Overview:
The subject property, Lot C of SDD #34, was originally part of an SDD created in 1972
with an underlying RC Zoning. In 1997 the SDD was modified to create 3 single family
building sites as shown. This SDD only permitted one access from Buffher Creek Road.
In this request the applicant would like to move the building envelope as it is now
defined and create a second access point from Buffher Creek Road. The applicant
believes that permitting a new access point would not have any negative impact on
Buffher Creek Road. (Public Works has expressed preliminary approval) and would
relieve congestion and parking issues for the existing two homes on Lots A and B.
Furthermore, the relocation of the building envelope would permit the future
construction to occur in an open area rather than a relatively dense grove of mature
trees.
Process:
For this project as envisioned, we are requesting three changes to the SDD, each of
which requires a different submittal procedure in the Town of Vail. But since they are all
related we would like to submit the following as an overview and narrative for all the
requests.
Minor Amendment to the SDD: to address the additional road access from Buffher
Creek Road, as well as minor modifications to the existing access and utility easements
and to align the SDD with the current code requirements on retaining walls
Exemption Plat: to relocate the building envelope
Variance: from the 40% slope restriction on the underlying RC zoning. Please note that
all of Lot C is over 40% and this would be required for any construction anywhere on
this property
1. Minor Amendment:
A new road cut for site access:
Section 7 SDD No. 34. 3 Amend the Single Curb Cut.
Currently, the permitted access for Lot C is via easement through Lot B. This
route would cause loss of parking on Lot B, requiring major excavation and loss
of existing tree cover. Alternatively, access could be gained directly from the
bottom of the existing shared driveway. However, this route would also result in
significant loss of existing tree cover. The proposed road cut would allow access
onto Lot C without damage to the vast majority of mature trees on the site and
would relieve parking issues. Please see Attached topographic survey (4080.1
Topo C) from Peak Land Consultants, Inc. dated 5/4/17 for tree locations.
Access and Utility Easement as indicated on the plat:
See attached Exhibit A which maintains the utility easement to benefit Lots A, B
and C but updates the easement to correspond with the proposed access.
Update the SDD to align with current codes regarding retaining walls:
Section 7 SDD No. 34. 7 Amend the Retaining Walls to align with current
guidelines.
Currently Section 7 states ”All Retaining walls on-site shall conform to existing
Vail Town Code requirements. No retaining wall shall exceed 3’ in the first 20’
from the front property line on these lots.” Add-- unless related to access to a
structure constructed on excessive slopes (in excess of 30 percent).
Note this a direct quote from 14-6-7 retaining walls of the Vail Town Code.
Also note that at the time of the SDD the existing Town of Vail retaining wall on
the Northwest (uphill) side had not been constructed.
2. Exemption Plat:
A relocated building envelope:
We request a relocation of the building envelope to the east to correspond to the
road cut access area. As shown on the attached topographic survey (4080.1
Topo C) from Peak Land Consultants, Inc. dated 5/4/17. A relocated building
envelope would leave untouched most of the mature trees on Lot C. The
proposed building envelope shown in Exhibit A shows a building envelope
slightly smaller (14.2 square feet) than the existing envelope. The proposed
building envelope is similar to the existing envelope in size but a portion of the
envelope extends to the front property line to provide for garage and access. The
east line is set 15’ from the east property line to match underlying RC zoning.
3. Variance:
Permission to build on a slope greater than 40%:
This variance matches the other two structures in the SDD and most of the existing
structures on the uphill side of Buffehr Creek Road.
This does not constitute a special privilege. All of Lot C has a slope greater than 40%,
thus this allowance would be required for any building on this site. Adjacent Lots B and
A are also greater than 40%, so this allowance is in keeping with neighboring sites.
There is no effect on light, air, distribution of population, transportation, traffic, public
facilities, utilities or public safety as a result of granting a variance to the 40% maximum
slope.
This does not constitute a special privilege as it matches the other structures built in the
SDD.
The exceptional circumstance is that all of Lot C is more than 40%; this does not occur
in most other RC zone districts.
Public Benefits
The surrounding neighborhood along Buffehr Creek Road, also known as “The Valley”
after the original townhome project, is characterized as a narrow alpine valley with
significant stands of mature aspen trees. Lot C contains a large number of mature
aspens on the western half of the site, while the eastern half has many fewer aspens
and more sage and scrub oak coverage. By moving the access and building envelope
to the eastern half, we can leave undisturbed most of the mature aspens. New
landscaping and replanting around the new building area will allow a more natural
transition from the mature aspen stand to the sage and scrub oak hillside. With
significant numbers of wildlife living in the area, leaving areas of natural vegetation and
tree cover between houses may reduce impacts on wildlife. In sum, moving the access
and building envelope to the eastern portion of Lot C will result in a smaller amount of
impact to the character of the surrounding neighborhood in comparison to the existing
condition.