HomeMy WebLinkAboutUA&V ERWSD copy.pdf UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan,floor plan, and elevations, shall be submitted
to the following utilities fpr approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FRAM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail,
Subject Pro( erty Address) 4367 Columbine, Vail 81657 ' Lot2 Block 6 Subdivision: Bighorn 3rd Addition
Primary CpntactLow er •• :presentative: Scott Hoffman Phone: (970) 376-0292
c---
c '-- Plans Dated: 12.23.2016
Primary Cotjtact/Owne presbptative Signature
�j� Authorized Signature Comments Date
CENTURY LINK ..
970.328.$288(tel)
970.328.8282(fax)
Contacts: Kelly McClernon
Kelly,mcalernorl@centurylink.com
XCEL HIGH PRESSURE OAS
970.262.4077(tel)
970,468,1401 (fax)
Contact: Reuben Miller
reubenimiller@xcelenergy.com
}IDLY CROSS ENERGY
970.947.5425(tel) '
970.945,4081 (fax)
Contact:Jeff Vroom
)vroom(gbolycross.com
XCEL Energy
970.262.4032(tel)
970,262.4038(fax)
Contacts;Britt Mace ,
brittany.mace@xcelen ergy.com ,
pAGLE RIVER WATER&SANITATION ;D i
970TRt.T I(�I T�tA - L ov� A Cat,necun I I' j '
970.477.6449(tel) 1 ./ (App�tc4\oy, Ct y,1WWvL.gfr's t 0Y9
970.845.72187218(fax) Q��----// 1
A t
Contact:Tug Birk ;0 f yi.4 wt.(�fyict,
dbirk@erwsd.org CG,nnot- -hit inb . ogithoi2.
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact:Michael Johnson
Mich ael4ohnsen@cable.colncast.com
CDOT(Only in CDOT Right-of-way) ..
970.683.6284(tel)
Contact: pan Roussin
Danlelsoussinedot.state.co.us
NOTESt
1. Utility locations must be obtained before digging,
2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the
Public Works Department for verification 970,479,2198,
3. It is the responsibility of the utility company and the applicant to resolve problems identified above. •
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date,