 02 03 04 A1.03 06 05 04 A3.01 BATHROOM 2 BATHROOM 1 REF: 01/A3.02 FOR THRESHOLD DETAIL REF: 01/A9.02 FOR THRESHOLD DETAIL 1' - 4" 2' - 10" 2' - 6" B 6' - 0" 2' - 9" 1' - 3" TOWEL BAR CLO 3' - 0 1/2" 04 A3.01 Sim 1' - 4" 4' - 3" TOWEL BAR 5' - 0" 2' - 9" 3' - 1 1/2" CT-1 FRAMELSS SLIDING GLASS SHOWER DOOR CT-1 PT-1 2' - 2" 5' - 0" CAB-2 MIRROR LT-1 CT-1 FRAMELSS SLIDING GLASS SHOWER DOOR 3' - 1 1/2" 2' - 7 1/2" 6" 3' - 4" TILE BACKSPLASH PT-1 FRAMELSS SLIDING GLASS SHOWER DOORS CT-1 6' - 0" 2' - 2" CT-1 P-1 CAB-2 MIRROR LT-1 CT-1 FRAMELSS SLIDING GLASS SHOWER DOOR 2' - 9" 2' - 7 1/2" 6" 6" TILE BACKSPLASH 2' - 10" 3' - 4" CT-1 PT-1 CT-1 2' - 9" TOWEL BAR, STAINLESS STEEL FRAMELESS GLASS SLIDING SHOWER DOOR 3' - 8" CT-1 PT-1 GENERAL NOTES 1. REFER TO SHEET A1.01 FOR PARTITION TYPES 2. REFER TO SHEET A1.01 FOR DOOR INFORMATION, SCHEDULES AND DETAILS. 3. REFER TO SHEET A9.01 AND SPEC FOR FINISH INFORMATION 4. REFER TO SHEET A3.01 AND A3.02 FOR CASEWORK DETAILS AND INFORMATION. 5. ALL EXTERIOR DIMENSIONS ARE FROM FACE OF EXTERIOR FINISH, U.N.O. 6. ALL NEW CEILINGS SHALL MATCH EXISTING CEILING HEIGHTS 7. REFER TO SHEET A3.40 FOR LIGHTING SPECS 8. CONTRACTOR SHALL VERIFY LOCATION OF ALL LIGHT FIXTURES AND COORDINATE INSTALLATION WITH THE MECHANICAL AND ELECTRICAL CONTRACTORS. NOTIFY ARCHITECT/DESIGNER OF ANY CONFLICTS PRIOR TO INSTALLATION. FINISH PLAN GENERAL NOTES 1. ALL EXISTING AND NEW INTERIOR WALLS TO BE PAINTED PT-1, UNO. 2. PREP FLOOR TO RECEIVE NEW FINISHES. ALL FINISHES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE. 3. SEE SHEET A3.40 FOR FINISH LEGEND 4. SEE THE INTERIOR ELEVATIONS AND RCP FOR ADDITIONAL FINISH INFORMATION 5. SEE SHEET A3.02 FOR FLOOR TRANSITION DETAILS 6. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF DOOR UNO. 7. ALL PAINTED SURFACES TO RECEIVE (1) COAT PRIMER AND (2) FINISH COATS MIN. AS REQUIRED TO ACHEIVE UNIFORM COVERAGE AND FINISH. 8. PAINT ALL GYP BD CEILINGS P-3 UNO. 9. PROVIDE SAMPLES OF ALL FINISH MATERIALS TO DESIGNER FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK 10. SHOULD THE CONTRACTOR FIND ANY DISCREPENCIES, OMISSIONS, AMBIGUITIES OR CONFLICTS ON THE PLANS, HE SHOULD BRING ITEMS TO THE ATTENTION OF THE ARCHITECT/DESIGNER BEFORE PROCEEDING WITH ANY WORK IN QUESTION 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS AND APPROPRIATE QUANTITY OF MATERIALS PROJECT NUMBER ISSUE DATE 710 W. COLFAX; DENVER, C0 80204 REVISION SHEET TITLE ISSUE SHEET NO. 521 EAST LIONSHEAD CIRCLE VAIL, COLORADO 81657 A1.03 ENLARGED PLANS AND ELEVATIONS 14040.000 TENANT IMPROVEMENTS SUITE 301 & 302 CONSTRUCTION DOCUMENTS AUGUST 04, 2014 3/4" = 1'-0" 01ENLARGED PLAN - BATHROOMS 3/8" = 1'-0" 05BATHROOM 1 - EAST 3/8" = 1'-0" 06BATHROOM 1 - SOUTH 3/8" = 1'-0" 02BATHROOM 2 - NORTH 3/8" = 1'-0"03BATHROOM 2 - EAST 3/8"= 1'-0"04BATHROOM 2 - WEST NOTE: REFERENCE SHEET A3.40 FOR TILE BASE DETAILS NOTE: REFERENCE SHEET A3.40 FOR TILE BASE DETAILS NOTE: REFERENCE SHEET A3.02 FOR TILE BASE DETAILS NOTE: REFERENCE SHEET A3.40 FOR TILE BASE DETAILS NOTE: REFERENCE SHEET A3.40 FOR TILE BASE DETAILS No. Description Date PEC APPROVED 9/8/2014 12:00:00 AM