HomeMy WebLinkAboutPEC150037 Action Form.pdfPlanning and Environmental Commisson
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: PEC Conditional Use Permit PEC Number: PEC150037
Project Description:
Participants:
CUP Application to locate 149.22 SF of public parking on Tract F-2, Vail Village 4th Filing &
redevelop existing tennis courts as 6 pickle ball courts.
OWNER TOWN OF VAIL 12/15/2015
75 S FRONTAGE RD
VAIL, CO
81657
APPLICANT TOWN OF VAIL 12/15/2015 Phone: 970-479-2161
75 S FRONTAGE RD
VAIL, CO
81657
Project Address: 461 VAIL VALLEY DR VAIL Location: Golden Peak Pickleball Courts
Legal Description: Lot: C Block: SC Subdivision: VAIL VILLAGE FILING 5
Parcel Number: 2101-082-3600-4
Comments:
BOARD/STAFF ACTION
Motion By: Gillette
Second By: Lockman
Vote: 5-0
Action: APPROVED
Date of Approval: 02/22/2016
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 300
(PLAN): PEC approval shall not be not become valid for 20 days following the date of
approval.
Cond: CON0014432
1. Applicant shall at all times abide by the Conditional Use Permits regulations,
Chapter 16, Title 12 of the Vail Town Code.
2. This conditional use permit shall lapse and become void if a building permit is
not obtained and diligently pursued toward completion or the approved use has not
commenced within two (2) years from the date of approval. Any conditional use which
is discontinued for a period of two (2) years, regardless of any intent to resume
operation, shall not be resumed thereafter; any future use of the site or structures
thereon shall conform to the provisions of Title 12, Vail Town Code.
3. The parking area approved by this conditional use permit is a seasonal use which
shall be made available annually for snow storage between December 1 and April 1 of
the following year.
4. Hours of operation shall be from dawn to dusk.
5. Artificial lighting of the courts is prohibited.
6. Amplified sound and loudspeakers are prohibited.
7. If there is a demonstrable need to address noise problems, the conditional use
permit shall be brought back to the PEC for review of the most appropriate sound
mitigation features. (As amended by PEC at public hearing.)
8. Prior to demolition of existing courts and/or construction of new courts,
applicant shall install silt fencing or other appropriate erosion control features
to prevent degrading of water quality in the creek to the east of the courts. These
erosion control features shall remain in place until the final landscaping is
installed and vegetation is established.
9. Prior to start of construction or issuance of a building permit, the applicant
shall obtain approval from the Design Review Board with a specific finding that the
location of the courts is not detrimental environmentally and/or aesthetically.
10. The proposed sidewalk and patio pavement shall be constructed with permeable
pavers or similar porous materials provided they remain ADA compliant. Also, that
the Planning and Environmental Commission strongly recommends that the water quality
improvement projects that are part of the Gore Creek Action Plan for this area be
installed in conjunction with this project. (As amended by PEC at public hearing.)
Planner: Chris Neubecker PEC Fee Paid: $0.00