HomeMy WebLinkAbout4367 Columbine Permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 10 x 100 = $ 150.00
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x ._ = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
FeeDa Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months S ft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Da Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x II x 1 = $ -
Sub-total $ 150.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACCIPCC $ 0.30 x 80 - $ 24.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACCIPCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x a $ -
Non-Paved Surface $ 0.25 ' $ -
Sub-Total $ 50.00
Applicationllnspection Fee $ 100.00
Total Permit Fee $ 300.00
ti-3 b 7 Co lkn,.Ila ____jaz1(
. - c - i'DI,L> 1 co- 2'
F.IPWISpecifications1RDWY StandardslPermit Fee Worksheetxis2-0 i + D" X101 0' ( O O.
20 4} 't Zo '--s- 7L 10 5 O V , ° 0
01.5 0 /),-(p) L-- ( coo op