Loading...
HomeMy WebLinkAboutUA&V ERWSD copy.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan,floor plan, and elevations, shall be submitted to the following utilities fpr approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FRAM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail, Subject Pro( erty Address) 4367 Columbine, Vail 81657 ' Lot2 Block 6 Subdivision: Bighorn 3rd Addition Primary CpntactLow er •• :presentative: Scott Hoffman Phone: (970) 376-0292 c--- c '-- Plans Dated: 12.23.2016 Primary Cotjtact/Owne presbptative Signature �j� Authorized Signature Comments Date CENTURY LINK .. 970.328.$288(tel) 970.328.8282(fax) Contacts: Kelly McClernon Kelly,mcalernorl@centurylink.com XCEL HIGH PRESSURE OAS 970.262.4077(tel) 970,468,1401 (fax) Contact: Reuben Miller reubenimiller@xcelenergy.com }IDLY CROSS ENERGY 970.947.5425(tel) ' 970.945,4081 (fax) Contact:Jeff Vroom )vroom(gbolycross.com XCEL Energy 970.262.4032(tel) 970,262.4038(fax) Contacts;Britt Mace , brittany.mace@xcelen ergy.com , pAGLE RIVER WATER&SANITATION ;D i 970TRt.T I(�I T�tA - L ov� A Cat,necun I I' j ' 970.477.6449(tel) 1 ./ (App�tc4\oy, Ct y,1WWvL.gfr's t 0Y9 970.845.72187218(fax) Q��----// 1 A t Contact:Tug Birk ;0 f yi.4 wt.(�fyict, dbirk@erwsd.org CG,nnot- -hit inb . ogithoi2. COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Mich ael4ohnsen@cable.colncast.com CDOT(Only in CDOT Right-of-way) .. 970.683.6284(tel) Contact: pan Roussin Danlelsoussinedot.state.co.us NOTESt 1. Utility locations must be obtained before digging, 2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the Public Works Department for verification 970,479,2198, 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. • 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date,