Loading...
HomeMy WebLinkAboutA14-0043 Scope Letter.pdf talCD 6240 Smith Road Fire & Denver,Co 80216 Security Tel: (303)355-0500 Fax: (303)355-0615 Mike Vaughan Town of Vail Fire Marshal Vail Fire&Emergency Services 42 West Meadow Drive Vail, Colorado 81657 Re: Penthouse Unit 572 Remodel at The Lodge at Vail 08/13/14 Mike, Scope of Work: We have been contracted by SRE Building Associates to perform work to the existing SimplexGrinnell FACP located at The Lodge at Vail, 174 Gore Creek Dr.Vail Co. 81657 for the remodel improvement to the residential Penthouse Unit.572. In this package we are including a pdf of the modified floor plan, cut sheets of new devices, battery calculations for the affected panel,new circuit addressing chart for the affected SLC and this letter. Please consider this package as our request for a permit to be issuedfor the following work: Prior to Construction: 1. Install and wire six new Heat Detectors with new bases.Extend 24v aux power to new Sounder Bases. • During construction: 2. Relocate two existing wall mount Speakers in larger Bedrooms to new locations on wall. Reconnect to existing Speaker circuit. 3. Two existing wall mount Speakers in smaller Bedrooms to be removed and new ceiling mount Speakers tobe installed.Reconnect to existing Speaker circuit. 4. Install four System Sensor CO Detectors and four IAM Monitor Modules in bedrooms. 5. Remove and cover existing Pull Station in Elevator Lobby. Existing Smoke Detector in Elevator Lobby shall remain. 6. Remove and cover existing wall mount Speaker/Strobe in Elevator Lobby, and install new ceiling mount Speaker/Strobe in Elevator Lobby. Connect to existing Nac and Speaker circuit in Elevator Lobby. 7. Remove and cover three existing Smoke Detectors. • 8. Remove existing FCU control switches in Entry Foyer.Existing automatic functions related to the fan coil units shall be maintained. 9. All Speakers in unit 572 will be set at 1/4 watt. Post Construction: 10. Replace Heat Detectors installed prior to construction with Smoke Detectors. 11. Install all devices roughed in during construction. 12. Pretest all changes prior to final inspection. 13. SimplexGrinnell will call for the final AHJ inspection. Please let us know if we can furnish any other information to aid in your review process. Thank you, JJ Nancy Wiltsie Project Engineer NICET III (Cert. # 93727,thru 3/01/15) SimplexGrinnell 6240 Smith Road Denver, Colorado 80216 Phone: 303-355-0500