Loading...
HomeMy WebLinkAboutPEC140032_Vail 21 Unit 302 A1.01_1410282060.pdf10' - 0" 2' - 4" 5' - 0" 3' - 6" 6' - 0" 12' - 4" 4' - 4" 6' - 8" 2' - 4" 5' - 2 1/4" 3' - 5" 9' - 9" 2' - 1" 4' - 2" 8' - 6" KITCHEN BEDROOM 1 DINING LIVING ROOM CLO BEDROOM 2 BATHROOM 2 CLO BATHROOM 1 A3.01 01 02 A1.03 06 05 /A1.0301 /A1.0201 A B A B C C ETR A - 05 A3.01 CLO A A A A A A A A A A A A A B EXISTING DOOR KITCHEN DINING LIVING ROOM BEDROOM 2 BATHROOM 2 CLO BEDROOM 1 CLO BATHROOM 1 CLO TILE SHOWER: FLOOR AND WALLS. WALLS FROM FLOOR TO CEILING 03 A3.01 05 A3.01 BEDROOM 1 CLO KITCHEN DINING LIVING ROOM CLO BEDROOM 2 BATHROOM 2 CLO BATHROOM 1 LT-3 TYP. LT-4 LT-5 LT-2 LT-1 05 A3.01 LT-2 LT-2 LT-1 FLOATING WALNUT FLOORING TILE FLOORING FINISH LEGEND SINGLE GLASS DOOR DOUBLE SLIDING MIRROR CLOSET DOORS FLUSH DOOR 2' - 8" 7' - 0" 2' - 8" 7' - 0" TYPE A TYPE B TYPE C DOOR TYPES A B C GENERAL NOTES 1. REFER TO SHEET A1.01 FOR PARTITION TYPES 2. REFER TO SHEET A1.01 FOR DOOR INFORMATION, SCHEDULES AND DETAILS. 3. REFER TO SHEET A9.01 AND SPEC FOR FINISH INFORMATION 4. REFER TO SHEET A3.01 AND A3.02 FOR CASEWORK DETAILS AND INFORMATION. 5. ALL EXTERIOR DIMENSIONS ARE FROM FACE OF EXTERIOR FINISH, U.N.O. 6. ALL NEW CEILINGS SHALL MATCH EXISTING CEILING HEIGHTS 7. REFER TO SHEET A3.40 FOR LIGHTING SPECS 8. CONTRACTOR SHALL VERIFY LOCATION OF ALL LIGHT FIXTURES AND COORDINATE INSTALLATION WITH THE MECHANICAL AND ELECTRICAL CONTRACTORS. NOTIFY ARCHITECT/DESIGNER OF ANY CONFLICTS PRIOR TO INSTALLATION. FINISH PLAN GENERAL NOTES 1. ALL EXISTING AND NEW INTERIOR WALLS TO BE PAINTED PT-1, UNO. 2. PREP FLOOR TO RECEIVE NEW FINISHES. ALL FINISHES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE. 3. SEE SHEET A3.40 FOR FINISH LEGEND 4. SEE THE INTERIOR ELEVATIONS AND RCP FOR ADDITIONAL FINISH INFORMATION 5. SEE SHEET A3.02 FOR FLOOR TRANSITION DETAILS 6. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF DOOR UNO. 7. ALL PAINTED SURFACES TO RECEIVE (1) COAT PRIMER AND (2) FINISH COATS MIN. AS REQUIRED TO ACHEIVE UNIFORM COVERAGE AND FINISH. 8. PAINT ALL GYP BD CEILINGS P-3 UNO. 9. PROVIDE SAMPLES OF ALL FINISH MATERIALS TO DESIGNER FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK 10. SHOULD THE CONTRACTOR FIND ANY DISCREPENCIES, OMISSIONS, AMBIGUITIES OR CONFLICTS ON THE PLANS, HE SHOULD BRING ITEMS TO THE ATTENTION OF THE ARCHITECT/DESIGNER BEFORE PROCEEDING WITH ANY WORK IN QUESTION 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS AND APPROPRIATE QUANTITY OF MATERIALS 5/8" GYPSUMBOARD LAG BOLTS SLIDING DOOR HARDWARE PER SCHEDULE 0' - 4" DOOR FRAME PER SCHEDULE DOOR PER SCHEDULE 5/8" GYPSUMBOARD DOOR FRAME PER SCHEDULE DOOR PER SCHEDULE DOOR JAMB 4" LINE OF STRUCTURE LINE OF STRUCTURE TYPE "A" 1/2" GYP BD 2X4 SILL PLATE 2X4 TOP PLATE 1/2" GYP BD LINE OF STRUCTURE LINE OF STRUCTURE TYPE "B" 1/2" GYP BD 2X8 SILL PLATE 2X8 TOP PLATE 1/2" GYP BD 4 1/2" 8 1/4" PROJECT NUMBER ISSUE DATE 710 W. COLFAX; DENVER, C0 80204 REVISION SHEET TITLE ISSUE SHEET NO. 521 EAST LIONSHEAD CIRCLE VAIL, COLORADO 81657 A1.01 SUITE 301 AND 302 FLOOR PLAN 14040.000 TENANT IMPROVEMENTS SUITE 301 & 302 CONSTRUCTION DOCUMENTS AUGUST 04, 2014 1/4" = 1'-0" 01SUITE 302 FLOOR PLAN 1/4" = 1'-0" 03SUITE 302 FINISH PLAN 1/4" = 1'-0" 02SUITE 302 RCP 3" = 1'-0" 04HEAD DETAIL SLIDING DOOR 3" = 1'-0" 05TYPICAL DOOR HEAD 3" = 1'-0"06PARTITION TYPES BUILT IN STORAGE No. Description Date 302302 Floor Plans PEC APPROVED 9/8/2014 12:00:00 AM