Loading...
HomeMy WebLinkAboutPEC160009_L0-00_1465853400.pdfREDEVELOPMENT BOOTH CREEK PARK 100% DESIGN DEVELOPMENT NOT FOR CONSTRUCTION 2 / 12 / 2016 TOWN OF VAIL Public Works Department The redevelopment of Booth Creek Park is a project to create new recreational amenities at an existing neighborhood park. Recreational amenities include a picnic pavilion, playground, public restroom, tennis courts, recreational paths, an activity lawn and passive seating. Located at the gateway to the Booth Creek hiking trail, the new playground will allow children to practice skills useful to future hiking adventures through an artful interpretation to the surrounding landscape. Sheet Index Location Map CIVIL & STRUCTURAL ENGINEER: JVA CONSULTING ENGINEERS 214 8th Street, Suite 210 Glenwood Springs, CO. 81601 Tel: (970) 404-3100 ARCHITECT: DARBY ARCHITECTS 445 Edwards Village Blvd Edwards, CO. 81632 Tel: (970) 949-0774 Project Description Sheet No. Sheet Title Landscape Drawings: GENERAL INFORMATION: L0-00 Cover Ɣ Ɣ L0-01 Existing Conditions Ɣ Ɣ L0-02 Site Reference Hardscape Plan Ɣ Ɣ L0-03 Site Reference Softscape Plan Ɣ Ɣ L0-04 General Information Ɣ Ɣ TREE PROTECTION SERIES: L2-01 Tree Protection Ɣ Ɣ MATERIALS SERIES: L3-01 Materials Plan Ɣ Ɣ L3-02 Materials Plan Ɣ Ɣ L3-03 Materials Plan Ɣ Ɣ L3-04 Materials Plan Ɣ Ɣ LAYOUT SERIES: L4-01 Not Used at This Time GRADING AND DRAINAGE SERIES: Refer to Civil Drawings SITE LIGHTING SERIES: Refer to MEP Drawings SITE DETAILS SERIES: L7-01 Site Details Ɣ Ɣ L7-02 Site Details Ɣ Ɣ L7-03 Site Details Ɣ Ɣ L7-04 Site Details Ɣ Ɣ L7-05 Site Details Ɣ Ɣ L7-06 Site Details Ɣ Ɣ L7-07 Site Details Ɣ Ɣ L7-08 Site Details Ɣ Ɣ L7-09 Site Details Ɣ Ɣ PLANTING PLAN SERIES: L8-01 Planting Plans Ɣ Ɣ L8-02 Planting Plans Ɣ Ɣ L8-03 Planting Plans Ɣ Ɣ L8-04 Planting Plans Ɣ Ɣ PLANTING DETAILS SERIES: L10-1 Planting Details Ɣ Ɣ L10-2 Planting Details Ɣ Ɣ 1/29 LANDSCAPE ARCHITECT: DESIGNWORKSHOP 120 East Main Street Aspen, CO 81611-1787 Tel: (970) 925-8354 Project Vicinity MEP ENGINEER: BEAUDIN GANZE CONSULTING ENGINEERS, INC. 22 Chapel Place Unit AC-201 Avon, CO. 81620 Tel: (970) 949-6108 PROJECT LOCATION I-70 CORRIDOR BOOTH CREEK TOWN OF VAIL GORE CREEK PROJECT BOUNDARY I-70 CORRIDOR VAIL MOUNTAIN SCHOOL BOOTH CREEK N N 1" = .5 Mile 1" = 500' PRE-CONST. SERVICES: R.A. NELSON 51 Eagle Rd #2 Avon, CO. 80482 Tel: (970) 471.3919 TOWN OF VAIL: PUBLIC WORKS DEPT. 1309 Elkhorn Drive Vail, CO. 81657 Tel: (970) 390-4678 IRRIGATION: HYDRO SYSTEMS KDI, INC. 860 Tabor St Lakewood, CO. 80401 Tel: (303) 980-5327 Architecture Drawings: Civil Drawings: Structural Drawings: MEP Drawings: Irrigation Drawings: S0-P General Information Ɣ Ɣ S1-P Foundation and Roof Ɣ Ɣ S0-B General Information Ɣ Ɣ S1-B Foundation and Lower Roof Plan Ɣ Ɣ S2-B Upper Roof Plan Ɣ Ɣ Sheet No. Sheet Title 1/29 Civil Sheet Set: C0-1 Notes, Legend, and Abbreviations Ɣ Ɣ C0-2 Site Demolition Plan Ɣ Ɣ C1-0 Grading and Drainage Plan Ɣ Ɣ C2-0 Utility Plan Ɣ Ɣ C3-0 Horizontal Control Plan Ɣ Ɣ C3-1 Site Details Ɣ Ɣ Picnic Shelter: A1 General Notes Ɣ Ɣ A2 Plans Ɣ Ɣ A3 Elevations Ɣ Ɣ A4 Sections Ɣ Ɣ A5 Sections Ɣ Restroom: A1 General Notes Ɣ Ɣ A2 Plans Ɣ Ɣ A3 Elevations Ɣ Ɣ A4 Sections Ɣ Ɣ A5 Sections Ɣ 2/12 2/12 E1.0 Electrical Cover Sheet Ɣ Ɣ E2.0 Site Electrical Plan Ɣ Ɣ E2.1 Restroom Electrical Plan Ɣ Ɣ M1.0 Mechanical Cover Sheet Ɣ Ɣ M2.1 Restroom Mechanical Plan Ɣ Ɣ Not included at this time. PEC APPROVED 3/14/2016 12:00:00 AM