HomeMy WebLinkAboutaction_form_drb_09-08-2017_59b30d234389d-0.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Holiday House Waterproofing
2017 Application Number:DRB17-0393
Application Type:Exterior Alteration Date Applied:08/29/2017
Project Description:
Project is to re-waterproof existing underground garage roof that is leaking.
Remove 3-4” soil that is on top of roof, reinstall after waterproofing is completed
Clean/waterproof garage roof as per BC&E directives Plants will be replaced
with same as existing Flagstone sand set walkway will be removed and re-install
as existing Existing snowmelt will be serviced Stone veneer as marked in images
to match the veneer on the rest of the building. Just carrying the look around to
entryway Stone in roof drip zone along foundation where new stone veneer is
proposed to match existing on property.
CONTACTS
Contact Type:Applicant
Full Name:Dan Muller
Address:Phone:970-331-4874
Contact Type:Property Owner
Full Name:Common Area
Address:Phone:None
Project Address:9 VAIL RD (210107106999)
Job Site Location:
Legal Description:Subdivision:VAIL VILLAGE FILING 2 Lot:B Block:No
Data
Parcel Number:210107106999
BOARDS/STAFF ACTION
Motion By:Action:Tabled
Second By:
Vote:Date:09/08/2017
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Applicant shall ensure that new stone wainscoting and stone caps match the existing stone wainscoting and
stone caps on the building in materials, colors, texture, and height.
Planner: Chris Neubecker