Loading...
HomeMy WebLinkAboutDRB17-0371_A1.02 First Floor_1503691860.pdfMAIN FLOOR MODULES 1 2 3 4 5 6 7 8 THIRD FLOOR MODULES RevID ChID Change Name Date 01 8/24/17 evoDOMUS LLC 3143 W 33rd Street Cleveland, OH 44109 Phone : (216) 772-2603 Sheet Size: 24" x 36" Sheet Number: A1.02 Phase: Date: Project Number: STM Project Name: Sturm Residence Client: First Floor Drawing: First Floor Scale: 1/4" = 1'-0" PERMIT SET 8/10/2017 Paul and Leisa Sturm 5044 Main Gore Drive S Vail, Colorado 81657 Devepoler / Plan Preparer: Lot 2 Vail Meadows Filing No. 1 RWS Architectural Consulting 1361 Lakeland Ave. Lakewood, OH 44107 Phone: (216) 401-3830 rwshearer@gmail.com Robert W. Shearer, RA Colorado Registered Architect number: ARC.00404908 License Expires 10-31-2017 Architect: S ROBERT W. SHEARER 404908 R T A T E O F C O L O R A D O E G I S TE R E D A R C H I T E C T 209.1 (TT/FX/FX)(t) 310.1 7' 3' 211.1 7' 3' (TT/FX)(t) 15'-101/4" 15'-23/4" 27'-67/8" 5'-31/8" 9'-23/4" 40'-8" 61/8" 18'-73/4" 4'-23/4" 4'-21/4" 1'-11/4" 6'-0" 1'-10" 43/4" 8'-01/4" 6'-01/4" 2'-0" 8'-4" 1'-11/2" 3'-117/8" 4'-6" 6'-7" 1'-9" 3'-0" 3'-0" 7'-71/4" 5'-81/8" 4'-81/8" 4'-11/8" 61/8" 6'-65/8" 43/4" 2'-47/8" 43/4" 4'-71/2" 4'-3" 1'-41/8" 31/2" 6'-31/2" 61/8" 3'-0" 3'-0" 4'-91/4" 4" 8'-11 1/2" PATCH DRYWALL AT ALL MATING WALLS (ENTIRE BUILDING) BUILDING) NON-MODULE ROOF STRUCTURE PROVIDE AND INSTALL BUILT UP FLAT ROOFING SYSTEM. SEE SPECS FOR MORE INFORMATION. INTERNAL DRAIN FROM ROOF PANEL 1F BUILT-IN MAKE-UP VANITY ELEVATOR CAB 40"x54" CLEAR INTERIOR DRYWALL SHAFT - 3 SIDES; 3/4" PLYWOOD on RAIL SIDE SOFFIT SHOE SHELVES 3' HIGH BUILT-IN CHEST OF DRAWERS BUILT-IN CLOSET SYSTEM DN DOWN SPOUT DOWN SPOUT CLEAR GL. FOYER 201 STONE Installed by:LC A: 157 sq ft H: 8.50' STAIR 206 (LANDING) STONE Installed by:LC A: 37 sq ft H: 8.50' HALL 207 STONE Installed by:LC A: 43 sq ft H: 8.50' WC 208 STONE Installed by:LC A: 40 sq ft H: 8.50' MASTER BED 209 EWP-1 Installed by:LC A: 223 sq ft H: 8.50' WIC 210 EWP-1 Installed by:LC A: 65 sq ft H: 8.50' DECK Thermory A: 176 sq ft MASTER BATH 211 STONE Installed by:MC A: 195 sq ft H: 8.50' 202.1 (TT/FX/FX)(t) 211.1 (FX)(t) 209.3 (LS)(t) 6 5 3 4 eD 35.09.03 (TYP) 15'-101/4" 15'-23/4" 58'-113/4" 9'-35/8" 6'-0" 41/8" 1'-13/4" 41/8" 8'-5" 63/4" 8'-57/8" 9'-51/2" 4'-91/4" 8'-91/4" 41/8" 6'-87/8" 13'-33/8" 1'-113/8" 3'-6" 61/8" 8'-33/4" 43/4" 3'-6" 2'-0" 93/4" NON-MODULE ROOF AND STRUCTURE STEPS AND RETAINING WALLS BUILT-IN BENCH 6x6 GALVANIZED STEEL POST POWDER COATED TO MATCH METAL CLADDING AT BALCONY UP 18R UP 2R DN 7R SITE FRAMED, EWP CLAD BENCH w/ STEPDN 6R DN 4R DRB APPROVED 8/25/2017 12:00:00 AM