HomeMy WebLinkAboutPEC140032_Vail 21 Unit 302 A1.03_1410282060.pdfA1.03
-
02
03
04
A1.03
06
05
04
A3.01
BATHROOM 2
BATHROOM 1
REF: 01/A3.02 FOR
THRESHOLD DETAIL
REF: 01/A9.02 FOR
THRESHOLD DETAIL
1' - 4" 2' - 10" 2' - 6"
B
6' - 0"
2' - 9" 1' - 3"
TOWEL BAR
CLO
3' - 0 1/2"
04
A3.01
Sim
1' - 4"
4' - 3"
TOWEL BAR
5' - 0"
2' - 9" 3' - 1 1/2"
CT-1
FRAMELSS
SLIDING GLASS
SHOWER DOOR
CT-1
PT-1
2' - 2"
5' - 0"
CAB-2
MIRROR
LT-1
CT-1
FRAMELSS SLIDING
GLASS SHOWER
DOOR
3' - 1 1/2"
2' - 7 1/2" 6"
3' - 4"
TILE BACKSPLASH
PT-1
FRAMELSS
SLIDING GLASS
SHOWER DOORS
CT-1
6' - 0"
2' - 2"
CT-1
P-1
CAB-2
MIRROR
LT-1
CT-1
FRAMELSS
SLIDING GLASS
SHOWER DOOR
2' - 9" 2' - 7 1/2" 6" 6" TILE BACKSPLASH
2' - 10"
3' - 4"
CT-1
PT-1
CT-1
2' - 9"
TOWEL BAR,
STAINLESS STEEL
FRAMELESS
GLASS SLIDING
SHOWER DOOR
3' - 8"
CT-1
PT-1
GENERAL NOTES
1. REFER TO SHEET A1.01 FOR PARTITION TYPES
2. REFER TO SHEET A1.01 FOR DOOR INFORMATION, SCHEDULES AND
DETAILS.
3. REFER TO SHEET A9.01 AND SPEC FOR FINISH INFORMATION
4. REFER TO SHEET A3.01 AND A3.02 FOR CASEWORK DETAILS AND
INFORMATION.
5. ALL EXTERIOR DIMENSIONS ARE FROM FACE OF EXTERIOR FINISH, U.N.O.
6. ALL NEW CEILINGS SHALL MATCH EXISTING CEILING HEIGHTS
7. REFER TO SHEET A3.40 FOR LIGHTING SPECS
8. CONTRACTOR SHALL VERIFY LOCATION OF ALL LIGHT FIXTURES AND
COORDINATE INSTALLATION WITH THE MECHANICAL AND ELECTRICAL
CONTRACTORS. NOTIFY ARCHITECT/DESIGNER OF ANY CONFLICTS PRIOR
TO INSTALLATION.
FINISH PLAN GENERAL NOTES
1. ALL EXISTING AND NEW INTERIOR WALLS TO BE PAINTED PT-1, UNO.
2. PREP FLOOR TO RECEIVE NEW FINISHES. ALL FINISHES SHALL BE
INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS
AND RECOMMENDATIONS FOR THE SPECIFIC SUBSTRATE.
3. SEE SHEET A3.40 FOR FINISH LEGEND
4. SEE THE INTERIOR ELEVATIONS AND RCP FOR ADDITIONAL FINISH
INFORMATION
5. SEE SHEET A3.02 FOR FLOOR TRANSITION DETAILS
6. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR UNO.
7. ALL PAINTED SURFACES TO RECEIVE (1) COAT PRIMER AND (2) FINISH
COATS MIN. AS REQUIRED TO ACHEIVE UNIFORM COVERAGE AND FINISH.
8. PAINT ALL GYP BD CEILINGS P-3 UNO.
9. PROVIDE SAMPLES OF ALL FINISH MATERIALS TO DESIGNER FOR
APPROVAL PRIOR TO COMMENCEMENT OF WORK
10. SHOULD THE CONTRACTOR FIND ANY DISCREPENCIES, OMISSIONS,
AMBIGUITIES OR CONFLICTS ON THE PLANS, HE SHOULD BRING ITEMS TO
THE ATTENTION OF THE ARCHITECT/DESIGNER BEFORE PROCEEDING
WITH ANY WORK IN QUESTION
11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS AND
APPROPRIATE QUANTITY OF MATERIALS
PROJECT NUMBER
ISSUE DATE
710 W. COLFAX; DENVER, C0 80204
REVISION
SHEET TITLE
ISSUE
SHEET NO.
521 EAST LIONSHEAD CIRCLE
VAIL, COLORADO 81657
A1.03
ENLARGED PLANS AND
ELEVATIONS
14040.000
TENANT IMPROVEMENTS
SUITE 301
& 302
CONSTRUCTION
DOCUMENTS
AUGUST 04, 2014
3/4" = 1'-0" 01ENLARGED PLAN - BATHROOMS
3/8" = 1'-0"
05BATHROOM 1 - EAST
3/8" = 1'-0" 06BATHROOM 1 - SOUTH
3/8" = 1'-0"
02BATHROOM 2 - NORTH
3/8" = 1'-0"03BATHROOM 2 - EAST
3/8"= 1'-0"04BATHROOM 2 - WEST
NOTE:
REFERENCE SHEET A3.40 FOR
TILE BASE DETAILS
NOTE:
REFERENCE SHEET A3.40 FOR
TILE BASE DETAILS
NOTE:
REFERENCE SHEET A3.02 FOR
TILE BASE DETAILS
NOTE:
REFERENCE SHEET A3.40 FOR
TILE BASE DETAILS
NOTE:
REFERENCE SHEET A3.40 FOR
TILE BASE DETAILS
No. Description Date
302PEC
APPROVED
9/8/2014 12:00:00 AM