HomeMy WebLinkAbout4193 Spruce Way, Permit sheet worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 150 = $ 67.50
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x =
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks _ Sqft of Closure
Core Areas Heated Streetscape,$ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
FeeDa Lft of Closure
Single Lane $ 1.00 x x = ' $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure _
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Da Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x LI x I = $ -
Sub-total $ 67.50
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 120 = $ 36.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
r
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x $ -
Brick Paver $ 15.00 x $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ 50.00
Application/Inspection Fee $ 100.00
Total Permit Fee $ 217.50
4
.'? ^3 ^ 2 0 x $D X 1° -'2- p-fl
Zo 4-LH-Tofi`('= 'I.% 7c t4 = 'IcO°.
* 0 5 O,------------76
FiPWISpeclicationsRDWYStandardstPermitPee Worksheet.xis