Loading...
HomeMy WebLinkAboutDRB17-0339_A4a_1503939540.pdf1 - CREEK LEVEL 8,168' - 6 5/8" 2 - STREET LEVEL 8,178' - 2 3/8" 3 - SECOND LEVEL 8,188' - 3 5/8" 4 - THIRD LEVEL 8,197' - 9 5/8" 3 1 2 2 A3 36" HIGH GUARD RAIL WITH 4" SPACE BETWEEN CROSS MEMBERS TRASH / UTILITY ENCLOSURE TO BE HEIGHT OF EXISTING WALL WINDOWS IN WINDOW WELL RETRACTABLE AWNING Project number Date Drawn by 8/25/2017 9:50:25 AM A4a SOUTH ELEVATION VAIL ROWHOUSES, VAIL COLORADO ROW HOUSE 11 8/25/2017 BRM No. Description Date 3 AMENDED DRB SUBMITTAL 02 AUG 17 4 AMENDED DRB SUBMITTAL CORRECTION 25 AUG 17 1/4" = 1'-0" 1 EXISTING SOUTH ELEVATION 1/4" = 1'-0" 2 APPROVED SOUTH ELEVATION 1/4" = 1'-0" 3 PROPOSED SOUTH ELEVATION DRB APPROVED 8/28/2017 12:00:00 AM