Loading...
HomeMy WebLinkAboutPEC140032_Vail 21 Unit 302 A0.01_1410282060.pdfDRAWING ABBREVIATIONS LEGEND A AB ANCHOR BOLT AD AREA DRAIN AC AIR CONDITIONING ACT ACOUSTICAL CEILING TILE ADD ADDENDUM ADD'L ADDITIONAL ADJ ADJACENT AFF ABOVE FINISHED FLOOR AGGR AGGREGATE AL ALUM ALUMINUM ALT ALTERNATE ANOD ANODIZED APPROX APPROXIMATE ARCH ARCHITECTURAL B B.M. BENCH MARK BD BOARD BETW BETWEEN BF BACKFACE BL BUILDING LINE BLDG BUILDING BLKG BLOCKING BM BEAM BOT BOTTOM BRG BEARING BSMT BASEMENT BW BEARING WALL C C COMPACT PARKING SPACE CEM CEMENT CER CERAMIC CIP CAST IN PLACE CJ CONTROL JOINT CJ CONSTRUCTION JOINT CL CENTER LINE CLG CEILING CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN COMM COMMUNICATIONS CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS COORD COORDINATE COOR CORRIDOR CR COLD ROLLED CT CERAMIC TILE CTD CENTERED CTR CENTER CW CURTAIN WALL D D DEPTH DET DETAIL DIA DIAMETER DIM DIMENSION DJ DEFLECTION JOINT DL DEAD LOAD DN DOWN DRG DRAWING DS DOWN SPOUT DWGS DRAWINGS E EA EACH EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRIC ELEV ELEVATOR EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXP BLT EXPANSION BOLT EXT EXTERIOR F FD FLOOR DRAIN FDN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISH FLOOR FHC FIRE HOSE CABINET FIB FIBERGLASS FIN FINISH FLR FLOOR FS FAR SIDE FT FOOT FTG FOOTING FV FIELD VERIFY FVC FIRE VALVE CABINET G GA GAUGE GALV GALVANIZED GB GRADE BEAM GEN GENERAL GFRC GLASS-FIBER REINFORCED CONCRETE GI GALVANIZED IRON GL GLASS GM GLAZED MASONRY UNIT GND GROUND GR GRADE GRG GLASS-REINFORCED GYPSUM GYP BD GYPSUM BOARD H HB HOSE BIB HDW HARDWARE HDWD HARDWOOD HK HOOK HM HOLLOW METAL HOR HORIZONTAL HP HIGH POINT HR HOUR HS HEADED STUD HSKP HOUSEKEEPING HT HEIGHT HW HAND WASH HW HEAD OF WALL I IBC INTERNATIONAL BUILDING CODE ID INSIDE DIAMETER INSUL INSULATION INT INTERIOR K K KIPS (1000 LB) KO KNOCK-OUT KP KICKPLATE KPD KEYPAD KSF KIPS PER SQUARE FOOT L L ANGLE LAV LAVATORY LG LONG LKB LOCKABLE LL LIVE LOAD LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LOC LOCATION LP LOW POINT LT LIGHT LWC LIGHTWEIGHT CONCRETE M MAS MASONRY MAT'L MATERIAL MAX MAXIMUM MECH MECHANICAL MEMB MEMBRANE MEP MECHANICAL, ELECTRICAL AND PLUMBING MFG MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MO MASONRY OPENING MOB MEDICAL OFFICE BUILDING MOD BIT MODIFIED BITUMEN MOD MODIFIED MTL METAL N NA NOT AVAILABLE NIC NOT IN CONTRACT NOM NOMINAL NS NEAR SIDE NTS NOT TO SCALE NWC NORMAL WEIGHT CONCRETE O OA OVER ALL OC ON CENTER OD OUTSIDE DIAMETER OD OVERFLOW DRAIN OFCI OWNER FURNISHED, CONTRACTOR INSTALLED OFOI OWNER FURNISHED, OWNER INSTALLED OH OPPOSITE HAND OPNG OPENING OPP OPPOSITE OSF OUTSIDE FACE P P LAM PLASTIC LAMINATE PC PRECAST CONCRETE PCF POUNDS PER CUBIC FOOT PCP PORTLAND CEMENT PLASTER PENT PENTHOUSE PL PROPERTY LINE PL PLATE PLUMB PLUMBING PLYWD PLYWOOD PP PUSH PLATE POL POLISHED PORT CEM PORTLAND CEMENT PR PAIR PREFAB PREFABRICATED PSI POUNDS PER SQUARE INCH PT POINT PTD PAINTED R R RISER RAD RADIUS RCP REFLECTED CEILING PLAN RD ROOF DRAIN REBAR REINFORCING BAR RECP RECEPTACLE REF REFER OR REFERENCE REINF REINFORCING RELOC RELOCATE/RELOCATED REQ'D REQUIRED RFVC RECESSED FIRE VALVE CABINET RM ROOM RO ROUGH OPENING SBC STANDARD BUILDING CODE SCHED SCHEDULE SECT SECTION SHWR SHOWER SIM SIMILAR SO STRUCTURAL OPENING SOG SLAB ON GRADE SPEC SPECIFICATION SQ SQUARE SS STAINLESS STEEL SSF SOLID SURFACE STD STANDARD STL STEEL STRUC STRUCTURAL SYS SYSTEM S T T TREAD TC TOP OF CURB TEL TELEPHONE TEMP TEMPERATURE THK THICK TLT TOILET TO TOP OF TOB TOP OF BEAM TOC TOP OF CONCRETE TOF TOP OF FOOTING TOP TOP OF PARAPET TOS TOP OF SLAB TYP TYPICAL U U/C UNDER COUNTER U/G UNDERGROUND UNO UNLESS NOTED OTHERWISE VAR VARIES VCT VINYL COMPOSITION TILE VERT VERTICAL VEST VESTIBULE VWC VINYL WALL COVERING V W/ WITH W/C WHEEL CHAIR W/O WITHOUT W WIDTH WP WATERPROOF(ING) WD WOOD WF WIDE FLANGE WL WIND LOAD WP WORK POINT WPO WORK POINT - POINT OF ORIGIN WP1 WORK POINT - NUMBERED WWF WELDED WIRE FABRIC W CONCRETE/ PRECAST CONCRETE SOIL SAND, EIFS FINISH COAT, OR CEMENT PLASTER BRICK CMU FIBERGLASS BATT INSULATION POLYISOCYANURATE RIGID INSULATION MATERIALS ROOM NAME XXXXX A0.XX A3 A3 ROOM NAME/NUMBER BUILDING WALL SECTION SECTION DETAIL PLAN, BLOW-UP DETAIL PARTITION TYPE WITH NO SOUND ATTENUATION PARTITION TYPE WITH SOUND ATTENUATION CMU WALL NEW WALL EXISTING WALL DRAWING SYMBOLS CEILING SYMBOLS BUILDING EXPANSION JOINT GYP BD CEILING WALL MOUNTED FLUORESCENT FIXTURE EXIT SIGNS - HATCH INDICATES EXIT TEXT AND ARROW INDICATES DIRECTION PENDANT TYPE LIGHT FIXTURE 01 +9'-0" CEILING HEIGHT AAA 3 AAA 3 A0.XX 01 A0.XX 01 HARDWOOD FLOORING TILE FLOORING 301 302 PROJECT NUMBER ISSUE DATE 710 W. COLFAX; DENVER, C0 80204 REVISION SHEET TITLE ISSUE SHEET NO. 521 EAST LIONSHEAD CIRCLE VAIL, COLORADO 81657 A0.01 PROJECT INFORMATION 14040.000 TENANT IMPROVEMENTS SUITE 301 & 302 CONSTRUCTION DOCUMENTS AUGUST 04, 2014 INDEX OF DRAWINGS SHEET NUMBER SHEET NAME A0.00 COVER A0.01 PROJECT INFORMATION A0.02 CODE ANALYSIS AND EGRESS PLAN A1.01 SUITE 301 AND 302 FLOOR PLAN A1.02 ENLARGED PLANS AND ELEVATIONS A1.03 ENLARGED PLANS AND ELEVATIONS A3.01 INTERIOR ELEVATIONS AND MILLWORK DETAILS A3.50 MILLWORK DETAILS A3.40 FINISH INFORMATION PROJECT LOCATION KEY PLAN LEVEL 3 VICINITY MAP No. Description Date 302M1.01 MECHANICAL PLAN P1.01 PLUMBING PLAN E1.0 ELECTRICAL COVER SHEET E1.1 ELECTRCIAL PLAN E1.2 LIGHTING PLAN PEC APPROVED 9/8/2014 12:00:00 AM