Loading...
HomeMy WebLinkAboutaction_form_drb_09-08-2017_59b30d552ae34-0.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Holiday House Waterproofing 2017 Application Number:DRB17-0393 Application Type:Exterior Alteration Date Applied:08/29/2017 Project Description: Project is to re-waterproof existing underground garage roof that is leaking. Remove 3-4” soil that is on top of roof, reinstall after waterproofing is completed Clean/waterproof garage roof as per BC&E directives Plants will be replaced with same as existing Flagstone sand set walkway will be removed and re-install as existing Existing snowmelt will be serviced Stone veneer as marked in images to match the veneer on the rest of the building. Just carrying the look around to entryway Stone in roof drip zone along foundation where new stone veneer is proposed to match existing on property. CONTACTS Contact Type:Applicant Full Name:Dan Muller Address:Phone:970-331-4874 Contact Type:Property Owner Full Name:Common Area Address:Phone:None Project Address:9 VAIL RD (210107106999) Job Site Location: Legal Description:Subdivision:VAIL VILLAGE FILING 2 Lot:B Block:No Data Parcel Number:210107106999 BOARDS/STAFF ACTION Motion By:Action:Staff Approved Second By: Vote:Date:09/08/2017 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Applicant shall ensure that new stone wainscoting and stone caps match the existing stone wainscoting and stone caps on the building in materials, colors, texture, and height. Planner: Chris Neubecker