Loading...
HomeMy WebLinkAboutPEC160009_A2-R_1465853400.pdfWOMEN 102 HC / WC WC MEN 101 Concrete Floor Concrete Floor HC / WC 1 2 3 4' - 8" 4' - 8" A B C 16' - 4" 11' - 10" 4' - 6" A.1 B.1 C.1 1.1 2.1 3.1 11' - 0" 6' - 4" 4' - 8" 4' - 6"11' - 10" 4 4' - 8" 14' - 0" A3-R 3 - - - -16' - 4" 1 A4-R 2 A4-R 3 A4-R 4 A4-R PLUMBING SPACE 5 A4-R D - --- - ---6' - 0" - --- - --- - - FD FD SOLID SURFACE PARTITIONS SOLID SURFACE PARTITIONS 11 11 3 4 102 101 11 0' - 10 1/2" 2' - 10" 0' - 9 1/2" 11 HOSE BIBB / MOP SINK 14' - 0" 0' - 5 1/2" 5' - 0" 3' CLEAR 12' - 10" 2' - 6" 1' - 0" WINDOW ABOVE 0' - 10 1/2" 2' - 10" 0' - 9 1/2"0' - 2 3/4" 0' - 2 3/4" 0' - 2 3/4" 0' - 2 3/4" 11 11 12' - 10"2' - 6"1' - 0" 8' - 5" 0' - 5 1/2" 0' - 9" 0' - 5 1/2" 3' - 0"0' - 5 1/2" 11' - 0" 0' - 5 1/2" 8' - 10 1/2" 0' - 5 1/2" 0' - 9" 0' - 5 1/2" 11 11 8' - 0" FLOOR AREA 287 S.F. 1 2 3 A B C A.1 B.1 C.1 1.1 2.1 3.1 4 1 A4-R 2 A4-R 3 A4-R 4 A4-R ROOF B: STANDARD "LIVE ROOF" ON DRAINAGE / PROTECTION BOARD ON EPDM WATERPROOF MEMBRANE ON FRAMING PER STRUCTURAL W/ 1X6 T&G WOOD DECKING ROOF A: METAL ROOF ON HIGH TEMPERATURE WATERPROOF MEMBRANE ON FRAMING PER STRUCTURAL W/ INSULATION AND 2X4 PLYWOOD 5 A4-R D - --- - --- - --- - --- 8" / 1'-0" 8" / 1'-0" 8" / 1'-0"8" / 1'-0" 1/2" / 1'-0" ROOF B: ROOF STONE PAVER FINISH MIN. 24" FROM BUILDING, 12" FROM EAVE STRUCTURAL PARAPET 1 2 3 A B C A.1 B.1 C.1 1.1 2.1 3.1 4 D 1X6 T&G WOOD SOFFIT 4X8 MDF PLYWOOD 4Z8 MDF PLYWOOD 8" / 1'-0" 8" / 1'-0" 8" / 1'-0" 8" / 1'-0" 7' - 6" 7' - 6" GLU-LAM BEAM GLU-LAM RIDGE BEAM GLU-LAM RIDGE BEAM SHEET NUMBER 1309 ELKHORN DRIVE . VAIL . COLORADO. 81657 970.479.2158 P.O. Box 445 Edwards, CO 81632 ph 970.926.2622 cell 970.471.0667 Ann@DarbyArchitects.com DARBY ARCHITECTS,p.c. DESIGNWORKSHOP Landscape Architecture . Land Planning Urban Design . Tourism . Planning 120 E. Main St. Aspen, CO 81611 (970) 925-8354 Facsimilie (970) 920-1837 Asheville . Aspen . Austin . Beijing . Chicago . Denver . Dubai . Lake Tahoe . Los Angeles W W W . D E S I G N W O R K S H O P . C O M # DATE DESCRIPTION ISSUE DATE REVISIONS DRAWN: REVIEWED: 2/12/2016 1:00:06 PM A2-R REDEVELOPMENT BOOTH CREEK PARK 2900 MANNS RANCH ROAD VAIL. COLORADO 100% DESIGN DEVELOPMENT DOCUMENTS 2-9-2016 SD SET Checker 1505 1/4" = 1'-0" 1 Restroom Plan 1/4" = 1'-0" 2 Restroom Roof Window Schedule Mark Width Height Rough Width Rough Height Head Height Type Comments 1 2' - 6" 2' - 6" 7' - 0" 30" X 30" 14 2' - 6" 2' - 6" 7' - 0" 30" X 30" 3 2' - 6" 2' - 6" 4' - 6" 30" X 30" 6 2' - 6" 2' - 6" 2' - 8" 30" X 30" 8 2' - 6" 2' - 6" 4' - 6" 30" X 30" 10 2' - 6" 2' - 6" 2' - 8" 30" X 30" 12 2' - 6" 2' - 6" 7' - 0" 30" X 30" 13 2' - 6" 2' - 6" 7' - 0" 30" X 30" Door Schedule OmniClass Number Width Height Rough Width Rough Height Thickness Frame Material Fire Rating Comments 23.30.10.00 2' - 10" 7' - 0" 0' - 2" 23.30.10.00 2' - 10" 7' - 0" 0' - 2" 23.30.10.00 3' - 0" 7' - 0" 0' - 2" 23.30.10.00 3' - 0" 7' - 0" 0' - 2" Room Schedule Name Number Floor Finish Base Finish Ceiling Finish Wall Finish Comments WOMEN 102 CONC TILE MDF GWB 4' TILE AT WET AREA MEN 101 CONC TILE MDF GWB 4' TILE AT WET AREA JAN. 103 CONC MDF GWB WATER 104 CONC MDF GWB NORTH NORTH 1/4" = 1'-0" 3 Restroom Plan 7KHJUDVV roof on the restroom building shall be changed to a flat membrane roof with gravel ballast. PEC APPROVED 3/14/2016 12:00:00 AM