HomeMy WebLinkAboutPEC160002_PEC160002 Narrative_1452537240.pdf VAIL CASCADE
HOTEL
MAJOR A MENDMENT
TO SPECIAL
DEVELOPMENT
To allow for improvements to the
Vail Cascade Hotel
Submitted to the Town of Vail:
January 11, 2016
Table of Contents
I.Introduction 2
II.Summary of Proposed Modifications 6
III.Zoning Analysis 8
A. Parking 8
B.Employee Housing 11
IV.Criteria for Review 13
V.Conclusion 16
VI.Adjacent Addresses 17
1
I.Introduction
In December of 2015, Vail Hotel Partners LLC purchased the Vail Cascade Hotel. The purchase
included all of the hotel, the Cornerstone Property (option to purchase pending), two levels of parking
in the existing parking structure, and the
Cascade Club. Vail Hotel Partners LLC
is proposing to invest another $20 to
$30 million into the renovation of the
Vail Cascade Hotel and the Cascade
Club and rebrand the hotel as a
Starwood Luxury Collection hotel. As
one of the largest conference hotels in
Vail, the improvement of this
community asset will continue to
provide significant public benefits in
terms of public revenues and vitality to
the entire community. Many of the
proposed changes do not require
approval by the Town of Vail Planning
and Environmental Commission or the
Town Council, and are reviewed only at
a staff level or by the Design Review
Board. However, some of the
proposed interior improvements cause
a reduction in the number of existing
accommodation units, which triggers a
Major SDD amendment application.
Mauriello Planning Group, representing
the new ownership, is requesting a
Major Amendment to Special
Development District No. 4 to allow
for a decrease in the number of
accommodation units by seven units (3
units based on the SDD ordinance as
explained further herein). Section
12-9A-2 of the Vail Town Code defines
a Major SDD Amendment as follows:
MAJOR AMENDMENT (PEC
AND/OR COUNCIL REVIEW): Any
proposal to change uses; increase
gross residential floor area; change
the number of dwelling or
accommodation units; modify,
enlarge or expand any approved
special development district (other than "minor amendments" as defined in this section), except as
provided under section 12-15-4, "Interior Conversions", or 12-15-5, "Additional Gross Residential Floor
Area (250 Ordinance)", of this title.
2
Existing Entry Lobby
Proposed Entry Lobby FF&E and Finishes
The Vail Cascade Hotel is located at 1300 Westhaven Drive. The property is part of Area A of Special
Development District No. 4, Cascade. Cascade Village was annexed to the Town in 1975 with an
approved development plan from Eagle County. It was established as Special Development District No.
4 in 1976. The SDD has been amended over 40 times in the last 40 years. Unlike most SDDs, the
Cascade SDD has no underlying zoning and all development standards and uses are provided in the
adopting ordinance. According to the most recent ordinance, the Vail Cascade Hotel was to have a
maximum 288 accommodation units. However, in reality there are 292 accommodation units. It
appears this change was made in the mid-1990’s but no specific amendment was identified. It is evident
that over the years with the changes in terminology within the ordinances and with the number of
amendments, that an error in the accommodation unit count occurred.
The proposed renovations cause a reduction in the number of existing units of 7 accommodation units.
Five of the units being removed are in marginal locations within the hotel and represent rooms that are
occupied infrequently. Below is a chart indicating the number of existing accommodation units and
proposed accommodation units. The reduction is a loss of 7 accommodation units from what is
existing on-site today, but only a reduction of 3 accommodation units from what the SDD identifies as
the maximum.
It is only the loss of the seven hotel rooms that generates the need for this Major Amendment
application. The loss of four of the accommodation units is a result of the addition of a hotel spa,
intended to serve guest of the hotel, on the lowest level of the hotel where there are currently
administrative functions. One accommodation unit will be converted into the new library, in an area
that is across from the retail market space and in a high traffic area. The remaining two accommodation
units are lost due to the creation of two presidential suites. Each new presidential suite is created by
the combination of two existing
accommodation units. No hotel
room floor area is removed for the
creation of these suites. This allows
the new owners to diversify the
hotel product as part of the new
branding effort. The creation of the
spa area, the addition of the library,
and the creation of the presidential
suites are all improvements
necessary to address Starwood
Luxury Collection standards.
In addition to the loss of the
accommodation units which generate
the need for a Major SDD
Table 1: Accommodation Units
AU per SDD AU as constructed AU as Proposed
288 292 285
3
Existing Guest Rooms
amendment, there are other proposed improvements that do not require approval by the Town Council
as a major amendment including, but not limited to, the following:
Updated and completed renovated
hotel rooms
Refreshed corridors and public areas
Bar and restaurant improvements
Lobby and entry remodel
Improvements to the lounge,
reception area, living room, game
room, and library
Updated restroom facilities
Conference and meeting room
renovations
Retail market enhancements
New spa and salon area - guest
focused
New fitness area for guests only
New kids indoor recreation area
New porte-cochere and glass
vestibule at entry
Terrace addition and improvements
Exterior window, balcony, and limited
facade improvements
These improvements are a positive
investment to this hotel complex. The hotel
will be under the Starwood Luxury Collection. Starwood is one of the leading hotel and leisure
companies in the world, with more than 1,270 properties in 100 countries. The Starwood brands
include the eleven distinct lifestyle brands: St. Regis, The Luxury Collection, W, Westin, Le Meridien,
Sheraton, Tribute Portfolio, Four Points, Aloft, and Element. The Starwood Preferred Guest loyalty
program is one of the industry’s leading loyalty programs. The Cascade will be a new offering of
Starwood’s Luxury Collection.
The Luxury Collection is an ensemble of more than 75 of the world’s finest hotels and resorts in more
than 30 countries. All are noteworthy for their history, architecture, art, furnishings and amenities,
highlighting the rich culture of each property’s fabulous surroundings. Starwood describes the Luxury
Collection as follows:
The Luxury Collection® (luxury full-service hotels and resorts) is a group of unique hotels and resorts
offering exceptional service to an elite clientele. From legendary palaces and remote retreats to timeless
modern classics, these remarkable hotels and resorts enable the most discerning traveler to collect a
world of unique, authentic and enriching experiences indigenous to each destination that capture the
sense of both luxury and place. They are distinguished by magnificent decor, spectacular settings and
impeccable service.
The Vail Cascade Hotel is the second largest hotel in Vail and includes extensive conference facilities.
Only the Vail Marriott, with 314 accommodation units, is larger. At 285 accommodation units
4
Mood Images of the Proposed Guest Room Remodel
(proposed), the Vail Cascade Hotel represents a significant proportion of the hotel bed base in Vail. The
intent is to increase occupancy of the hotel and the average daily rate throughout all seasons with the
rebranding effort and the approximately $20 million in proposed renovations. There will be significant
focus on the group and conference market bringing in new groups to ensure improved occupancy.
With the Starwood Luxury Collection focus on customer service and satisfaction, the Vail Cascade
Hotel will strengthen Vail’s competitive image in the resort market. The Vail Cascade Hotel will have the
entire Starwood marketing, booking systems, and loyalty program supporting it. All of this generate an
immense benefit to the Town of Vail.
5
II.Summary of Proposed Modifications
A complete set of plans identifying the existing uses and all proposed modifications has been submitted
with this application for a Major Special Development District Amendment. The proposed
modifications, as budget allows, are summarized below for reference.
(A)Bar and Restaurant Improvements: The existing lobby bar, Fireside Lounge, will be
relocated to within the existing restaurant. The restaurant will be upgraded to reflect the
new aesthetic of the hotel, including new tables, chairs, floor coverings, artwork, etc.
(B)Lobby Remodel: The entry lobby will be refreshed to create a more welcoming
environment as guests enter the hotel. Lighter furnishings and a more modern aesthetic will
improve the feel upon entry.
(C)Fireside Lounge, Reception Area, Living Room, Game Room, Library Improvements:
These public areas will all be updated with new finishes and furnishings to create a more
modern mountain luxury hotel, with new amenities to provide a better guest experience.
One hotel room (Room 143) will be converted to the new library.
(D)Updated Restrooms: The public area restrooms will be updated and improved.
(E)Conference and Meeting Room Improvements: A key part of the new hotel ownership
is an increase in bookings for conferences and meetings. This new focus is part of the
business model to increase hotel occupancy in the summer and shoulder seasons through
group business. The conference and meeting rooms will be upgraded to reflect the new
modern aesthetic.
(F)Market Improvements: The hotel retail market will be updated to match the new
aesthetic and modernize the experience. The market is being expanded into existing retail
space previously occupied by Pepi’s sports.
(G)New Spa and Salon Area: The Starwood Luxury Collection requires a spa within the
primary hotel to serve hotel guests. The new spa will be located on the basement level and
eliminates four existing hotel rooms (Rooms 33, 35, 37, and 39) and the Creekside meeting
room. It consists of 10 treatment rooms, along with the reception area, and relaxation
room. A small salon of 650 sq. ft. will also be added, located within space that was previously
administration offices. The spa and salon uses are considered accessory to the hotel use. As
these accessory uses, there are no new parking or employee housing requirements
associated with this use as they do not add new net floor area to the building and are
generally limited to hotel guest use.
(H)New Fitness Area: The Starwood Luxury Collection requires a fitness center within the
primary hotel facility. The new fitness area will be located within an area that is currently
administrative and other staff areas. It is approximately 2,700 sq. ft., and includes a fitness
area and men’s and women’s locker rooms that are shared with the spa facility. The fitness
area is considered an accessory use to the hotel use. Because this use is to serve only the
hotel guest as an amenity and no net floor area is being added, there are no new parking or
employee housing requirements associated with this use.
(I)New Kids Recreation Area: A small kids area, of approximately 650 sq. ft. is proposed.
Guests, while using the spa or fitness area, will have the opportunity to drop off children for
activities. The area will be staffed with a “camp” counselor. The area for this space is
currently staff and administrative areas.
6
(J)New Porte-Cochere and Glass
Vestibule at Entry: A new porte-
cochere is proposed, with the intent to
provide a more dramatic entry
statement to the hotel. The porte-
cochere will be extended to the
landscape island and will be raised to
provide clearance for large vehicles and
buses. A small vestibule beneath the
porte-cochere will provide additional
coverage from the elements and provide
an airlock for entry into the hotel.
(K)Terrace Improvements: The terrace
adjacent to the new spa and fitness area
on the south side of the building will be
updated with new furnishings an amenities to serve the guest. The upper terrace will be
extended increasing the area of this outdoor amenity with lounging areas and a new stair
connects the lower terrace with the upper terrace and the entry level of the hotel.
(L)Front Exterior Improvements: Within the hotel entry plaza, stone bases will be added to
the columns and decorative panels will be added to the recessed areas within the colonnade.
The landscape island will be
modified slightly. The
improvements will enhance
the entry experience and
create a grander feature for
guests upon arrival.
7
Proposed Porte-Cochere
Proposed Exterior Improvements to the Entry Plaza
III.Zoning Analysis
Due to the nature of the addition, only certain development standards are affected by the project.
Below is an analysis of the proposal with regard to these development standards. All other standards
remain as approved by Special Development District No. 4.
A. Parking
Parking for Special Development District No. 4 is more complicated than other stand alone
development projects. Generally, parking for the uses within Area A are served by the existing
three level parking structure. This parking structure has 421 parking spaces. Parking
requirements are calculated for each use, then a multiple use reduction of 10% is taken. Parking
spaces are not allocated or assigned to each use by the SDD ordinance and the structure
functions much like the Town’s public parking structures as a mixed use facility serving the hotel,
condominium projects, retail and commercial spaces, and skier parking for the Cascade Village
ski lift. Private covenants and agreements are in place which allocates parking on certain levels
to uses. The parking situation is further complicated by the private ownership of level 3 of the
parking structure which was permitted by a court in a bankruptcy action in the 1980s. The
Level 3 owner is obligated to provide parking to serve the commercial uses within Cascade
Village pursuant to the SDD and obligated to provide public parking during the ski season per
covenant. Earlier this year, the new owners of the hotel were approved (Minor SDD
amendment) to convert the three indoor tennis courts to a parking facility with an additional 81
parking spaces. This parking is in excess of any requirements of the SDD ordinance and allowed
for private hotel use. The new parking will help the hotel provide additional parking to serve its
hotel guests and conference attendees and will in turn free up public parking in other facilities.
Below is the existing parking calculation based on the most recent SDD Ordinance No. 8:
Table 2: Zoning Analysis
Standard Existing/Allowed Proposed
Density - Accommodation Units 292 (as constructed)
288 (per SDD Ordinance)
285
GRFA (in AUs in Vail Cascade Hotel only)120,731 sq. ft.118,708 sq. ft.
Setbacks Per approved plans
Compliant with Creek Setback
No Change
Employee Housing As prescribed by the SDD Ordinance No change
8
Below is the proposed parking calculation based on the proposed Major SDD Amendment. The
Fireside Lounge bar has been eliminated from the parking calculation, as the bar is proposed to
be relocated to within the existing restaurant and takes up space previously used for restaurant
seating area. The number of accommodation units and GRFA for the Vail Cascade Hotel has
been updated to reflect the proposed changes. Pepi’s Sports space and the market have been
updated to reflect some minor changes that decreased the total retail area as a result of at the
addition of the condominium check-in area.
Table 3: Existing Parking Calculation From Ord. 5, Series of 2008
Development Dwelling
Units
Accommo
dation
Units
GRFA EHU Net
Floor
Area
Parking
Provided On-
Site
Parking
Required in
Structure
Liftside 29 48,600 2 56
Westhaven Condo 13 32,000 29
Millrace (Phase I, II, IV)39 47,984 64
The Cascades (formerly
Millrace Phase III)6 11,987 12
Cascade Residences 22 47,151 13 16
Blue Tiger (empty restaurant)1,600 13.3
Office/Retail 5,061 16.3
Vail Cascade Hotel 148 55,457 115
Chaps Restaurant 4,735 39.5
Hotel Cafe 2,160 18
Pepi’s Sports 2,491 8
Fireside Bar 1,800 15
Terrace Rooms 120 58,069 105
Terrace Retail 5,856 20
Plaza Rooms 20 7,205 16
Plaza Retail 2,024 7
Plaza Conference 8,297 35
Aria Fitness Club 5,886 30
Cornerstone 22 48,407 4 623 56
Total 131 288 356,860 6 40,533 230 454.1
Multiple Use Credit (10%)-45.41
Total Parking Required in
Structure 408.69
Total Parking Provided in
Structure
421
Total Surplus in Parking
Structure 12.31
9
B.Employee Housing
Section 12-23-4: REDEVELOPMENT, Vail Town Code describes when employee housing impacts
are mitigated for redevelopment projects. This section states:
Employee housing impacts need only be mitigated for a redevelopment that results in a greater
number of employees generated from an increase in net floor area, or an increase in the
Table 4: Parking Calculations based on this Proposed SDD Amendment
Development Dwelling
Units
Accomm
odation
Units
GRFA EHU Net Floor
Area
Parking
Provided
On-Site
Parking
Required in
Structure
Liftside 29 48,600 2 56
Westhaven Condo 13 32,000 29
Millrace (Phase I, II, IV)39 47,984 64
The Cascades (formerly Millrace
Phase III)6 11,987 12
Cascade Residences 22 47,151 13 16
Blue Tiger (empty restaurant)1,600 13.3
Office/Retail 5,061 16.3
Vail Cascade Hotel 145 53,434 111
Hotel Restaurant 3,250 27.1
Fireside Bar (eliminated)
Hotel Market 1,095 3.65
Retail Shop 1,096 3.65
Terrace Hotel Rooms 120 58,069 105
Terrace Retail 5,856 20
Plaza Hotel Rooms 20 7,205 16
Plaza Retail 2,024 7
Plaza Conference 8,297 35
Cascade Hotel Excess Capacity
Reservation
50.1
Aria Fitness 5,886 30
Cornerstone 22 48,407 4 623 56
Total 131 285 354,837 6 34,788 230 454.1
Multiple Use Credit (10%)-45.4
Total Parking Required in Structure 408.7
Total Parking Provided in Existing
Structure 421
New Hotel Parking Provided with
Minor Amendment 81
Total Surplus Parking 93.33
10
number of accommodation units or limited service lodge units in the redevelopment; provided
however, that if any existing EHUs are to be removed, an equal amount of EHUs shall be
replaced in addition to the other requirements of this chapter.
Section 12-23-5: EXEMPTIONS, Vail Town Code, specifically exempts certain development from
the requirements of the Commercial Linkage requirements, stating:
The following shall be exempt from this chapter:
A.The redevelopment of existing commercial development, if no new net floor area,
accommodation units, or limited service lodge units are created; and
B.The construction of EHUs.
As indicated on the plans submitted for the proposed Major Special Development District
Amendment, there is no increase in net floor area. “Net Floor Area” is a defined term in the
Vail Town Code, and is defined as follows by Section 12-2-2: DEFINITIONS OF WORDS AND
TERMS, Vail Town Code:
FLOOR AREA, NET: The total floor area within the enclosing walls of a structure not including
the following:
a.Areas specifically designed and used for mechanical equipment to operate the building.
b.Stairways.
c.Elevators.
d.Common hallways.
e.Common lobbies.
f.Common restrooms.
g.Areas designed and used for parking.
h.Areas designed and used as storage which do not have direct access to an individual office
or retail store, not to exceed five percent (5%) of the total proposed net floor area for office
and not to exceed eight percent (8%) of the total proposed net floor area for retail.
"Common areas" are spaces for which all tenants in the building contribute toward the upkeep
and maintenance thereof and are not used for employee working areas.
Because this proposal is redevelopment of existing commercial development (a hotel) which
does not contain “common areas” and where no new net floor area, accommodation units, or
limited service lodge units are created, it is exempt from any commercial linkage requirements.
Changes in use within an existing building where no new floor area is created are exempt from
Commercial Linkage Requirements. For the sake of argument, if one were to examine the
changes being made to the hotel and applied the commercial linkage standards, no net new
employees are being created as demonstrated by the table below. To be conservative, no credits
were taken for the uses that were converted to the spa, salon, and guest fitness center, with the
exception of the Creekside Meeting Room, which would have further reduced the
requirements.
11
Table 5: Hypothetical Employee Housing Generation
Use Change in use Employee Housing Calculation
Spa 5,800 12.2
Salon 650 1.6
Fitness Center 2,701 2.6
Hotel Room (-)7 -4.9
Fireside Bar (-)1,800 -12.2
Market & Pepi’s (-)499 -1.2
Creekside Meeting Room (-)1,550 -1.2
Total -3.2
20% mitigation rate -0.6
12
IV.Criteria for Review
Section 12-9A-2: DEFINITIONS, Vail Town Code defines a Major Amendment as follows:
Any proposal to change uses; increase gross residential floor area; change the number of dwelling or
accommodation units; modify, enlarge or expand any approved special development district (other than
"minor amendments" as defined in this section), except as provided under section 12-15-4, "Interior
Conversions", or 12-15-5, "Additional Gross Residential Floor Area (250 Ordinance)", of this title.
Section 12-9A-8: DESIGN CRITERIA AND NECESSARY FINDINGS, Vail Town Code, then provides the
criteria for review of a Major Amendment to a Special Development District. These criteria have been
provided below, along with an analysis of how this proposal complies with these criteria:
1.Compatibility: Design compatibility and
sensitivity to the immediate environment,
neighborhood and adjacent properties relative
to architectural design, scale, bulk, building
height, buffer zones, identity, character, visual
integrity and orientation.
Applicant Response: The proposed
modification to eliminate seven
accommodation units has no impact on
the compatibility of the building to the
immediate environment, neighborhood
and adjacent properties. The only exterior
modification included with this proposal is
for the new porte-cochere and small
glass-enclosed vestibule beneath the
porte-cochere. In addition, there are
some areas of extension of patios or
terraces. Improvements are proposed for
the entry area, including architectural
panels in the recessed areas of the
colonnade and the addition of stone to the
columns. These items are only subject to
DRB approval will be reviewed by the DRB
at a future date. These changes improve
the appearance of the Vail Cascade Hotel
and provide a grander entry experience for
the guest. As a result, there is only a
positive impact to the architectural design,
scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. The
project is therefore compatible and sensitive to the immediate environment, neighborhood, and
adjacent properties.
13
Existing Porte-Cochere
Proposed Porte-Cochere
2.Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship
with surrounding uses and activity.
Applicant Response: The proposed modifications improve the existing hotel, updating the hotel
to its new Luxury Collection status. Because the overall use of the property remains the same,
and the density is only a slight decrease of 7 accommodation units or a 2% decrease, the uses,
activity, and density continue to provide a compatible, efficient, and workable relationship with
surrounding uses and activities.
3.Parking And Loading: Compliance with parking and loading requirements as outlined in chapter 10 of
this title.
Applicant Response: A parking analysis has been provided in Section III of this submittal. As
indicated in the analysis, the parking complies with Chapter 12-10 of the Vail Town Code. The
proposed changes have no impact on the loading requirements of the Special Development
District, as there is a decrease of the overall impact.
4.Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies
and urban design plans.
Applicant Response: Cascade Village does not have a specific master plan beyond the Vail Land
Use Plan to provide guidance on development within the area. The following land use goals and
policies from the Vail Land Use Plan are
applicable to the project:
1. General Growth / Development
1.1. Vail should continue to grow in a
controlled environment, maintaining a
balance between residential,
commercial and recreational uses to
serve both the visitor and the
permanent resident.
1.3. The quality of development should
be maintained and upgraded
whenever possible.
3. Commercial
3.1. The hotel bed base should be
preserved and use more efficiently.
3.3. Hotels are important to the
continued success of the Town of Vail,
therefore conversion to condominiums
should be discouraged.
The Land Use Map identifies Cascade
Village as “Resort Accommodations and
Services.” This designation is defined as
follows:
14
Future Land Use Map from the Vail Land Use Plan
RAS Resort Accommodations and Service
This area includes activities aimed at accommodating the overnight and short-term visitor to the
area. Primary uses include hotels, lodges, service stations, and parking structures (with densities
up to 25 dwelling units or 50 accommodation units per buildable acre).
The proposal conforms with the goals outlined in the Vail Land Use Plan, and specifically futures
the goal to “upgrade the quality of development whenever possible.” These improvements to an
aging hotel and the rebranding of the Vail Cascade Hotel as part of the Starwood Luxury
Collection, will improve Vail’s hotel offerings and contribute to Vail’s continuing success. The
reduction in hotel rooms is necessary to achieve the Luxury status and these are not being
converted to condominiums, but rather to new services to serve the guest of the hotel and to
diversify the hotel’s room offerings.
5.Natural And/Or Geologic Hazard: Identification and mitigation of natural and/or geologic hazards that
affect the property on which the special development district is proposed.
Applicant Response: The proposed amendment has has no effect on the above criterion. There
are no natural or geologic hazards that affect the property.
6.Design Features: Site plan, building design and location and open space provisions designed to produce a
functional development responsive and sensitive to natural features, vegetation and overall aesthetic
quality of the community.
Applicant Response: There are no changes to the site plan, building design and location, and
open space provisions. As a result, the proposal complies with the above criterion.
7.Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic
circulation.
Applicant Response: The proposed amendment has no effect on the existing circulation system.
and therefore complies with the proposed criterion.
8.Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve
natural features, recreation, views and function.
Applicant Response: The proposed amendment has no effect on the above criterion as there
are no proposed changes to the existing landscaping.
9.Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient
relationship throughout the development of the special development district.
Applicant Response: The proposed amendment has no effect on the above criterion.
15
V.Conclusion
Vail Hotel Partners LLC is proposing to invest $20 to $30 million into the renovation of the Vail
Cascade Hotel and the Cascade Club and rebrand the hotel as a Starwood Luxury Collection hotel. As
one of the largest conference hotels in Vail, the improvement of this community asset will continue to
provide significant public benefits in terms of public revenues and vitality to the entire community.
These improvements are a positive investment to this hotel complex. While there is a slight decrease
in actual key count, with this investment the hotel will improve its average daily rate and improve its
ability to put heads in beds. The majority of the seven keys being lost are marginal rooms in terms of
guest experience. The intent of the changes is to improve the guest experience and attract new
customers through groups and marketing reach of Starwood. Work on this renovation is set for the
spring of 2016 and with a target of a soft opening by winter of 2016.
16
VI.Adjacent Addresses
RANGEL, FRANCISCO MILMO - CLARIOND, MARIA
LUCIA LOPEZ
124 SAN ANGEL AVE
NUEVO LEON CT
MEXICO
KERR, ANN J. & EDWIN PIERCE, III
1617 E QUINCY AVE
CHERRY HILL VILLAGE, CO 80113-4809
COLORADO INVESTMENTS LLC
3101 S OCEAN DR APT 2903
HOLLYWOOD, FL 33019-2838
JOHN L. ALFOND 2004 TRUST
IN CARE OF NAME DEXTER FAMILY OFFICE
2 MONUMENT SQ
PORTLAND, ME 04101-4093
MARC B. LESSANS REVOCABLE TRUST
PO BOX 685
FREDERICK, MD 21705-0685
PEDIGO, JAMES & RUTH ANN
PO BOX 950356
LAKE MARY , FL 32795-0356
MCMAHON TRUST
732 HAMPDEN PL
PACIFIC PALISADES, CA 90272-4345
BRAMANTE, ELEANOR
1285 WESTHAVEN CIR
VAIL, CO 81657-5700
ST. MORITZ HOLDINGS LLC
1490 W CANAL CT STE 3000
LITTLETON, CO 80120-5648
TOWN OF VAIL FINANCE DEPT
75 S FRONTAGE RD W
VAIL, CO 81657-5043
BEARD, STANLEY S. & BONNIE K.
500 W TEXAS AVE STE 705
MIDLAND, TX 79701-4276
BLUE OX LLC
17 CAMPBELL RD
WAYLAND, MA 01778-1001
LIPNICK, JANIE B.
6238 29TH ST NW
WASHINGTON, DC 20015-1510
WESTHAVEN LLC
1825 K ST NW STE 507
WASHINGTON, DC 20006-1221
H&C STONE REVOCABLE TRUST
615 PALISADES AVE
SANTA MONICA, CA 90402-2723
ANNETTE G. FREY REVOCABLE LIVING TRUST
12604 E 127TH ST S
BROKEN ARROW, OK 74011-5650
NANCY ANN HEINEN TRUST, NANCY ANN HEINEN
TRUSTEE
2565 SOM CENTER RD
HUNTING VALLEY, OH 44022-6651
WESTHAVEN AT CASCADE VILLAGE ASSOCIATION
VAIL CASCADE CONDOMINIUMS
1476 WESTHAVEN DRIVE, #1
VAIL, CO 81657
OLIVER, ROBERT LEON
PO BOX 976
CUERO, TX 77954-0976
FLOWER, ELIZABETH RAMSEY - ETAL
19023 HIGHWAY 131
BOND, CO 80423-9500
THE COLORADO MOUNTAIN CONDOMINIUM
ASSOCIATION, INC.
VAIL CASCADE CONDOMINIUMS
1476 WESTHAVEN DR, #1
VAIL, CO 81657
ULTIMATE CASCADE LLC - ETAL
825 DELAWARE AVE #203
LONGMONT, CO 80501-6169
MILLRACE CONDOMINIUM ASSOCIATION
JULIE GRIMM
710 WEST LIONSHEAD CIRCLE, SUITE B
VAIL, CO 81657
CASCADES ON GORE CREEK OWNERS ASSOC INC
1476 WESTHAVEN DR
VAIL, CO 81657-4321
LIFTSIDE CONDOMINIUM ASSOCIATION
VAIL CASCADE CONDOMINIUMS
1476 WESTHAVEN DR
VAIL, CO 81657
MAURIELLO PLANNING GROUP
PO BOX 4777
EAGLE, CO 81631
CDOT
4201 E. ARKANSAS AVENUE,
17
DENVER CO. 80222.
FEDERAL HIGHWAY ADMINISTRATION
1200 NEW JERSEY AVE., SE
WASHINGTON, DC 20590
BLUME FAMILY PTNSHP
IN CARE OF KRISTEN BLUME
PO BOX 504
CHEYENNE, WY 82003-0504
DEWS, JULIANNA
PO BOX 362
VAIL, CO 81658-0362
CASCADE CLUB ASSOCIATION
DON MACLACHLAN
1300 WESTHAVEN DR,
VAIL, CO 81657, UNITED STATES
18