HomeMy WebLinkAboutaction_form_drb_09-06-2017_59b02a4ae36c3-0.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Little Free Libraries 2017 Application Number:DRB17-0386
Application Type:Exterior Alteration Date Applied:08/25/2017
Project Description:
Install a Little Free Library box in Ellefson Park on the northern edge next to the
Dog bag dispenser. The site is away from irrigation lines and off the path so it
will not interfere with snow removal.
CONTACTS
Contact Type:Applicant
Full Name:Vail Public Library (Cricket Pylman)
Address:292 W Meadow Dr 292 W Meadow Dr Vail, CO 81657 Phone:9704792179
Contact Type:Property Owner
Full Name:TOWN OF VAIL
Address:Phone:None
Project Address:2485 GARMISCH DR (210311429001) (210311429001)
Job Site Location:
Legal Description:Subdivision:VAIL DAS SCHONE FILING 2 Lot:1 Block:H
Parcel Number:210311429001
BOARDS/STAFF ACTION
Motion By:Action:Staff Approved
Second By:
Vote:Date:08/30/2017
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Applicant shall revegetate all soils disturbed during the construction and installation of this project.
- Prior to installation, the Applicant shall consult with Gregg Barrie in the Town of Vail Public Works
Department to confirm that the installation will not disturb any underground utilities or irrigation lines.
Planner: Chris Neubecker