Loading...
HomeMy WebLinkAboutBridge Street Closure. Crane.pdfBridge Street Full Street Closure, Vail Village. On September 26th from 7:00am until 5:30pm there will be a full street closure at 304 Bridge Street for the Red Lion Condo 3 Renovation Project. Closure is required to allow staging of a 40 ton crane. Traffic control will be provided at the bottom of Bridge Street to guide deliveries and pedestrians to the top of Bridge street. Pedestrian access will not be impeded. Contact: Kevin Fifield – Superintendent, Beck Building Co. Cell: 970-904-1283, Office: 970-949-1800 BECK BUILDING COMPANY Construction Notice: