HomeMy WebLinkAboutB17-0305_1709 GENEVA DUPLEX - action_form_drb_06-29-2017_1501884360.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:H-B 1709 Geneva LLC 2017 Application Number:DRB17-0212
Application Type:New Construction Date Applied:05/30/2017
Project Description:Demolition of existing small house. Proposed Primary/Secondary Duplex.
CONTACTS
Contact Type:Applicant
Full Name:Martin Manley Architects (John Martin)
Address:John G Martin Architect PO Box 4701 Eagle, CO 81631 Phone:9703280592
Contact Type:Property Owner
Full Name:H-B 1709 GENEVA LLC (Dave Hilb)
Address:Phone:9703762742
Project Address:1709 GENEVA DR (210312312028) (210312312028)
Job Site Location:
Legal Description:Subdivision:MATTERHORN VILLAGE FILING 1 Lot:4 Block:No
Data
Parcel Number:210312312028
BOARDS/STAFF ACTION
Motion By:Kjesbo Action:Approved
Second By:Cahill
Vote:5-0-0 Date:06/21/2017
Conditions:
- This property is located in a "geologically sensitive area" pursuant to Chapter 12-21, Hazard Regulations,
Vail Town Code.
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Any heated portion of the driveway located within the right of way must be in a separate zone. The four (4)
foot concrete pan cannot be heated, Pursuant to Section 14-3-2, Other Requirements, Vail Town Code.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Prior to issuance of a building permit, the Applicant shall submit a revised landscaping plan showing the
addition of six (6) aspen trees a minimum of 2 ½” caliper along the north property line, between the driveway
and the property line.
- The applicant for this project is required to submit a foundation Improvement Location Certificate (ILC)
showing the foundation of the structure in compliance with the approved development plan in conjunction with
the building permit inspection process.
- The applicant for this project is required to submit a framing Improvement Location Certificate (ILC) showing
ridge and eave elevations in compliance with the approved development plan in conjunction with the building
permit inspection process.
Planner: Chris Neubecker