Loading...
HomeMy WebLinkAboutDRB17-0369_DRB17-0369 action form_1504801740.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Horton Residence 2017 Application Number:DRB17-0369 Application Type:Exterior Alteration Date Applied:08/15/2017 Project Description: Replacement of all exterior doors and windows (except for garage doors). Most windows to be replaced in the same location / size / style. A few windows & doors are in new locations or new style - see exterior elevations. Extend height of stucco (decrease height of wood siding) above front entry at north elevation and around west elevation / stair bump out, to create a better proportion of base / middle / top. Replace existing skylights in same size / location as is existing. Replace existing chimney cap with new shroud. The existing chimney cap no longer meets the current flue code requirements (interior replacement of fireplaces). The addition / replacement of exterior lighting as shown on the exterior elevations. Interior remodel. CONTACTS Contact Type:Applicant Full Name:StudioHOFF Architecture (Katrina Eckelhoff) Address:777 Columbine Street Denver, CO 80206 Phone:7202354491 Contact Type:Property Owner Full Name:Michael Horton Address:Phone:720-883-7969 Project Address:1380 WESTHAVEN CIR A (210312403047 A) (210312403047) Job Site Location:A Legal Description:Subdivision:GLEN LYON SUBDIVISION Lot:22 Block:No Data Parcel Number:210312403047 BOARDS/STAFF ACTION Motion By:Kjesbo Action:Approved Second By:Cahill Vote:5-0-0 Date:09/06/2017 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Planner: Jonathan Spence